Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1992-008, :on 920301,standby Gas Treatment Sys Fan Flow Limiter Setpoint Error Identified.Caused by Analysis Deficiency.Investigation Into Instrument Setpoint Accuracy Ongoing + (10:29:21, 8 January 2025)
- ML17289A438 + (10:29:22, 8 January 2025)
- 05000397/LER-1991-029, :on 911031,discovered That Incorrect Containment Atmospheric Control Recycle Flow Control Controllers Installed in Both Divs in Control Room.Caused by Less than Adequate Design.Procedures Changed + (10:29:23, 8 January 2025)
- GO2-92-080, Provides Corrections to Annual Reporting Requirements Re Level of Property & Liability Insurance Coverage in Force at Facility,Initially Submitted Via Util + (10:29:24, 8 January 2025)
- GO2-92-075, Submits Rept on Level of Property & Liability Insurance Coverage in Force,Per 10CFR50.54(w)(2) + (10:29:25, 8 January 2025)
- 05000397/LER-1992-007, :on 920225,both Divs of Primary Containment Atmosphere Control Hydrogen Recombiner Sys Inoperable & Plant Shutdown Initiated.Caused by Less than Adequate Design.Design Changes Implemented + (10:29:28, 8 January 2025)
- TAC:M81515 + (10:29:28, 8 January 2025)
- ML17289A430 + (10:29:29, 8 January 2025)
- ML17289A428 + (10:29:30, 8 January 2025)
- GO2-92-070, Responds to SALP Rept Covering Period 900901-911231.Plans to Improve Performance for Plant Operations & Safety Assessment/Quality Verification Provided + (10:29:31, 8 January 2025)
- TAC:M77801 + (10:29:32, 8 January 2025)
- ML17289A426 + (10:29:33, 8 January 2025)
- ML17289A423 + (10:29:34, 8 January 2025)
- ML17289A422 + (10:29:34, 8 January 2025)
- TAC:M82755 + (10:29:35, 8 January 2025)
- ML17289A421 + (10:29:36, 8 January 2025)
- ML17289A420 + (10:29:37, 8 January 2025)
- ML17289A418 + (10:29:38, 8 January 2025)
- 05000397/LER-1991-013-02, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-46.Corrective Actions:Quality Action Team Has Been Authorized to Recommend Potential Improvements in TS Surveillance Program,As Documented in LER 91-013-02 + (10:29:39, 8 January 2025)
- GO2-92-066, Suppls 920213 Response to Violations Noted in Insp Rept 50-397/91-44.Corrective Actions:Pipe Supports Restored to Configuration on Drawings & Missing Pipe Support Nuts Replaced & Loose Items Tightened + (10:29:40, 8 January 2025)
- 05000397/LER-1992-005, :on 920219,thermal Overloads Prevented Motors from Performing Safety Functions.Caused by Misapplication of Design Inputs.Motors Replaced + (10:29:42, 8 January 2025)
- 05000397/LER-1992-006, :on 920220,reactor Bldg to Suppression Chamber Vacuum Breaker Setpoints Were Incorrectly Set.Caused by Analysis Deficiency.Setpoint Documentation Changed & Procedures Deviated & Setpoints Reset + (10:29:43, 8 January 2025)
- ML17289A407 + (10:29:46, 8 January 2025)
- ML17289A408 + (10:29:46, 8 January 2025)
- GO2-92-064, Application for Amend to License NPF-21,revising TS 4.6.6.1.b.3 Re Primary Containment Atmosphere Control + (10:29:47, 8 January 2025)
- ML17289A405 + (10:29:47, 8 January 2025)
- GO2-92-058, Monthly Operating Rept for Feb 1992 for WPPS-2 + (10:29:53, 8 January 2025)
- ML17289A402 + (10:29:53, 8 January 2025)
- ML17289A395 + (10:29:58, 8 January 2025)
- ML17289A396 + (10:29:58, 8 January 2025)
- ML17289A394 + (10:29:59, 8 January 2025)
- ML17289A393 + (10:29:59, 8 January 2025)
- GO2-92-061, Requests Relief from Tech Specs 4.6.6.1.b.3, Containment Atmosphere Control & Provides Appropriate Acceptance Criterion + (10:30:00, 8 January 2025)
- ML17289A391 + (10:30:00, 8 January 2025)
- ML17289A389 + (10:30:04, 8 January 2025)
- IR 05000397/1992007 + (10:30:05, 8 January 2025)
- ML17289A386 + (10:30:07, 8 January 2025)
- ML17289A384 + (10:30:08, 8 January 2025)
- GO2-92-062, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-42 on 911104 to 1206.Corrective Actions:Personnel Being Trained in Preparation & Review of 10CFR50.59 Reviews & Safety Evaluations + (10:30:09, 8 January 2025)
- TAC:M82488 + (10:30:12, 8 January 2025)
- ML17289A381 + (10:30:13, 8 January 2025)
- GO2-92-056, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-397/91-44 on 911104-1208.Corrective Actions:Plant Sys Operating Procedures PPM 2.3.3A/B Revised + (10:30:14, 8 January 2025)
- ML17289A379 + (10:30:16, 8 January 2025)
- GO2-92-054, Washington Nuclear Power Plant Unit 2 Annual Operating Rept + (10:30:17, 8 January 2025)
- 05000397/LER-1992-004, :on 920227,noted Scram Discharge Vol Level Switches Not Tested Post Scram as Required.Caused by Testing Not Being Performed.Corrective Actions Were Not Required + (10:30:24, 8 January 2025)
- GO2-92-053, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 + (10:30:25, 8 January 2025)
- GO2-92-051, Advises That All Elements of Reg Guide 5.66 Implemented to Satisfy Requirements of 10CFR73.56 Re Personnel Access Authorization for Nuclear Power Plants + (10:30:28, 8 January 2025)
- ML17289A370 + (10:30:33, 8 January 2025)
- ML17289A371 + (10:30:33, 8 January 2025)
- ML17289A368 + (10:30:34, 8 January 2025)
- GO2-92-050, Responds Further to 10CFR50,Appendix E,Section VI.4.a. on Requirement to Submit Emergency Response Data Sys Plan by 911028.Util Will Use Plant Prime Computer W/New Software to Assure Compliance & 60 Min Response Per 10CFR50.72(a)(4) + (10:30:35, 8 January 2025)
- GO2-92-036, Provides Clarification of Duties of Third Staff Reactor Operator During Normal & Emergency Plant Operations + (10:30:38, 8 January 2025)