Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17311B103 + (05:21:30, 8 January 2025)
- ML17311B102 + (05:21:31, 8 January 2025)
- ML17311B100 + (05:21:31, 8 January 2025)
- ML17311B097 + (05:21:32, 8 January 2025)
- ML17311B093 + (05:21:35, 8 January 2025)
- ML17311B091 + (05:21:37, 8 January 2025)
- ML17311B089 + (05:21:38, 8 January 2025)
- ML17311B087 + (05:21:39, 8 January 2025)
- 05000529/LER-1994-005-02, :on 941019,completed TS Required Shutdown Due to Expiration of LCO Time Limit.Design Change Options Identified & Will Be Reviewed to Determine If Valve &/Or Motor Operator Replacement or Mod Necessary + (05:21:40, 8 January 2025)
- 05000529/LER-1994-005, Forwards Suppl 1 to LER 94-005,providing Updated Info on Cause & Corrective Actions of TS Required Shutdown Due to Expiration of LCO Time Limit,Including Revised Energy Industry Identification Sys Codes + (05:21:41, 8 January 2025)
- ML17311B080 + (05:21:43, 8 January 2025)
- ML17311B078 + (05:21:44, 8 January 2025)
- ML17311B077 + (05:21:46, 8 January 2025)
- ML17311B074 + (05:21:47, 8 January 2025)
- ML17311B076 + (05:21:47, 8 January 2025)
- ML17311B073 + (05:21:48, 8 January 2025)
- 05000529/LER-1995-004-01, :on 950706,identified Four Occassions Between 950407 & 0630 When Conditional Surveillance in TS LCO 3.8.4.1 Action a Not Performed Due to Inattention to Detail. CR Copy of Temporary Procedure 40TP-9ZZ04 Corrected + (05:21:50, 8 January 2025)
- ML17311B070 + (05:21:50, 8 January 2025)
- ML17311B069 + (05:21:51, 8 January 2025)
- ML17311B067 + (05:21:52, 8 January 2025)
- TAC:M88217 + (05:21:52, 8 January 2025)
- ML17311B066 + (05:21:53, 8 January 2025)
- IR 05000528/1995013 + (05:21:55, 8 January 2025)
- ML17311B060 + (05:21:56, 8 January 2025)
- ML17311B059 + (05:21:57, 8 January 2025)
- ML17311B056 + (05:21:58, 8 January 2025)
- ML17311B045 + (05:21:59, 8 January 2025)
- ML17311B044 + (05:21:59, 8 January 2025)
- ML17311B042 + (05:22:00, 8 January 2025)
- IR 05000528/1995006 + (05:22:01, 8 January 2025)
- ML17311B040 + (05:22:02, 8 January 2025)
- ML17311B038 + (05:22:03, 8 January 2025)
- IR 05000529/1995008 + (05:22:04, 8 January 2025)
- ML17311B035 + (05:22:05, 8 January 2025)
- ML17311B034 + (05:22:06, 8 January 2025)
- ML17311B031 + (05:22:07, 8 January 2025)
- ML17311B022 + (05:22:07, 8 January 2025)
- ML17311B030 + (05:22:07, 8 January 2025)
- ML17311B020 + (05:22:08, 8 January 2025)
- ML17311B021 + (05:22:08, 8 January 2025)
- ML17311B018 + (05:22:10, 8 January 2025)
- ML17311B009 + (05:22:10, 8 January 2025)
- 05000529/LER-1995-003, :on 950613,TS LCO 3.0.3 Entered Following Loss of Both Trains of Essential Cw Sys & Both Hydrogen Recombiners.Caused by Spurious Actuations Due to Broken EDG Speed Probe Connector.Connector Replaced + (05:22:11, 8 January 2025)
- ML17311B007 + (05:22:12, 8 January 2025)
- 05000528/LER-1994-008, :on 940929,identified That Preventive Maintenance Task for Calibrating Boronometer Overdue.Caused by Personnel Error.Procedure Revised to Address Condition + (05:22:13, 8 January 2025)
- 05000528/LER-1994-004, :on 941006,Train a Declared Inoperable Due to Projection of Test Results Indicated Battery Banks Did Not Meet 90% Criteria of TS SR 4.8.2.1.e.Caused by Loss of Positive Active Matl.Proposed TS Amend Submitted + (05:22:15, 8 January 2025)
- 05000528/LER-1994-009, :on 941118,determined That Letdown Isolation Valve Could Not Satisfy 10CFR50,App R Related Requirement. Caused by Personnel Error.Procedure Changes Implemented Which Eliminate Reliance on Isolation Valve During Shutdown + (05:22:16, 8 January 2025)
- 05000528/LER-1994-006, :on 941021,identified That Actual Flow Rate on Spray Pond Pumps May Be Exceeding Design Flow Rates.Caused by Oversized Orifices in Spray Pond Return Lines. Administrative Controls Established to Counter Condition + (05:22:18, 8 January 2025)
- 05000528/LER-1994-005, :on 940619,determined That CPC Channel D,Delta- T Power Signal Could No Longer Be Adjusted Per TS Requirements.Caused by Loop 2 Hot Leg Temp RTD Fluctuations. Channel Calibrated & Declared Operable + (05:22:19, 8 January 2025)
- EPID:L-2017-LLA-0350 + (05:22:20, 8 January 2025)
- ML17311A994 + (05:22:20, 8 January 2025)
- ML17311A998 + (05:22:20, 8 January 2025)