Provides Addl Info for Ref Requested Amend to TS Section 3/4.7.1.3.Original Uncertainty for Condensate Storage Tank Indicated Level Did Not Address All of Uncertainties & Error Terms
ML17311B031
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/05/1995
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03414-WLS-S, 102-3414-WLS-S, NUDOCS 9507140201
Download: ML17311B031 (4)


Text

PRIORITY 1 (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9'507140201 DOC.DATE: 95/07/05 NOTARIZED: NO DOCKET N

, FACIL:STN-,50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 p

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3,,Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION R

STEWART,W.L.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBZECT: Provides addi info for ref requested amend to TS Section 3/4.7.1.3.Original uncertainty for condensate storage tank indicated level did not address all of uncertainties

& error terms.

0 DISTRIBUTION CODE:

A001D COPIES RECEIVED LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

05000528 T

05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 LA HOLIAN, B THOMAS,C INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD4-2 PD TRAN,L FILE CENTER 1

RR/DRCH" CB NRR/DSSA/SRXB OGC/HDS2 NRC PDR COPIES LTTR ENCL N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5D8 (415-2083)

TO ELZMZNATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL ~9

h

WILLIAML, STEWART EXECUTIVEVICEPAESIDENT NUCI.EAA Arizona Public Service Company P,O. BOX 53999

~

PHOENIX. ARIZONA85072-3999 102-0341 4-WLS/SAB/RKR July 5, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Reference:

1)

Letter No. 102-02884, dated March 28, 1994, from W. F. Conway, Executive Vice President, Nuclear, APS, to USNRC

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Request for Additional information for Proposed Amendment to Technical Specification Section 3/4.7.1.3 This submittal provides additional information for the requested amendment to Technical Specification 3/4.7.1.3 (Reference

1) ~

APS engineering, as part of the Design Basis reconstitution program, found that the original uncertainty for the condensate storage tank (CST) indicated level (+/- 6 inches) did not address all of the uncertainties and error terms. APS engineering subsequently performed setpoint verification calculations and the uncertainty for the CST indicated level has been revised to +/- 18 inches.

Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.

Sincerely, WLS/SAB/RKR/rv cc:

L. J. Callan K. E. Perkins B. E. Holian K. E. Johnston A. V. Godwin ARRA 9507140201 950705 PDR'DQCK 05000528 P