ML17311B034

From kanterella
Jump to navigation Jump to search
Discusses NRC Requirements of Licensee for NRC to Perform Scheduled Licensed Operator Exams During Week of 951023 at Plant
ML17311B034
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/12/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9507170130
Download: ML17311B034 (10)


Text

I gR REG(((

J

,Q.

JQAj

@+44 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 6064 JUL l 2 l995 Arizona Public Service Company ATTN:

William L. Stewart Executive Vice President, Nuclear P.O.

Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

LICENSED OPERATOR EXAMINATIONS AT PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2,

AND 3, INSPECTION REPORT NO. 50-528/95-15; 50-529/95-16; 50-530/95-16 In a telephone conversation on May 23, 1995 between Messrs.

J. Pellet and G. Box, arrangements were made for the administration of licensing examinations at the Palo Verde Nuclear Generating Station, Units I, 2, and 3.

The examinations are scheduled for the week of October 23, 1995.

Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in Revision 7 of NUREG-1021, "Operator Licensing Examiner Standards,"

(ES-201, Attachment

4) during the week of October 10, 1995.

To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2

of ES-201 by July 21, 1995.

Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may 'result in the examinations being rescheduled.

The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above.

Your staff should retain the original simulator performance data (e.g.,

system pressures, temperatures, and. levels) generated during the dynamic operating tests until the examination results are final.

ES-402, Attachment 2,

and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and eva'luate any requested waivers.

If the 9507170130 950712 PDR ADQCK 05000528 V

PDR

l 0

Arizona Public Service Company applications are not received at least 30 days before the examination date, a

postponement may be necessary.

Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OHB) Clearance Number 3150-0101, which expires October 31, 1995.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Hail Stop T-6 F30, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C.

20555; and to the Paperwork Reduction Project (3150-0101),

Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C.

20503.

Thank you for your cooperation in this matter.

Mr. Nunez has been advised of the policies and guidelines referenced in this letter.

If you have any questions regarding the NRC's examination procedures and guidelines, please contact Hr.

Ryan Lantz at (817)860-8158 or John Pellet at (817)860-8159.

Sincerely, Dockets:

50-528 50-529 50-530 Licenses:

NPF-41 NPF-51 NPF-74 r

omas P.

y

, Director Division of Reactor Safety Arizona Corporation Commission ATTN:

Hr. Steve Olea 1200 W. Washington Street

Phoenix, Arizona 85007 Southern California Edison Company ATTN:

T.

E. Oubre, Esq.

P.O, Box 800

Rosemead, California 91770 Arizona Radiation Regulatory Agency ATTN:

Aubrey V. Godwin, Director 4814 South 40 Street

Phoenix, Arizona 85040

Arizona Public Service Company Haricopa County Board of Supervisors ATTN:

Chairman ill South Third Avenue

Phoenix, Arizona 85003 Palo Verde Services ATTN:

Curtis Hoskins, Executive Vice President and Chief Operating Officer 2025 N. 3rd Street, Suite 220

Phoenix, Arizona 85004 Akin, Gump, Strauss, Hauer and feld El 'Paso Electric Company ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333 New Hampshire Avenue, Suite 400 Washington, D.C, 20036 Arizona Public Service Company ATTN:

Angela K. Krainik, Hanager Nuclear Licensing P.O.

Box 52034

Phoenix, Arizona 85072-2034

Arizona Publ ic Servi ce Company E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System (IPAS) bcc to DMB (IEOl)

DRS,

DRP, and Decommissioning bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

S. Richards (NRR/HOLB HS:

OWF 10 D 22)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUHENT NAHE:

To receive copy of document, indicate in box: "C" ~ Copy without enclosures "E" ~ Copy with enclosures "N". ~ No copy

  • Concurred vi a E-mail D:DRP BBeach

//I/95 OFFICIAL RECORD COPY RI: DRS C

RIV:C:OB C.

D:DRS RLantz*

JLPellet TPGw nn 06/

/95 0 /0'7/95

~

/!o /95 D:DRS TPGw nn w'

1 1

l jl l

f

~

~

Arizona Public Service Company E-Hail report to D. Sullivan (DJS)

E-Hail report to NRR Event Tracking System

( IPAS) bcc to DMB (IEOl)

DRS,

DRP, and Decommissioning bcc distrib.

by RIV:

L. J. Callan DRSS-F IPB Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

S.

Richards (NRR/HOLB HS:

OWF 10 0 22)

Resident Inspector HIS System RIV File Branch Chief (DRP/TSS)

B. Henderson (PAO, WCFO)

DOCUHENT NAHE:

To receive copy of document, indicete in box:

C" ~ Copy without enclosures "E

~ Copy with enclosures "N

~ No copy

  • Concurred via E-mail RI:DRS RLantz*

06/

/95 RIV:C:OB C

JLPellet

~4 o /'-(/95 0:DRS

/J TPGw nn

/ic /95 0:DRP BBeach

////95 0:DRS TPGw nn c~ ~:

OFFICIAL RECORD COPY p ~ q 'X

~ g! sg!,i p

~

~

i

,