Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199J736 + (09:20:18, 8 December 2024)
- ML20199J733 + (09:20:19, 8 December 2024)
- 05000346/LER-1986-005, :on 851221,discovered Inadequate Axial Seam Overlap on 93 as-installed Bisco Boot Seals.Caused by Lack of Clarity in Bisco Procedure Sp 505.New Installation Procedure MP 1700.29 Approved + (09:20:21, 8 December 2024)
- ML20199J731 + (09:20:22, 8 December 2024)
- GO2-98-016, Informs That Commitment to Perform Chemical Decontamination of Reactor Recirculation Sys Discharge Piping During R13 Outage in Spring 1998,is Modified.Chemical Decontamination Will Not Be Performed During R13 Outage + (09:20:23, 8 December 2024)
- ML20199J727 + (09:20:26, 8 December 2024)
- ML20199J725 + (09:20:27, 8 December 2024)
- ML20199J721 + (09:20:28, 8 December 2024)
- ML20199J724 + (09:20:28, 8 December 2024)
- ML20199J719 + (09:20:29, 8 December 2024)
- ML20199J718 + (09:20:29, 8 December 2024)
- ML20199J717 + (09:20:30, 8 December 2024)
- ML20199J713 + (09:20:31, 8 December 2024)
- ML20199J710 + (09:20:32, 8 December 2024)
- ML20199J711 + (09:20:32, 8 December 2024)
- 05000482/LER-1986-073-01, Forwards LER 86-073-01,re Event in Which Wolf Creek TSs Were Not Met.Commitments Made by Util,Encl + (09:20:35, 8 December 2024)
- ML20199J706 + (09:20:36, 8 December 2024)
- ML20199J701 + (09:20:37, 8 December 2024)
- 05000269/LER-1986-007-02, :on 860502,discovered That Two Channels of Reactor Protective Sys (RPS) Inoperable at Same Time During Adjustment of hi-flux Trip Setpoint.Caused by Failure to Properly Tag Inoperable Module in RPS Cabinet + (09:20:38, 8 December 2024)
- ML20199J699 + (09:20:39, 8 December 2024)
- ML20199J698 + (09:20:40, 8 December 2024)
- ML20199J696 + (09:20:41, 8 December 2024)
- ML20199J695 + (09:20:41, 8 December 2024)
- ML20199J692 + (09:20:49, 8 December 2024)
- ML20199J690 + (09:20:56, 8 December 2024)
- ML20199J686 + (09:21:02, 8 December 2024)
- ML20199J685 + (09:21:03, 8 December 2024)
- ML20199J684 + (09:21:04, 8 December 2024)
- ML20199J681 + (09:21:04, 8 December 2024)
- ML20199J680 + (09:21:05, 8 December 2024)
- ML20199J677 + (09:21:06, 8 December 2024)
- ML20199J675 + (09:21:07, 8 December 2024)
- ML20199J670 + (09:21:15, 8 December 2024)
- ML20199J669 + (09:21:16, 8 December 2024)
- ML20199J665 + (09:21:24, 8 December 2024)
- ML20199J663 + (09:21:25, 8 December 2024)
- ML20199J662 + (09:21:31, 8 December 2024)
- ML20199J659 + (09:21:32, 8 December 2024)
- ML20199J657 + (09:21:33, 8 December 2024)
- 05000440/LER-1986-021, :on 860602,discovered That Five Recirculation Damper Actuators in Diesel Generator Bldg Ventilation Sys Inoperable Due to Seal Failures.Caused by Expiration of Seal Life & Improper Storage & Maint.Seals Replaced + (09:21:34, 8 December 2024)
- ML20199J655 + (09:21:35, 8 December 2024)
- ML20199J654 + (09:21:36, 8 December 2024)
- ML20199J652 + (09:21:37, 8 December 2024)
- ML20199J649 + (09:21:38, 8 December 2024)
- NOC-AE-0017, Forwards Results of Control Rod Testing in Response to NRC Bulletin 96-001, Control Rod Insertion Problems. Encl Consists of Core Map,Current Unit 1 Specific Core Design Data & Units 1 & 2 Restart Evaluation Criteria + (09:21:38, 8 December 2024)
- ML20199J647 + (09:21:39, 8 December 2024)
- ML20199J643 + (09:21:40, 8 December 2024)
- ML20199J642 + (09:21:41, 8 December 2024)
- ML20199J640 + (09:21:42, 8 December 2024)
- ML20199J635 + (09:21:43, 8 December 2024)
- ML20199J636 + (09:21:43, 8 December 2024)