Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199L077 + (09:05:26, 8 December 2024)
- ML20199L078 + (09:05:26, 8 December 2024)
- ML20199L074 + (09:05:27, 8 December 2024)
- ML20199L076 + (09:05:27, 8 December 2024)
- ML20199L073 + (09:05:28, 8 December 2024)
- ML20199L071 + (09:05:29, 8 December 2024)
- ML20199L072 + (09:05:29, 8 December 2024)
- 05000443/LER-1998-014, Forwards LER 98-014-00 for Event That Occurred at Seabrook Station on 981222.Encl 2 Is List of Util Commitments Made in Response to LER + (09:05:30, 8 December 2024)
- ML20199L070 + (09:05:30, 8 December 2024)
- ML20199L068 + (09:05:31, 8 December 2024)
- ML20199L063 + (09:05:33, 8 December 2024)
- ML20199L065 + (09:05:33, 8 December 2024)
- ML20199L062 + (09:05:34, 8 December 2024)
- ML20199L060 + (09:05:34, 8 December 2024)
- ML20199L059 + (09:05:35, 8 December 2024)
- ML20199L058 + (09:05:36, 8 December 2024)
- RBG-44325, Notifies That Actions Associated W/Resolution of Thermo-Lag Issues at Plant Completed,Per GL 92-08.First Phase Completed by Development of Revised Safe Shutdown Analysis + (09:05:36, 8 December 2024)
- ML20199L055 + (09:05:37, 8 December 2024)
- ML20199L054 + (09:05:38, 8 December 2024)
- ML20199L052 + (09:05:38, 8 December 2024)
- ML20199L050 + (09:05:39, 8 December 2024)
- ML20199L051 + (09:05:39, 8 December 2024)
- ML20199L049 + (09:05:40, 8 December 2024)
- ML20199L046 + (09:05:41, 8 December 2024)
- ML20199L048 + (09:05:41, 8 December 2024)
- ML20199L044 + (09:05:42, 8 December 2024)
- ML20199L041 + (09:05:43, 8 December 2024)
- ML20199L043 + (09:05:43, 8 December 2024)
- ML20199L039 + (09:05:44, 8 December 2024)
- ML20199L040 + (09:05:44, 8 December 2024)
- ML20199L038 + (09:05:45, 8 December 2024)
- ML20199L037 + (09:05:45, 8 December 2024)
- ML20199L035 + (09:05:46, 8 December 2024)
- PNO-I-86-048, on 860704,unscheduled Reactor Shutdown Occurred Due to Increasing Unidentified Drywell Leakage.Caused by Packing Leak on Manual LPCI Injection Valve.Manual Valve Backseated.Startup Planned for 860711 + (09:05:47, 8 December 2024)
- PNO-I-86-049, on 860706,18-inch Piece of Blading from Low Pressure Turbine 31 Broke Off During Main Generator Startup. Turbine Vendor Evaluating Damage.Repair Expected to Take at Least 1 Wk + (09:05:50, 8 December 2024)
- B17590, Application for Amend to License DPR-65,removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys, from Plant TS + (09:05:51, 8 December 2024)
- ML20199L028 + (09:05:51, 8 December 2024)
- ML20199L026 + (09:05:52, 8 December 2024)
- A97061, Informs NRC of Rev to NOV Commitment Made in Responding to Violations Noted in Insp Repts 50-295/96-06 & 50-304/96-06.Test Requirements Are Now Assigned from post- Maint Testing Matrix During Work Planning Effort + (09:05:53, 8 December 2024)
- ML20199L024 + (09:05:54, 8 December 2024)
- 05000348/LER-1998-008-01, :on 981223,reactor Vessel Support Concrete Design Bases Temperature Exceeded Due to Closed Cooling Damper.Caused by Personnel Error.Damper Opened & Secured in Position.With + (09:05:55, 8 December 2024)
- ML20199L022 + (09:05:56, 8 December 2024)
- ML20199L021 + (09:05:57, 8 December 2024)
- ML20199L019 + (09:06:28, 8 December 2024)
- ML20199L017 + (09:06:29, 8 December 2024)
- ML20199L016 + (09:06:29, 8 December 2024)
- ML20199L015 + (09:06:30, 8 December 2024)
- ML20199L014 + (09:06:31, 8 December 2024)
- ML20199L011 + (09:06:56, 8 December 2024)
- ML20199L008 + (09:06:59, 8 December 2024)
- ML20199L007 + (09:07:00, 8 December 2024)
- ML20199L005 + (09:07:01, 8 December 2024)