Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202E315 + (08:03:42, 8 December 2024)
- ML20202E317 + (08:03:42, 8 December 2024)
- ML20202E312 + (08:03:43, 8 December 2024)
- ML20202E314 + (08:03:43, 8 December 2024)
- ML20202E310 + (08:03:45, 8 December 2024)
- ML20202E309 + (08:03:46, 8 December 2024)
- ML20202E308 + (08:03:47, 8 December 2024)
- IR 05000382/1997021 + (08:03:57, 8 December 2024)
- ML20202E305 + (08:03:57, 8 December 2024)
- 3F0298-20, Forwards Suppl to Annual 10CFR50.59 Rept That Was Provided in .Attachment a Provides Descriptions of Changes to Facility as Described in FSAR That Were Implemented Between Dec 1996 & Nov 1997.No Tests or Experiments Done + (08:04:00, 8 December 2024)
- ML20202E298 + (08:04:01, 8 December 2024)
- ML20202E297 + (08:04:03, 8 December 2024)
- 05000293/LER-1998-028, :on 981230,CR High Efficiency Air Filtration Sys Relative Humidity Switches Were Inoperable.Caused by Gradual Degradation of Nylon Filaments.Modified Sys Control Circuitry.With + (08:04:04, 8 December 2024)
- ML20202E292 + (08:04:05, 8 December 2024)
- ML20202E288 + (08:04:06, 8 December 2024)
- ML20202E284 + (08:04:07, 8 December 2024)
- ML20202E283 + (08:04:07, 8 December 2024)
- ML20202E281 + (08:04:08, 8 December 2024)
- ML20202E278 + (08:04:09, 8 December 2024)
- ML20202E274 + (08:04:10, 8 December 2024)
- ML20202E272 + (08:04:11, 8 December 2024)
- ML20202E273 + (08:04:11, 8 December 2024)
- ML20202E270 + (08:04:12, 8 December 2024)
- ML20202E269 + (08:04:13, 8 December 2024)
- 05000247/LER-1986-018, :on 860606,battery Cell Voltage Determined to Be Below Min Acceptable Value at 123.54 Volts Dc & Battery Declared Inoperable.Caused by Defective Transistor in Voltage Regulator.Transistor Replaced + (08:04:15, 8 December 2024)
- ML20202E261 + (08:04:17, 8 December 2024)
- ML20202E259 + (08:04:18, 8 December 2024)
- ML20202E258 + (08:04:18, 8 December 2024)
- ML20202E257 + (08:04:19, 8 December 2024)
- ML20202E254 + (08:04:20, 8 December 2024)
- ML20202E252 + (08:04:21, 8 December 2024)
- ML20202E250 + (08:04:21, 8 December 2024)
- ML20202E246 + (08:04:22, 8 December 2024)
- ML20202E248 + (08:04:22, 8 December 2024)
- ML20202E245 + (08:04:23, 8 December 2024)
- ML20202E243 + (08:04:25, 8 December 2024)
- ML20202E240 + (08:04:26, 8 December 2024)
- ML20202E242 + (08:04:26, 8 December 2024)
- ML20202E237 + (08:04:27, 8 December 2024)
- ML20202E232 + (08:04:28, 8 December 2024)
- ML20202E233 + (08:04:28, 8 December 2024)
- 3F0298-14, Provides Addl Info Requested in 980202 Telcon Re LAR 224. Info Requested,Involving Normal & Failure Positions of Svc Water Valves,Included in Attachment A.Rev 0 to EPIP EM-225C, Corrected Simplified Schematic & Piping Diagram Encl + (08:04:29, 8 December 2024)
- NSD-NRC-97-5458, Forwards Responses to Three FSER Open items,440.736F & 440.737F.W Status for Open Item Tracking Sys Items 6164,6165 & 6166 Will Be Changed to Action N + (08:04:29, 8 December 2024)
- ML20202E229 + (08:04:30, 8 December 2024)
- ML20202E227 + (08:04:31, 8 December 2024)
- ML20202E224 + (08:05:37, 8 December 2024)
- ML20202E223 + (08:05:38, 8 December 2024)
- ML20202E219 + (08:06:02, 8 December 2024)
- ML20202E218 + (08:06:03, 8 December 2024)
- SVP-98-376, Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize Drawings + (08:06:04, 8 December 2024)
- NSD-NRC-97-5462, Forwards Two Responses for FSER Open Item Related to nonsafety-related Containment Spray.Fser Open Items 650.11F (Oits 5973) & 480.1081F (Oits 6044) Will Be Statused as Action N + (08:06:05, 8 December 2024)
- ML20202E211 + (08:06:07, 8 December 2024)