ML20202E246
| ML20202E246 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/02/1997 |
| From: | Stetka T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20202E251 | List: |
| References | |
| 50-382-97-21, NUDOCS 9712050301 | |
| Download: ML20202E246 (5) | |
See also: IR 05000382/1997021
Text
_
~.
--
._
f * K'g
UNiitDSTATES
NUCLEAR REGULATORY COMMISSION
/,
-
..
--
R E Glo41V
/*
611 Rv AN PL AZA DRIVE, Sulf E 400
'%,
/
A R LINQiON, T E X AS 760118064
December 2,1997
Charles M. Dugger, Vice President
Operations Wateriord 3
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT 50-382/97 21 AND NOTICE OF VIOLATION
Dear Mr. Dugger.
An NRC inspection was conducted September 22 26 and October 6-10,1997, at your
Waterford Steam Electric Station, Unit 3, reactor facility. Additionalinspection was conducted
October 14 20 in the NRC Region IV office. An exit meeting was conducted by telephone on
October 20,1997. The overall conclusions of this inspection were discussed with Mr. Wrape of
your staff on December 2,1997. The enclosed report presents the scope and results of that
inspection.
The report discusses a violation involving the failure to follow procedures. The violation is of
concern because the NRC considers procedural compliance to be an essential element for
ensuring safety. This violation is cited in the enclosed Notice of Violation (Nntice) and the
circumstances surrounding the violation are described in detail in the enclosed report. Please
note that you are required to respond to this letter and should follow the instructions specified in
the enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room (PDR). To the
extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the PDR without redaction.
Should you have any questions conceming this inspection, we will be pleased to discuss them
with you.
Sincerely,
'
l
w
Thomas F. Stetka, Acting Chief
i
Engineering Branch
Division of Reactor Safety
L
Docket No.: 50-382
License No.: NPF-38
Vd* 188u Paikh
l
e
a
1
_
_
. . _ . _ _ _
_ . , . _
. _ _ _ _ _ _
j
_
--__ _ __-_ _ ___ _ _ _ _ __ _ __-__
- _ _ _ _ _ _ _ _ _ _ - _ _
.
-
.
h
Entergy Operations, Inc.
-2
l
Enclosures:
2. NRC Inspection Report
{
50-382/97 21
,
1
cc w/ enclosures:
!
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286 1995
l
- Vice President, Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jacksca, Mississippl 39286-1995
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippl 39205
[
General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
,
P.O. Box B
'
Killona, Louisiana 70066
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
,
.
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825 1697
Director, Nuclear Safety &
Regulatory Affairs
l
Waterford 3 SES
l
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
,
!
-.,,a,.
,
. . _ , . , , - - ,
.
--, ,
-
,~
, . _
-,
, , . - . . , . , , , . , , , , . . , . , . . - -
.
_ _ _ _
O
.
-
Entergy Operations, Inc.
3-
William H. Spell, Administrator
Louisiana Radiation Protection Division
L
P.O. Box 82135
Baton Rouge Louisiana 708B4-2135
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005 3502
l
--
_ _ _ _ _ _
_______ -_____________ _ - _ _ - -
-
.
. . . . . . . . . . . .
. . . .
. . . . .
.
.
'
.
l
,
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail repoit to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
>
E-Mail report to Docurnent Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
aranen Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
DRS Al 97-G-0
DOCUMENT NAME: R:\\_WAT\\WT721RP.MFP
To receive copy of document. Indicate in box:"C" = Copy wahout nnclosu'es "E" = Copy with, enclosures "N" = No copy
RIV:SRl:EB
RI:EB
RI:EB
lN
C:PRDr A. ')
AC:EB
MFRunyen/imb bnV PAGoldberg
RBywater@
PHarrelTTt
TFStetka#
11 &fw'97
11/ /97
11/1497
1121/97
1R7/97
V
OFFICIAL RECORD COIY
- _ - _ _ _ _ _ _ _ - _ _ _ _ - _
_ _ _ _
&
l
e
Entergy Operations, Inc.
4
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E Mail report to Docuinent Control Desk (DOCDESK)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator-
Resident inspector
DRS Director
DRS Deputy Director
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Caief (DRP/TSS)
DRS Al 97-G-0
!
DOCUMENT NAME: R:\\_WATTWT721RP.MFR
To receive copy of document, indicate in box: "C" = Copy withcut enclosures "E" = Copy with enclosures "N" * No copy
_
, RIV: SRI:EB
RI:EB
RI:EB
ld
C:PBD 'u, )
AC:EB
l_
MFRunyanilmb W
PAGoldberg
RBywaterW
PHarre6ITJt_
TFStetk@)
~
12'h97
k
Lis/97
11/ /97
11/1997
119497
OFFICIAL RECORD COPY
')'dCE0
}\\
-
-
--
- - - - - - -