Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202G538 + (07:34:08, 8 December 2024)
- PNO-I-97-075A, on 971209,radiography Source Disconnect at Temporary Jobsite Update Made.Initial Insp of End of Guide Wire Indicated,Male Connector Had Detached from Wire & End of Wire Frayed & Some Rust Noted + (07:34:11, 8 December 2024)
- ML20202G535 + (07:34:12, 8 December 2024)
- ML20202G532 + (07:34:13, 8 December 2024)
- 05000483/LER-1986-004, :on 860307,reactor Protection Sys Logic Actuation Occurred.Caused by Spurious Electrical Noise in Source Range Cables.Personnel Directed to Use Local Grounds for Welding Activities + (07:34:14, 8 December 2024)
- 05000250/LER-1986-024, :on 860611,intake Cooling Water Pump Declared Out of Svc for More than 24 H.Caused by Two Pieces of Wood Blocking Portion of Stationary Vanes.Wood Removed + (07:34:17, 8 December 2024)
- JPN-97-037, Comment on Final Direct Rule Changes to Paragraph (H) of 10CFR50.55a Codes & Standards. Effective Date of New Rule Should Be Delayed Until Listed Concerns Can Be Resolved & Appropriate Changes Incorporated + (07:34:18, 8 December 2024)
- ML20202G525 + (07:34:18, 8 December 2024)
- ML20202G523 + (07:34:19, 8 December 2024)
- ML20202G522 + (07:34:20, 8 December 2024)
- ML20202G519 + (07:34:20, 8 December 2024)
- 05000280/LER-1986-020, :on 860609,during Environ Qualification Insp, Limitorque Motor Valve Operator Wiring Found Questionable. Unidentifiable Wiring Introduced Through Plant Field Changes.Wiring Replaced + (07:34:22, 8 December 2024)
- ML20202G516 + (07:34:23, 8 December 2024)
- ML20202G517 + (07:34:23, 8 December 2024)
- ML20202G515 + (07:34:24, 8 December 2024)
- ST-HL-AE-1689, Forwards Description of Actions & Programs in Areas of Piping Sys & Supports,Licensing Activities,Physical Security,Training,Corrective Action Reporting & Matl Control to Aid in Preparation of Salp.Related Correspondence + (07:34:25, 8 December 2024)
- ML20202G513 + (07:34:25, 8 December 2024)
- 05000361/LER-1986-013, :on 860610,reactor Trip Occurred When Steam Generator E089 Reached 90% Trip Setpoint.Caused by Excessive Dead Band in Main Feed Pump Speed Controller at Low Flow. Dead Band Adjusted + (07:34:27, 8 December 2024)
- ML20202G510 + (07:34:28, 8 December 2024)
- ML20202G509 + (07:34:29, 8 December 2024)
- ML20202G508 + (07:34:29, 8 December 2024)
- IR 05000461/1998028 + (07:34:33, 8 December 2024)
- ML20202G506 + (07:34:34, 8 December 2024)
- 3F0298-06, Monthly Operating Rept for Jan 1998 for Crystal River,Unit 3 + (07:34:35, 8 December 2024)
- ML20202G503 + (07:34:36, 8 December 2024)
- ML20202G502 + (07:34:36, 8 December 2024)
- ML20202G499 + (07:34:37, 8 December 2024)
- ML20202G501 + (07:34:37, 8 December 2024)
- ML20202G498 + (07:34:38, 8 December 2024)
- ML20202G495 + (07:34:45, 8 December 2024)
- ML20202G494 + (07:34:46, 8 December 2024)
- ML20202G493 + (07:34:47, 8 December 2024)
- ML20202G489 + (07:34:48, 8 December 2024)
- ML20202G487 + (07:34:48, 8 December 2024)
- ML20202G486 + (07:34:49, 8 December 2024)
- ML20202G485 + (07:34:49, 8 December 2024)
- ML20202G483 + (07:34:53, 8 December 2024)
- ML20202G482 + (07:34:53, 8 December 2024)
- ML20202G480 + (07:34:54, 8 December 2024)
- ML20202G481 + (07:34:54, 8 December 2024)
- ML20202G478 + (07:34:55, 8 December 2024)
- PNO-I-97-075, on 971208,determined That While Performing Radiography at Temporary Jobsite,Radiography Source Used by Mqs Insp,Inc,Could Not Be Retracted.Inspector Dispatched to Site to Observe Recovery Efforts + (07:34:56, 8 December 2024)
- ML20202G475 + (07:34:56, 8 December 2024)
- ML20202G470 + (07:35:02, 8 December 2024)
- ML20202G469 + (07:35:02, 8 December 2024)
- ML20202G468 + (07:35:03, 8 December 2024)
- ML20202G467 + (07:35:03, 8 December 2024)
- ML20202G465 + (07:35:04, 8 December 2024)
- ML20202G464 + (07:35:04, 8 December 2024)
- ML20202G463 + (07:35:05, 8 December 2024)
- PY-CEI-NRR-2257, Forwards Changes to Emergency Plan Implementing Instructions for Perry Nuclear Power Plant.Changes Constitute Revs, Temporary Changes or Reissued Pages + (07:35:06, 8 December 2024)
- ML20202G460 + (07:35:07, 8 December 2024)