Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202H746 + (07:24:17, 8 December 2024)
- ML20202H738 + (07:24:19, 8 December 2024)
- ML20202H739 + (07:24:19, 8 December 2024)
- ML20202H734 + (07:24:20, 8 December 2024)
- ML20202H735 + (07:24:20, 8 December 2024)
- ML20202H731 + (07:24:21, 8 December 2024)
- ML20202H729 + (07:24:22, 8 December 2024)
- 05000250/LER-1986-013, :on 860312,bi-weekly Protection Surveillance T Average/Delta T Exceeded Allowable Grace Period. Caused by Failure to Sign Work Order & Data Sheets & Process Data in Timely Manner.Procedure AP 0190 Revised + (07:24:24, 8 December 2024)
- ML20202H724 + (07:24:25, 8 December 2024)
- ML20202H720 + (07:24:27, 8 December 2024)
- ML20202H718 + (07:24:27, 8 December 2024)
- ML20202H717 + (07:24:28, 8 December 2024)
- ML20202H706 + (07:24:31, 8 December 2024)
- ML20202H699 + (07:24:32, 8 December 2024)
- ML20202H695 + (07:24:33, 8 December 2024)
- ML20202H694 + (07:24:33, 8 December 2024)
- ML20202H691 + (07:24:34, 8 December 2024)
- ML20202H690 + (07:24:35, 8 December 2024)
- ML20202H687 + (07:24:37, 8 December 2024)
- ML20202H686 + (07:24:38, 8 December 2024)
- ML20202H683 + (07:24:42, 8 December 2024)
- ML20202H685 + (07:24:42, 8 December 2024)
- ML20202H682 + (07:24:43, 8 December 2024)
- B17563, Provides NRC with up-to-date Distribution Lists for NRC Correspondence to NNECO & Nusco + (07:24:44, 8 December 2024)
- ML20202H679 + (07:24:45, 8 December 2024)
- ML20202H677 + (07:24:51, 8 December 2024)
- ML20202H676 + (07:24:52, 8 December 2024)
- ML20202H674 + (07:24:53, 8 December 2024)
- ML20202H675 + (07:24:53, 8 December 2024)
- ML20202H672 + (07:24:54, 8 December 2024)
- 05000413/LER-1986-014, :on 860312,periodic Surveillance Test to Exercise Control Rods Not Performed within Required Tech Spec Interval.Caused by Inadequate Procedure.Step 12.2 of Procedure PT/1/A/4600/01 Revised + (07:24:56, 8 December 2024)
- ML20202H667 + (07:24:57, 8 December 2024)
- ML20202H669 + (07:24:57, 8 December 2024)
- ML20202H664 + (07:24:58, 8 December 2024)
- ML20202H666 + (07:24:58, 8 December 2024)
- ML20202H663 + (07:24:59, 8 December 2024)
- ML20202H661 + (07:25:00, 8 December 2024)
- ML20202H662 + (07:25:00, 8 December 2024)
- 1CAN019905, Withdraws TS Amend Request on Pressurizer Code Safety Valve as-found Tolerance.Resubmittal of Request Will Be Made,After Required Analyses Have Been Revised,In Order to Support Upcoming Refueling Outage (1R15) + (07:25:01, 8 December 2024)
- ML20202H660 + (07:25:01, 8 December 2024)
- ML20202H655 + (07:25:02, 8 December 2024)
- ML20202H653 + (07:25:03, 8 December 2024)
- ML20202H650 + (07:25:03, 8 December 2024)
- ML20202H648 + (07:25:05, 8 December 2024)
- ML20202H646 + (07:25:05, 8 December 2024)
- ML20202H642 + (07:25:06, 8 December 2024)
- ML20202H639 + (07:25:08, 8 December 2024)
- 05000412/LER-1998-001, :on 980112,failure to Perform Surveillance Testing of Ci Spring Loaded Check Valve Was Noted.Caused by Fact That Ci Spring Loaded Check Valve Was Not Uniquely identified.2CVS-93 Was Successfully Tested + (07:25:10, 8 December 2024)
- 05000277/LER-1985-019, :on 850919,RHR Pump Declared Inoperable.Caused by Low Flow in Low Head Region of Pump Performance Curve. Pump Removed from Svc & Inspected.Pump Determined to Be in Compliance W/Tech Spec Requirements + (07:25:12, 8 December 2024)
- ML20202H632 + (07:25:13, 8 December 2024)
- ML20202H631 + (07:25:14, 8 December 2024)