Forwards Insp Rept 50-461/97-25 on 971125-980122 & Notice of Violation Re Failure to Implement TSs Identified by NRC Inspectors &/Or Staff Since Jan 1996
ML20202H739
Person / Time
Site: Clinton 
Issue date: 02/13/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Walter MacFarland
ILLINOIS POWER CO.
Shared Package
ML20202H744 List:
References
50-461-97-25, NUDOCS 9802230011
Download: ML20202H739 (3)


See also: IR 05000461/1997025

Text

.

.

.

. . -

_

.

_ _ .

.

.

.

_ _ - -_ _ __ _ _____ ________ _

"

.[pra:

~

UNITED STATES

.

NUCLEAR REGULATORY COMMl!SION

8

REGION 11! .

-

y

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532 4351

' February 13, 1990'

Mr. Walter G. MacFarland IV

Chief Nuclear Officer-

Clinton Power Station

'

lilinois Power Company

Mail Code V 275

'

~

P O. Box 678

4

Clinton,IL 61727

SUBJECT:

NOT:CE OF VIOLATION AND NRC INSPECTION REPORT

I

. NO. 50-461/97025(DRP)

- Dear Mr. MacFarland:

On January _22,- 1998, the NRC completed an inspection at the Clinton Power Station. The

enclosed report presents the results of that inspection.

During the period covered by this inspection, continued improvements were noted in audits .

conducted by your quality assurance organization. We are concemed, however, about two

violations of NRC requirements that were identified. Both instances involved the failure N

operations personnel to implement Technical Specification (TS) requirements, in the fits

instance, NRC inspectors identified that, due to an overdue surveillance, operators failed to

ensure secondary containment isolation valve capability was maintained as required. - In the

second instance, NRC insoectore identified that operators failed to recognize a required entry

into TSs once all 480 Volt motors were declared inopersale. In addition, there have been at least

'

14 similar examples of the failure to implement TSs identified by NRC inspectors and/or your.

- stafi since January 1996. The multiple failures represent a weakness in opersiors' ability to -

. Implement TS requirements. -Your response to the violations should include the actions you plan

to take to resolve the identified weakness with .aperators' TS knowledge and implementation.

. Thet,e violations are cited in the enclosed Notice of Violation, and the circumstances surrounding

the violations are described in detail in the enclosed report. Please note that you are required to

respond to this letter and should follow the instruction specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to determine whether further

enforcement action is necessary to ensure compliance with regulatory requirements.

<

l

L

.

  • A**88si!!88a6

,

G

PDR

lllll!!I.111,1 llllllll

'

'

.

i

-

_ _ _ . _ _ _ _ . _ _ _

. - _ - _

- - _

W. MacFarland .

-2-

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its -

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely, .

!J nd.

rector

Division of Reactor Safety

Docket No.:. 50-461

License No.: NPF 62

Enclosures:

1.

Notice of Violation

2.-

Inspe:: tion Report

No. 50-461/97025(DRP)

.'cc w/encis:

G. Hunger, Station Manager

R. Phares, Manager, Nuclear Safety

and Performance improvement

' J. Sipek, Director- Licensing

Nathan Schloss, Economist .

Office of the Attomey General

i

G. Stramback, Regulatory Licensing

Services Project Manager

General Electric Company

Chairman, DevVitt County Board .

. State Liaison Officer

"

Chairman, Illinois Commerce Commission -

t

Distribution:

- Docket File w/encls

DRP w/encls

' SRI Clinton w/encls

PUBLIC IE 01 w/encls

Pro, lect Manager, NRR w/encls

Rlli PRR w/encls

R!ll Enf. Coordinator w/encis

CAA1 w/encls (E mail)

TSS w/encls

A. B. Beach w/encls

.DOCDESK (E-mail)

Deputy RA w/encls

DRS (2) w/encis

DOCUMENT NAME: G:\\ CLIN \\CLl97025.DRP

See Previous Concurrences

v.

w. . - .e me. e

6,e,

h, m. hu c - c.- win

.n

w e r - c.- wim .n w w r - u.

n

OFFICE '

Rlli

Rlli

,s , k

h

NAME

Korak/co

Gro

_

DATE

O2/ /96 ,

_

02/@/9k

OFFICIAL RECORD COPY

.

=

.

.

- .

..

. ..

.

. . .

.

.

_

_ _ _ _-_ - - ______ ___ ___ -_____

W. MacFarland

-2-

In accordance w;th 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

John A. Grobe, Director

Division of Reactor Safety

Docket No.:

50-461

License No:

NPF-62

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-461/97025(DRP)

cc w/encis:

W. D. Romberg, Assistant

Vice President

R. Phares, Manager, Nuclear Safety

and Performance improvement

J. Sipek, Director- Licensing

Nathan Schloss, Economist

Office of the Attomey General

G. Stramback, Regulatory Licensing

Services Project Manager

Genera' Electric Company

Chairman, DeWitt County Board

State Liaison Officer

Chairman, Illinois Commerce Comm'ssion

Distribution:

Docket File w/encls

DRP w/encls

SRI Clinton w/encls

PUSLIC id-01 w/encls

Project Manager, NRR w/encls

Rlli PRR w/encls

Rill Enf. Coordinator w/encls

CAA1 w/encls (E-mail)

TSS w/enets

A. B. Beach w/encls

DOCDESK (E-mail)

Deputy RA w/encls

,

DRS (2) w/encls

DOCUMENT NAME: G:\\ CLIN \\CLl97025.DRP

Ty melve a copy of thle docunwnt, Indicate in the hon "C" = Copy without atte-h/enci *E* = Copy with attachtenet *N* = No copy

OFFICE

Rlli -

Rlli

NAME

Kozak/co Ih

Gbe

~

DATE

02/Y98

02/ /98

OFFICIAL RECCRD COPY

,

_ _ - _ - _ - _ - - _