Forwards Insp Rept 50-344/86-07 on 860211-0317.No Violation Noted.Util Encouraged to Ensure That Review of Sys Operability Prompt & Thorough When Problems Concern Components Common to Both Trains of safety-related Sys
ML20202H718
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/01/1986
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20202H723 List:
References
NUDOCS 8604150433
Download: ML20202H718 (1)


See also: IR 05000344/1986007

Text

o

,

l

APR 011986

Docket No. 50-344

Portland General Electric Company

121 S. W. Salmon Street

Portland, Oregon 97204

Attention:

Mr. Bart D. Withers

Vice President Nuclear

Gentlemen:

Subject: NRC Inspection of .the Trojan Nuclear Plant

This refers to the inspection conducted by Mr. S. A. Richards and Mr. G. C.

Kellund of this office on February 11 - March 17, 1986 of activities

authorized by NRC License No. NPF-1, and to the discussion of our findings

held by Mr. Richards and Mr. Kellund with Mr. Orser and other members of your

staff periodically during the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

No violations of NRC requirements were identified within the scope of this

inspection. However, we would like to draw your attention to paragraph 10 of

this report which discusses your actions with regard to deficiencies you

identified with the auxiliary feedwater system flow control valves during this

reporting period. We encourage you to ensure that your review of system

operability is both prompt and thorough when identified problems bring into

question components common to both trains of a safety related system.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

J

discuss them with you.

Sincerely,

I

A. E. Chaffee, Chief

Reactor Projects Branch

Enclosure:

Inspection Report No. 50-344/86-07

cc w/ enclosure: State of Oregon (Dixon); W. S. Orser; J. W. Durham, Esq., PGE

bec w/ enclosure: Resident Inspector; Project Inspector; G. Cook;

B. Faulkenberry; J. Martin

bec w/o enclosure:

LFMB

Ke

C

3/77/86

3/27/86

g///86

f///86

hd

8604150433 860401

PDR

ADOCK 05000344

O

PDR