ML20202H642
| ML20202H642 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/22/1999 |
| From: | NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20202H647 | List: |
| References | |
| NUDOCS 9902080166 | |
| Download: ML20202H642 (3) | |
Text
-
t 9..
L Table 3.2.1 (Continued)
NOTES:
(1)
There shall be two operable or tripped trip systems for each function. A channel (a shared channel is considered one channel) may l be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance without placing the trip system in the tripped condition provided that at least one other operable channel in the same trip system is morntonng that parameter.
i (2)
Upon discovery that minimum requirements for the number of operable or operating trip systems or instrument channels are not satisfied action shall be initiated as follows:
[
(a) With one required instrument die mel inoperable in one or more trip functions, place the inoperable channel (s) or trip system in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or (b) With more than one instrument channel inoperable for one or more trip functions, immediately satisfy the requirements by
[
placmg appropnate channels or systems in the tripped condition, or (c) Place the plant under the specd required conditions usmg normal operating procedures.
f (3)
Low pressure in main steam line only need to be available ir:it.e RUN position.
(4)
All instrument channels are shared by both trip systerr.s.
(5)
May be bypassed when necessary only by closing the manual containment isolation valves during purging for containment inerting or de-inerting. Venfication of the bypass condition shall be noted in the control room log. Also, need not be operable when primary containment integrity is not requwed.
i i
Required conditions when minimum conditions for operation are not satisfied.
A.
Group 1 isolation valves closed.
B.
Reactor Power on IRM range or below and reactor in startup, refuel, or shutdown mode.
+
C.
Isolation Valves closed for: Shutdown Cooling System, and Reactor Head Cooling Line.
l D.
Comply with Condition C. above.
E.
Isolation Valves closed for: Reactor Cleanup System.
F.
HPCI steam line isolated. (See specification 3.5 for additional requirements.)
G.
RCIC steam line isolated.
i l
9902080166 990122 PDR ADOCK 05000263 P
PDR 3.2/4.2 51 Amendment No. St. 90,103 Corrected ' January 22, 1999
Notes: (cont'd).
(5)
Upon d;secc f that minimum requwements for the number of operable or W trip systems or h h a not satisfied schon shall be initiated as follows:
(a) With one required instrument channel inoperable per trip function, place the inoperable channel or trip system in the tripped condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, or (b) With more than one instrument channel per trip system inoperable, immediately satisfy the requirements by placmg appropriate channels or systems in the tripped condition, or (c) Place the plant under the specdied requwed condebons using normal operatmg procedures.
t l
(6)
A channel may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance without placing the trip. system in the tnpped condition provided that at least one other OPERABLE channel in the same trip system is monitonng that parameter.
Required Cendihons when minimum conditions for operation are not satisfied.
A.
The reactor buildmg ventilation system isolated and the standby gas treatment system operating.
l B.
Establish condshons where secondary containment is not required.
3.2/4.2 59a l
Amendment No.103 l
Corrected danuary 22, 1.999
m._._.
-m_.
6: -
s',
5 e t t
4 Table 4.2.1 Continued Minimum Test and Calibration Frequency for Core Cooling, Rod Block and Isolation Instrumentation Instrument Channel Test (3)
Calibration (3)
Sensor Check (3) 3.
Steam Line Low Pressure Once/3 months Once/3 months None
- 4. '
Reactor Low Low Water Level Once/3 months (Note 5)
Every Operatog Cycle-Transmitter.
Once/12 hours l
Once/3 Months-Trip Unit
'i CONTAINMENT ISOLATION (GROUPS 2 & 3) h 1.
Reactor Low Water Level (Note 10) 2.
Drywell High Pressure (Note 10) l HPCI (GROUP 4) ISOLATION I
1.
Steam Line High Flow Once/3 months Once/3 months None i
2.
Steam Line High Temperature Once/3 months Once/3 months None I
RCIC (GROUP 5) ISOLATION 1.
Steam Line High Flow Once/3 months Once/3 months None 2.
Steam Line High Temperature Once/3 months Once/3 months None
?
[
REACTOR BUILDING VENTILATION & STANDBY GAS TREATMENT t
1.
Reactor Low Low Water Level Once/3 nmnths (Note 5)
Every Operating Cycle - Transmitter Once/12 hours l
Once/3 months -Trip Unit l
2.
DryweII High Pressure (Note 10)
I 3.
Radiation Monitors (Plenum)
Once/3 months Once/3 months Once/ day 4.
Radiation Monitors (Refuehng Floor)
Once/3 months Once/3 months Note 4 RECIRCULATION PUMP TRIP AND ALTERNATE ROD INJECTION 1.
Reactor High Pressure Once/3 months (Note 5)
Once/ Operating Cycle-Transmitter Once/ Day Once/3 Months-Trip Unit 2.
Reactor Low Low Water Level Once/3 months (Note 5)
Once/ Operating Cycle-Transmitter Once/12 hours l
Once/3 Morths-Trip Unit SHU1 UOWN COOLING SUPPLY ISOLATION 1.
Reactor Pressure Interlock Once/3 months Once/3 Months None 3.2/4.2 62 Amendment No. 74, St. 83, Sir 403r 104 l
Corrected January 22, 1999