Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203P695 + (01:51:21, 8 December 2024)
- ML20203P696 + (01:51:21, 8 December 2024)
- ML20203P694 + (01:51:22, 8 December 2024)
- ML20203P692 + (01:51:24, 8 December 2024)
- ML20203P691 + (01:51:25, 8 December 2024)
- ML20203P690 + (01:51:26, 8 December 2024)
- ML20203P688 + (01:51:27, 8 December 2024)
- ML20203P689 + (01:51:27, 8 December 2024)
- 2CAN058601, Forwards Vols 1 & 2 of Arkansas Nuclear One Unit 2,CRDR Final Summary Rept, Documenting Activities Re Commitment to Practical Applications of Human Factors Principles + (01:51:28, 8 December 2024)
- ML20203P685 + (01:51:29, 8 December 2024)
- ML20203P683 + (01:51:31, 8 December 2024)
- ML20203P664 + (01:51:33, 8 December 2024)
- ML20203P680 + (01:51:33, 8 December 2024)
- ML20203P663 + (01:51:34, 8 December 2024)
- ML20203P662 + (01:51:35, 8 December 2024)
- ML20203P661 + (01:51:36, 8 December 2024)
- ML20203P660 + (01:51:37, 8 December 2024)
- ML20203P659 + (01:51:37, 8 December 2024)
- 05000327/LER-1986-008, :860401,monthly Channel Check for Steam Generator narrow-range Level Shutdown Instrumentation Not Properly Performed on SI-3 Logs.Caused by SI-3 Incorrectly Written for wide-range Level Instruments + (01:51:39, 8 December 2024)
- ML20203P647 + (01:51:41, 8 December 2024)
- ML20203P643 + (01:51:42, 8 December 2024)
- ML20203P640 + (01:51:43, 8 December 2024)
- 05000364/LER-1986-004-01, :on 860428 Prior to Fourth Refueling Outage, Eddy Current Insp Plan Identified 70 Steam Generator Tubes Plugged.Causes for Tube Degradation Include Antivibration Bar Wear & Stress Corrosion + (01:51:45, 8 December 2024)
- ML20203P631 + (01:51:46, 8 December 2024)
- ML20203P625 + (01:51:47, 8 December 2024)
- 05000366/LER-1986-005-01, :on 860327,while Placing Filter/Demineralizer in Svc,High Differential Flow Occurred,Causing RWCU Isolation.Cause Unknown.Investigation Will Be Performed to Determine Root Cause + (01:51:49, 8 December 2024)
- ML20203P616 + (01:51:50, 8 December 2024)
- ML20203P611 + (01:51:51, 8 December 2024)
- ML20203P609 + (01:51:52, 8 December 2024)
- ML20203P607 + (01:51:53, 8 December 2024)
- TAC:60716 + (01:51:54, 8 December 2024)
- ML20203P605 + (01:51:55, 8 December 2024)
- ML20203P604 + (01:51:56, 8 December 2024)
- ML20203P602 + (01:51:57, 8 December 2024)
- ML20203P600 + (01:51:58, 8 December 2024)
- ML20203P599 + (01:51:59, 8 December 2024)
- 05000249/LER-1986-003-08, :on 860403,power Lost to 4 Kv Emergency Bus 34-1 Resulting in Reactor Bldg Ventilation Sys Isolation. Caused by Personnel Leaving Relay Trip Check Open.Event Reviewed W/Responsible Individual + (01:52:01, 8 December 2024)
- ML20203P595 + (01:52:06, 8 December 2024)
- ML20203P597 + (01:52:06, 8 December 2024)
- ML20203P593 + (01:52:07, 8 December 2024)
- ML20203P592 + (01:52:07, 8 December 2024)
- ML20203P589 + (01:52:09, 8 December 2024)
- ML20203P591 + (01:52:09, 8 December 2024)
- ML20203P588 + (01:52:10, 8 December 2024)
- ML20203P586 + (01:52:10, 8 December 2024)
- ML20203P585 + (01:52:11, 8 December 2024)
- ML20203P583 + (01:52:11, 8 December 2024)
- ML20203P581 + (01:52:12, 8 December 2024)
- 05000237/LER-1986-009-06, :on 860401,seismic Evaluation of Control Room Panels Revealed That Panels Not Positively Mounted to Floor.Caused by Installation Discrepancy.Bolts & Tack Welds Installed on Panels + (01:52:14, 8 December 2024)
- ML20203P577 + (01:52:15, 8 December 2024)
- ML20203P575 + (01:52:16, 8 December 2024)