Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204C114 + (01:33:33, 8 December 2024)
- ML20204C108 + (01:33:34, 8 December 2024)
- ML20204C107 + (01:33:37, 8 December 2024)
- ML20204C102 + (01:33:38, 8 December 2024)
- ML20204C100 + (01:33:38, 8 December 2024)
- ML20204C096 + (01:33:39, 8 December 2024)
- ML20204C095 + (01:33:40, 8 December 2024)
- ML20204C085 + (01:33:41, 8 December 2024)
- ML20204C083 + (01:33:42, 8 December 2024)
- ML20204C079 + (01:33:43, 8 December 2024)
- ML20204C078 + (01:33:44, 8 December 2024)
- ML20204C073 + (01:33:45, 8 December 2024)
- ML20204C075 + (01:33:45, 8 December 2024)
- ML20204C071 + (01:33:47, 8 December 2024)
- ML20204C067 + (01:33:48, 8 December 2024)
- ML20204C060 + (01:33:49, 8 December 2024)
- ML20204C059 + (01:33:49, 8 December 2024)
- 05000373/LER-1987-009-01, :on 870217,while Removing Jumpers Installed Per LIS-VR-03,Group IV Isolation Occurred.Caused by Instrument Maint Procedure Inadequacy.Procedure Being Deleted & Replacement Surveillance Being Generated + (01:33:51, 8 December 2024)
- ML20204C056 + (01:33:52, 8 December 2024)
- ML20204C053 + (01:33:56, 8 December 2024)
- ML20204C052 + (01:33:58, 8 December 2024)
- ML20204C048 + (01:33:58, 8 December 2024)
- ML20204C043 + (01:33:59, 8 December 2024)
- ML20204C040 + (01:34:00, 8 December 2024)
- ML20204C041 + (01:34:00, 8 December 2024)
- ML20204C037 + (01:34:01, 8 December 2024)
- A06372, Responds to NRC Re Violations Noted in Insp Rept 50-336/86-23.Corrective Actions:Procedure MP 2720C6 for Periodic Maint on Electrical Switchgear Revised & Drawing Package Issued Re Panel C26 + (01:34:02, 8 December 2024)
- ML20204C032 + (01:34:03, 8 December 2024)
- ML20204C028 + (01:34:03, 8 December 2024)
- B12465, Forwards Addl Request for Relief from Performing Inservice Insp for First 10-yr Insp Interval,Specifically Inservice Surface Exam on Inaccessible Portions of Pressurizer Support skirt-to-shell Weld.Fee Paid + (01:34:05, 8 December 2024)
- ML20204C026 + (01:34:05, 8 December 2024)
- ML20204C022 + (01:34:06, 8 December 2024)
- ML20204C016 + (01:34:07, 8 December 2024)
- ML20204C017 + (01:34:07, 8 December 2024)
- ML20204C003 + (01:34:09, 8 December 2024)
- ML20204C002 + (01:34:10, 8 December 2024)
- ML20204C001 + (01:34:12, 8 December 2024)
- ML20204B998 + (01:34:12, 8 December 2024)
- ML20204B997 + (01:34:13, 8 December 2024)
- ML20204B993 + (01:34:14, 8 December 2024)
- ML20204B987 + (01:34:15, 8 December 2024)
- ML20204B984 + (01:34:18, 8 December 2024)
- ML20204B983 + (01:34:19, 8 December 2024)
- ML20204B982 + (01:34:20, 8 December 2024)
- ML20204B980 + (01:34:21, 8 December 2024)
- ML20204B981 + (01:34:21, 8 December 2024)
- JPN-87-014, Forwards Summary Rept in Response to IE Bulletin 84-03, Refueling Cavity Water Seal. Util Will Install Leak Detection Sys for Inner Bellows & Flow Switch in Outer Bellows Rupture Drain Line by End of Next Refueling Outage + (01:34:22, 8 December 2024)
- ML20204B975 + (01:34:23, 8 December 2024)
- ML20204B973 + (01:34:23, 8 December 2024)
- ML20204B969 + (01:34:24, 8 December 2024)
- ML20204B968 + (01:34:25, 8 December 2024)