ML20204C052
| ML20204C052 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/11/1999 |
| From: | Pickett D NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20204C058 | List: |
| References | |
| NUDOCS 9903220366 | |
| Download: ML20204C052 (35) | |
Text
..
e s pug UNITED STATES
($
j NUCLEAR REGULATORY COMMISSION R
WASHINGTON, D.C. aceeHmoi os...../
FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.102 License No. NPF-58 1.
The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the FirstEnergy Nuclear Operating Company (the licensee, formerly The Cleveland Electric illuminating Company, Centerior Service Company, Duquesne Light Company, Ohio Edison Company, OES Nuclear, Inc.,
Pennsylvania Power Company, and Toledo Edison Company) dated November 2, 1995, and as supplemented by submittal dated January 7,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements havs been satisfied.
2.
Accordingly, the licensa is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:
N 20366 990311 DR ADOCK 05000440 p
. _ - ~ -
e s
i (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.102 are hereby incorporated into this license. The FirstEnergy Nuclear Operating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented not later than 90 da' after issuance.
FOR THE NUCLEAR REGULATORY COMMISSION eM m _ _ 0_.--
v Douglas V. Pickett, Senior Project Manager Project Directorate ill-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date ofissuance: mrch 11,1999 l
.=.
ATTACHMENT TO LICENSE AMENDMENT NO.102 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
l l
Remove Insert 3.3-52 3.3-52 i
3.3-55 3.3-55 i
3.'s-56 3.3-56 3.3-73 3.3-73 3.6-13 3.6-13 1
3.6-14 3.6-14 3.6-29 3.6-29 3.6-30 3.6 30 3.6-31 3.6-31 3.6 32 3.6-32 3.6-34 3.6-34 3.6-35 3.6-35 3.6-51 3.6-51 3.6-52 3.6-52 3.6-53 3.6-63 3.6-55 3.6-55 3.6-56 3.6-56 3.6-57 3.6-57 3.7-4 3.7-4 3.7-5 3.7-5 3.7-6 3.7-6 3.7-8 3.7-8 3.7-9 3.7-9 3.7-10 3.7-10 3.7-15 3.7-15 3.7-16 3.7-16 3.8-17 3.8-17 3.8-18 3.8-18 3.8-19 3.8-19 3.8-28 3.8-28 3.8-29 3.8-29 3.8-38 3.8-38 N
_. ~. _ _. _... _ _ _ _... _. _. _. _. _ _. _. _ _.. _
d Primary Containment and Drywell 1 solation Instrumentation 3.3.6.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME K.
As required by K.1 Isolate the affected Immediately l
Recuired Action C.1 penetration flow anc referenced in path (s).
Table 3.3.6.1-1.
D8 K.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in the primary containment.
8!!D K.2.2 Initiate action to Immediately
)
sus)end operations wit 1 a potential for draining the reactor vessel.
l l
L.
As required by L.1 Initiate actions to Immediately Recuired Action C.1 sus)end operations anc referenced in wit 1 a potential for Table 3.3.6.1-1.
draining the reactor vessel.
i
\\
PERRY - UNIT 1 3.3-52 Amendmert No.102 i
i l
4 I
x r
3.,
_ _ - _ _ _ _ _. _. _ _. _. _ _ _. - ~ _ _ _
e i
Primary Containment and Drywell Isolation Instrumentation 3.3.6.1 l
Table 3.3.6.1 1 psge 2 of 6)
Primary Contaltunent and Drywel(l Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FR(pl SPECIFIED PER TRf*
REQUIRED SURVE!LLANCE ALLOWABLE FUNCTION CONDITIONS SYSTt g ACTION C.1 P!GUIREMENTS VALUE
[
l 2.
Primary Conteirunent and Drywell Isolation I
IDI a.
Reactor vessel Water (c)-
2 L
st 3.3.6.1.1 a 127.6 inches Level-Low Low, Level 2 st 3.3.6.1.2 i
(continued)
st 3.3.6.1.4 sR 3.3.6.1.5 b.
Drywell Pressure - Nigh 1,2,3 2(b)
N sa 3.3.6.1.1 s 1.88 psig l
st 3.3.6.1.2 st 3.3.6.1.3 l
sa 3.3.6.1.4 i
IDI c.
Reactor vessel Water 1,2,3 2
F st 3.3.6.1.1 a 14.3 inches Level - Low Low Low, sa 3.3.6.1.2 Level 1 (ECCS 54 3.3.6.1.3 Divisions 1 and 2)
st 3.3.6.1.5 j
IDI (c) 2 L
st 3.3.6.1.1 a 14.3 inches sa 3.3.6.1.2 SR 3.3.6.1.3 sa 3.3.6.1.4 sa 3.3.6.1.5
^d.
Drywell Pressure-High 1,2,3 2
F sa 3.3.6.1.1 s 1.88 pels (ECCS Divisions 1 SR 3.3.6.1.2 and 2) sa 3.3.6.1.3 sR 3.3.6.1.4 SR 3.3.6.1.5 e.
Reactor Vessel Water 1,2,3 4
F SR 3.3.6.1.1 a 127.6 inches Level - Low Low, Levet st 3.3.6.1.2 2 (HPCs)
SR 3.3.6.1.3 sa 3.3.6.1.4 l
SR 3.3.6.1.5 (c) 4 L
sa 3.3.6.1.1 2 127.6 inches st 3.3.6.1.2 i
SR 3.3.6.1.3 SR 3.3.6.1.4 En 3.3.6.1.5 f.
Drywell Pressure-High 1,2,3 4
F st 3.3.6.1.1 s 1.88 psig (HPCs) sa 3.3.6.1.2 sa 3.3.6.1.3 SR 3.3.6.1.4 st 3.3.6.1.5
- s. Containment and Drywet1 1,2,3 2(b)
F st 3.3.6.1.1 s 4.0 na/hr I
Purse Exhaust Plenun st 3.3.6.1.2 above RadIstion - High sa 3.3.6.1.4 background SR 3.3.6.1.5 (continued)
(b) Required to initiate the drywell isolation fisction.
(c) During operaticns with a potential for drainirO the reactor vessel.
PERRY - LNIT 1 3.3 55 Aiudeit No.102
Primary Containment and Drywell 1 solation Instrumentation 3.3.6.1 Table 3.3.6.1 1 (page 3 of 6)
Primary Containment and Drywell Isolation Instrumentation l
I APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED 1'
OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVE!LLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE 2.
Primary Contalrusent and Drywell Isolation
- s. Containment and (d) 2 K
SR 3.3.6.1.1 s 4.0 mR/hr above Drywell Purge Exhaust st 3.3.6.1.2 background t
Plenun SR 3.3.6.1.4 Radiation - High SR 3.3.6.1.5 i
(continued) h.
Manuel Initiation 1,2,3 2
G st 3.3.6.1.5 NA (d) 2 K
st 3.3.6.1.5 NA
[
3.
Reactor Core Isolation Coolins (RCIC) system Isolation a.
RCIC Steam Line 1,2,3 1
F st 3.3.6.1.1 s 298.5 inches Flow - High SR 3.3.6.1.2 water SR 3.3.6.1.3 sa 3.3.6.1.4 i
SR 3.3.6.1.5 b.
RCIC Steam Line Flow 1,2,3 1
F sa 3.3.6.1.2 a 3 seconds and 1
Time Delay st 3.3.6.1.4 s 13 seconds sa 3.3.6.1.5 c.
RCIC steam supply Line 1,2,3 1
F st 3.3.6.1.1 a 55 psis Pressure - Low st 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.4 SR 3.3.6.1.5
(
d.
RCIC Turbine Exhaust 1,2,3 2
F st 3.3.6.1.1 s 20 psis Diaphragm st 3.3.6.1.2 Pressure - High SR 3.3.6.1.3 st 3.3.6.1.4 sa 3.3.6.1.5 e.
RCIC Equipment Area 1,2,3 1
F st 3.3.6.1.1 s 145.9*F Aseient SR 3.3.6.1.4 Temperature - High st 3.3.6.1.5 st 3.3.6.1.7 f.
Main steam Line Pipe 1,2,3 1
F st 3.3.6.1.1 s 158.9'F Tunnel SR 3.3.6.1.4 i
Tenperature - High SR 3.3.6.1.5 SR 3.3.6.1.7 (continued)
(b) Required to initiate the drywell isolation function.
-(d) During operations with a potential for dralning the reactor vessel, and movement of recently irradiated fuel assemblies in primary containment.
PENN - LNIT 1 3.3 56
- 00ENT ND.102
a v
CRER System Instrumentation 3.3.7.1 Table 3.3.71 1 (pege 1 of 1)
Control Room Emergency Recirculation system Instrianentation APPLICABLE CONDIT10Ns MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDIT!0ps SYSTEM ACTION A.1 REQUIREMENTS VALUE 1.
Reactor vessel Water 1,2,3, 2
8 SR 3.3.7.1.1 a 14.3 inches Level - Low Low Low, (a)
SR 3.3.7.1.2 Level 1 SR 3.3.7.1.3 st 3.3.7.1.4 SR 3.3.7.1.5 2.
Drywell Pressure-High 1,2,3 2
B st 3.3.7.1.1 s 1.88 psig SR 3.3.7.1.2 st 3.3.7.1.3 st 3.3.7.1.4 st 3.3.7.1.5 3.
Control Room 1,2 3, 1
C st 3.3.7.1.1 s 800 cpm Ventilation Radiation (6)
SR 3.3.7.1.2 Monitor SR 3.3.7.1.4 SR 3.3.7.1.5 (a) During operations with a potential for draining the reactor vessel.
(b) During operations with a potential for draining the reactor vessel, and movement of recently irradiated fuel assemblies in the primary containment or fuel handling building.
l PERRY - LNIT 1 3.3 73 leian=4 No.102
PCIVs 3.6.1.3 l
ETIWS 1
l CONDITION REQUIRED ACTION COMPLETION TIME l
l D.
(continued)
D.3 Perform SR 3.6.1.3.6 Once per 92 days for the resilient seal purge valves closed to comply with Required Action D.1.
E.
Required Action and E.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A.
AM B. C. or D not met in MODE 1. 2. or 3.
E.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F.
Required Action and F.1 Suspend movement of Immediately
' associated Completion recently irradiated l
Time of Condition A.
fuel assemblies in B, C, or D not met primary containment.
for PCIV(s) required to be OPERABLE during movement of recently l
irradiated fuel assemblies in the primary containment.
(continued) 4 i
i i
19RY - WIT 1 3.6 13 Amensent No.102
F PCIVs 3.6.1.3 KTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME G.
Required Action and G.1 Initiate action to Immediately associated Completion suspend OPDRVs.
Time of Condition A.
B. C. or D not met for PCIV(s) required i
to be OPERABLE during' G.2 Initiate action to Immediately i
MODE 4 or 5 or during restore valve (s) to operations with a OPERABLE status.
potential for drainin the reactor vessel DPDRVs).
l PERRY LNIT 1 3.6 14 Aiunuit No.102
Primary Containment-Shutdown 3.6.1.10 4
3.6 CONTAINMENT SYSTEMS 3.6.1.10 Primary Containment-Shutdown l
l LC0 3.6.1.10 Primary containment shall be OPERABLE.
l APPLICABILITY:
During movement of recently irradiated fuel assemblies in the primary containment.
During operations with a potential for draining the reactor vessel (0PDRVs)
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Primary containment A.1 Suspend movement of Immediately inoperable, recently irradiated l
fuel assemblies in the primary containment.
b.UD A.2 Initiate action to Immediately l
suspend OPDRVs.
PERRY - [ NIT 1 3.6 29
/wasait No.102
Primary Containment-Shutdown l
3.6.1.10 SURVEILLANCF REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.10.1
NOTES------------------
1.
Not required to be met for 3athways l
capable of being closed by OPERABLE primary containment automatic 1 solation valves.
l 2.
Not required to be met for the Fire Protection System manual hose reel l
containment isolation valves.
3.
Not required to be met for manual l
isolation valves open under i
administrative controls.
l l
Verify each ]enetration flow path.
31 days required to )e closed during accident conditions, is closed.
l 1
l l
l l
l PERRY LNIT 1 3.6 30
/=dait No.102 l
l
Containment Vacuum Breakers 3.6.1.11 l
3.6 CONTAINMENT SYSTEMS j
?.6.1.11 Containment Vacuum Breakers 1
LC0 3.6.1.11 Three containment vacuum breakers shall be OPERABLE and four containment vacuum breakers shall be closed.
APPLICABILITY:
MODES 1. 2. and 3.
During movement of recently irradiated fuel assemblies in the primary containment.
During operations with a potential for draining the reactor vessel (0PORVs).
ACTIONS
..___..........__.....__...__.N0TE--------------------------------------------
Enter applicable Conditions and Required Actions of LC0 3.6.1.1.
" Primary Containment-4%)erating" when the containment vacuum relief subsystem leakage results in exceeding overall containment leakage acceptance criteria.
CONDITION REQUIRED ACTION COMPLETION TIME A.
NOTE---------
A.1 Close the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Separate Condition motor operated entry is allowed for isolation valve.
each containment vacuum breaker.
6HD A.2 Restore containment 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> One or two containment vacuum breaker to vacuum breakers not OPERABLE status, closed.
DE One required containment vacuum breaker inoperable for other reasons.
(continued)
PERRY - LNIT 1 3.6-31 Anendent !b.102
~_.....
Containment Vacuum Breakers 3.6.1.11 ETIO6 (catirued)
CONDITION REQUIRED ACTION COMPLETION TIME i
t B.
Required Action and
NOTE-------------
associated Completion Only applicable in MODE 1. 2 Time of Condition A or 3.
I not met.
B.1.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Three or more E
containment vacuum breakers not closed.
B.1.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> M
Two or more required
NOTE------------
containment vacuum Only applicable during breakers inoperable movement of recently l
for other reasons.
irradiated fuel assemblies in the primary containment. and l
B.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in the primary containment.
M B.2.2 Initiate action to Immediately suspend OPDRVs.
1 1
i PERRY LNIT 1 3.6 32 Amensent No.102 i
)
Containment Humidity Control 3.6.1.12 3:6 CONTAINMENT SYSTEMS 3.6.1.12 Containment Humidity Control LC0 3.6.1.12 Containment average temperature-to-relative humidity shall be maintained within limits.
APPLICABILITY:
H0 DES 1. 2. and 3.
During movement of recently irradiated fuel assemblies in the primary containment.
During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Requirements of LC0 A.1 Restore containment 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> not met in MODE 1, 2.
average temperature-or 3.
to-relative humidity to within limits.
(continued) i PERY - l NIT 1 3.6-34 Amensent No.102
Containment Humidity Control 3.6.1.12 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B.
Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A ANQ not met or in MODE 1.
2 or 3.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.
Required Action and C.1 Suspend movement of Immediately associated Completion recently irradiated l
Time of Condition A fuel assemblies in not met during the primary movement of recently containment.
l irradiated fuel assemblies in the AND primary containment, or during OPDRVs.
C.2 Initiate action to Immediately l
suspend OPDRVs.
SURVEILL ANCF RF0lllREMENT SURVEILLANCE FRE0VENCY SR 3.6.1.12.1 Verify containment average temaerature-24 hours to-relative humidity to be witlin limits, i
i l
PERRY LNIT 1 3,6 35 Amensent No. 102 i
Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment i
LC0 3.6.4.1 The secondary containment shall be OPERABLE.
APPLICABILITY:
MODES 1. 2 and 3.
During movement of recently irradiated fuel assemblies in the i
During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1.
containment to
- 2. or 3.
OPERABLE status.
i B.
Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND not met.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
PERRY - l NIT 1 3.6 51 Amendnent No.102
. _. _. _ ~ _ > _
l Secondary Containment 3.6.4.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
Secondary C.1 Suspend movement of Immediately l
containment recently irradiated inoperable during fuel assemblies in movement of recently the primary irradiated fuel containment.
assemblies in the i
primary containment, A_ND N
or during OPDRVs.
Immediately C.2 Initiate action to suspend OPDRVs.
SURVEILtANCE RF0lllRFMENTS j
SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify secondary containment vacuum is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 0.66 inch of vacuum water gauge.
I SR 3.6.4.1.2 Verify the primary containment equipment 31 days hatch is closed 2.nd sealed and the shield i
blocks are installed adjacent to the i
l SR 3.6.4.1.3 Verify each secondary containment access 31 days door is closed, except when the access opening is being used for entry and exit.
PERRY LNIT 1 3.6 52 A=umit No.102
_ _.. ~ -
SCIVs 3.6.4.2 i
t 3.6 CONTAINMENT SYSTEKS 3.6.4.2 Secondary Containment Isolation Valves (SCIVs)
LC0 3.6.4.2 Each SCIV shall be OPERABLE.
APPLICABILITY:
MODES 1. 2. and 3.
During movenent of recently irradiated fuel assemblies in the primary containment.
During operaticns with a potential for draining the reactor vessel (0PDRVs).
ACTIONS
....__.....................____...... NOTES------------------------------------
1.
Penetration flow paths may be unisolated intermittently under administrative l
controls.
2.
Separate Condition entry is allowed for each penetration flow path.
3.
Enter applicable Conditions and Required Actions for systems made inoperable by SCI l
CONDITION REQUIRED ACTION COMPLETION TIME I
l A.
One or more A.1 Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> penetration flow paths penetration flow path
^
with one SCIV by use of at least inoperable.
one closed manual valve or blind flange.
MD (continued) i 4.
i PERRY - l NIT 1 3.6 53 Amendnent No. 102
SCIVs 3.6.4.2 l
ACTIONS (continued) i CONDITION REQUIRED ACTION COMPLETION TIME D.1 Suspend movement of Immediately D.
Requtred Action and recently irradiated l
associated Completion fuel assemblies in Time of Condition A the primary or B not met during containment.
I movement of recently I
i irradiated fuel AND i
assemblies in the primary containment.
D.2 Initiate action to Immediately l
or during OPDRVs.
suspend OPDRVs.
SURVFIll ANCF REOUIREMENTS SURVEILLANCE FREQUENCY i
NOTES------------------
1.
Valves and blind flanges in high radiation areas may be verified by use of administrative means.
2.
Not required to be met for SCIVs that are open under administrative controls.
Verify each secondary containment 31 days isolation manual valve and blind flange that is required to be closed during accident conditions is closed.
PORY - LNIT 1 3.6 55 kmd=it No.102
o AEGT System 3.6.4.3 3.6 CONTAINMENT SYSTEMS 3.6.4.3 Annulus Exhaust Gas Treatment (AEGT) System i
LC0 3.6.4.3 Two AEGT subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2. and 3.
During movement of recently irradiated fuel assemblies in the primary containment.
During operations with a potential for draining the reactor vessel (0PDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One AEGT subsystem A.1 Restore AEGT 7 days inoperable.
subsystem to OPERABLE status.
B.
Required Action and 8.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AliQ not met in MODE 1, 2.
or 3.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C.
Required Action and C.1 Place OPERABLE AEGT Immediately associated Completion subsystem in Time of Condition A operation, not met during movement of recently 08 l
irradiated fuel assemblies in the primary containment, or during OPDRVs.
j (continued) i l
PEEf LNIT 1 3.656 Amensient No.102
i AEGT S stem 3.6.4.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME l
C.
(continued)
C.2.1 Suspend movement of Immediately recently irradiated l
fuel assemblies in the primary containment, j
l C.2.2 Initiate action to Immediately l
suspend OPDRVs.
l D.
Two AEGT subsystems D.1 Enter LC0 3.0.3.
Immediately inoperable in MODE 1.
- 2. or 3.
E.
Two AEGT subsystems E.1 Suspend movement of Immediately inoperable during recently irradiated movement of recently fuel assemblies in irradiated fuel the primary I
assemblies in the containment.
or during OPDRVs.
AR E.2 Initiate action to Immediately suspend OPDRVs.
l I
i l
PERRY - lNIT 1 3.6 57
/,edmit No.102
CRER System 3.7.3 3.7 PLANT SYSTEM 3.7.3 Control Room Emergency Recirculation (CRER) System 3
LC0 3.7.3 Two CRER subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1. 2. and 3.
During movement of recently irradiated fuel assemblies in the primary containment or fuel handling building.
During operations with a potential for draining the reactor vessel (0PDRVs).
i i
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One CRER subsystem A.1 Restore CRER 7 days inoperable.
subsystem to OPERABLE status.
B.
Required Action and B.1 Be in MODE 3.
~12 ho'urs associated Completion Time of Condition A AND not met in MODE 1, 2.
or 3.
B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued) i c
t PERRY - UNii 1 3.7-4 Aiudiest No.102 f
CRER System 3.7.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
Required Action and
NOTE-------------
associated Completion LC0 3.0.3 is not applicable.
Time of Condition A not met during i
movement of recently C.1-Place OiERABLE CRER Immediately I
irradiated fuel subsyrtem in assemblies in the emergency primary containment or recirculation mode, fuel handling building, or during 2
I OPDRVs.
C.2.1 Suspend movement of Immediately recently irradiated l
fuel assemblies in the primary containment and fuel handling building.
b.ND C.2.2 Initiate action to Immediately l
suspend OPDRVs.
D.
Two CRER subsystems D.1 Enter LC0 3.0.3.
Immediately inoperable in MODE 1, 2, or 3.
j (continued)
PERRY - LNIT 1 3.7-5 Mentent No.102
CRERSgstem ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E.
Two CRER subsystems E.1 Suspend movement of Immediately inoperable during recently irradiated movement of recently fuel assemblies in irradiated fuel the primary assemblies in the containment and fuel primary containment or handling building.
fuel handling building.or during MQ OPDRVs.
E.2 Initiate action to Immediately suspend OPDRVs.
SURVEIll ANCF RF0llIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Operate each CRER subsystem for 31 days a 10 continuous hours with the heaters operating.
l SR 3.7.3.2 Perform required CRER filter testing in In accordance i
accordance with the Ventilation Filter with the VFTP Testing Program (VFTP).
l SR 3.7.3.3 Verify each CRER subsystem actuates on an 18 months actual or simulated initiation signal.
l (continued) l l
l l
PERRY - LNIT 1 3.7-6 Mendient No.102 i
l
Control Room HVAC System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Control Room Heating, Ventilating, and Air Conditioning (HVAC) System LC0 3.7.4 Two control room HVAC subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and 3, During movement of recently irradiated fuel assemblies in the primary containment or fuel handling building, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One control room HVAC A.1 Restore control room 30 days subsystem inoperable.
HVAC subsystem to OPERABLE status.
B.
Two control room HVAC B.1 Verify control room Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> subsystems inoperable.
air temperature is s 90*F.
M B.2 Restore one control 7 days room HVAC subsystem to OPERABLE status.
C.
Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A or M B not met in MODE 1, 2, or 3.
C.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
PERRY - LNIT 1 3.7-8 Ae ded. No.102 1
Control Room HVAC System 3.7.4 l
ETIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D.
Required Action and
NOTE-------------
associated Completion LC0 3.0.3 is not applicable.
Time of Condition A not met during movement of recently D.1 Place OPERABLE Immediately l
irradiated fuel control room HVAC assemblies in the subsystem in primary containment or operation.
fuel handling building.or during QR OPDRVs.
D.2.1 Suspend movement of Immediately recently irradiated fuel assemblies in the primary containment and fuel handling building.
l MQ D.2.2 Initiate action to Immediately l
suspend OPDRVs.
(continued) i i
l
\\
i r
)
PERRY - lEIT 1 3.7-9 Mentent No.102
l I
Control Room HVAC System l
3.7.4 l
i
/CTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME i
E.
Required Action and
NOTE-------------
L associated Completion LC0 3.0.3 is not applicable.
l Time of Condition B I
not met during j
movement of recently E.1 Suspend movement of Immediately I
irradiated fuel recently irradiated I
assemblies in the fuel assemblies in primary containment or the primary fuel handling containment and fuel building, or during handling building.
l OPDRVs.
bND E.2 Initiate action to Immediately suspend OPDRVs.
SURVEILLANCE REQUIRFMFNTS SURVEILLANCE FRE0UENCY SR 3.7.4.1 Verify each control room HVAC subsystem has 18 months the capability to remove the assumed heat load.
4 PERRY - LNIT 1 3.7-10 Amentent No.102 w
i Fuel Handling Building 3.7.8 I
3.7 PLANT SYSTEMS 3.7.8 Fuel Handling Building LC0 3.7.8 The fuel handling building (FHB) shall be OPERABLE.
APPLICABILITY:
During movement of recently irradiated fuel assemblies in the FHB.
ACTIONS
__......__.....__...............---NOTE-------------------------------------
LC0 3.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
FHB inoperable.
A.1 Suspend movement of Immediately recently irradiated fuel assemblies in the FHB.
SURVElllANCF RF0llIREMENTS j
SURVEILLANCE FREQUENCY SR 3.7.8.1 Verify all FHB floor hatches and the shield 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> blocks adjacent to the shield building are installed, and the FHB railroad track door is closed.
SR 3.7.8.2 Verify each FHB access door is closed.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> except when the access opening is being used for entry and exit PERRY UNIT 1 3.7-15 Aiudwi. No.102 l
f
,n-,-
Fuel Handling Building Ventilation Exhaust System 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Fuel Handling Building Ventilation Exhaust System LC0 3.7.9 Three fuel handling building (FHB) ventilation exhaust subsystems shall be OPERABLE.
APPLICABILITY:
During movement of recently irradiated fuel assemblies in l
the FHB.
ACTIONS
__.....______________....__....__... NOTE-------------------------------------
LCO 3.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One required FHB A.1 Restore FHB 7 days ventilation exhaust ventilation exhaust subsystem inoperable.
subsystem to OPERABLE status.
B.
Required Action and B.1 Place two OPERABLE Immediately associated Completion FHB ventilation Time of Condition A exhaust subsystems in not met.
operation.
08 B.2 Suspend movement of Immediately recently irradiated l
fuel assemblies in the FHB.
C.
Two or three FHB C.1 Suspend movement of Immediately ventilation exhaust recently irradiated subsystems inoperable, fuel assemblies in the FHB.
l l
(continued) l PERRY - UNIT 1 3.7-16 Aedelt No.102 l
l
AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LC0 3.8.2 The following AC electrical power sources shall be OPERABLE:
a.
One qualified circuit between the offsite transmission i
network and the onsite Class 1E AC e'lectrical power l
distribution subsystem (s) required by LC0 3.8.8 t
" Distribution Systems-Shutdown":
i b.
One diesel generator (DG) capable of su) plying one division of the Division 1 or 2 onsite Class 1E AC electrical power distribution subsystem (s) required by LCO 3.8.8: and 1
c.
One qualified circuit, other than the circuit in LC0 3.8.2.a. between the offsite transmission network and the Division 3 onsite Class 1E electrical power distribution subsystem, or the Division 3 DG capable of supplying the Division 3 onsite Class 1E AC electrical
)ower distribution subsystem, when the Division 3 onsite Class 1E electrical power distribution subsystem is
)
required by LC0 3.8.8.
APPLICABILITY:
MODES 4 and 5.
During movement of recently irradiated fuel assemblies in l
the primary containment or fuel handling building.
i i
PERRY - LNIT 1 3.8-17 Aienuit No.102
AC Sources--Shutdown 3.8.2 ACTIONS
...._______.._____________.._______.N0TE-------------------------------------
LCO 3.0.3 is not applicable.
CONDITION REQUIRED ACTION COMPLETION TIME
___........-NOTE-------------
A.
LC0 Item a not met.
Enter applicable Condition and Required Actions of LC0 3.8.8. when any required division is de-energized as a l
result of Condition A.
i A.1 Declare required Immediately i
feature (s) with no i
offsite power available from a required circuit inoperable.
QB A.2.1 Sus)end CORE Immediately ALT ERATIONS.
I bE A.2.2 Suspend movement of Immediately recently irradiated l
fuel assemblies in i
t:1e primary containment and fuel handling building.
b@
A.2.3 Initiate action to Immediately i
sus)end operations wit 1 a potential for draining the reactor vessel (OPDRVs).
6ND (continued) i PERRY'- (NIT 1 3.8-18 Amentent No.102
n-AC Sources--Shutdown 3.8.2 j
l ETIO6 CONDITION REQUIRED ACTION COMPLETION TIME l
A.
(Continu'ed)
A.2.4 Initiate action to Immediately restore required offsite )ower circuit to OPERA3LE status.
B.
LCO Item b not met.
B.1 Sus 3end CORE Immediately ALTERATIONS.
AND B.2 Suspend movement of Immediately recently irradiated l
fuel assemblies in primary containment and fuel handling building.
AND Immediately B.3 Initiate action to suspend OPDRVs.
AND Immediately B.4 Initiate action to restore required DG to OPERABLE status.
C.
LCO Item c not met.
C.1 Declare High Pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> GoreSpraySystem inoperable.
I I
PERRY - LNIT 1 3.8-19 Audelt No.102
DC Sources-Shutdown 3.8.5 f
3.8-ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources-Shutdown LC0 3.8.5 The following DC electrical power subsystems shall be OPERABLE:
{
a.
One Class 1E DC electrical power subsystem capable of supplying one division of the Division 1 or 2 onsite Class 1E electrical power distribution subsystem (s) required b Shutdown":y LCO 3.8.8. " Distribution Systems -
l b.
One Class 1E battery or battery charger, other than the DC electrical power subsystem in LC0 3.8.5.a. capable of i
supplying the remaining Division 1 or Division 2 onsite Class 1E DC electrical power distribution subsystem when I
required by LC0 3.8.8: and c.
The Division 3 DC electrical power subsystem capable of supplying the Division 3 onsite Class 1E DC electrical
>ower distribution subsystem, when the Division 3 onsite Class 1E DC electrical power distribution subsystem is required by LC0 3.8.8.
APPLICABILITY:
MODES 4 and 5.
During movement of recently irradiated fuel assemblies in l
the primary containment or fuel handling building.
PERRY - UNIT 1 3.8-28 Amendment No.102
O e
DC Sources-Shutdown i
3.8.5 ACTIONS
............................____.....-NOTE-----------------------------------
LC0 3.0.3 is not applicable.
I CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Declare affected Immediately DC electrical power required feature (s) subsystems inoperable.
OB A.2.1 Sus)end CORE Immediately ALT ERATIONS.
MD A.2.2 Suspend movement of Immediately recently irradiated l
fuel assemblies in i
the primary containment and fuel handling building.
S l
A.2.3 Initiate action to Immediately I
sus)end operations wit 1 a potential for draining the reactor vessel.
\\
A.2.4 Initiate action to Immediately restore required DC electrical power subsystems to OPERABLE status.
PERRY - UNIT 1 3.8-29 Amendment No.lo2
Distribution Systems-Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 Distribution Systems-Shutdown f
i LCO 3.8.8 The necessary portions of the Division 1. Division 2 and Division 3 AC and DC electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.
APPLICABILITY:
MODES 4 and 5.
During movement of recently irradiated fuel assemblies in l
)
the primary containment or fuel handling building.
l l
ACTIONS l
Lbb'b$b$b'I$~not$ppiIc$bie['
~
~~
CONDITION REQUIRED ACTION COMPLETION TIME l
)
l A.
One or more required A.1 Declare associated Immediately AC or DC electrical supported required power distribution feature (s) subsystems inoperable.
OR A.2.1 Sus 3end CORE Immediately ALT ERATIONS.
blW A.2.2 Suspend movement of Immediately l
recently irradiated l
fuel assemblies in the primary containment and fuel handling building.
i AND I
(continued) n l
PERRY - LNIT 1 3.8-38 Alened. No.102
.