Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204C172 + (01:33:10, 8 December 2024)
- ML20204C169 + (01:33:11, 8 December 2024)
- ML20204C170 + (01:33:11, 8 December 2024)
- ML20204C167 + (01:33:12, 8 December 2024)
- ML20204C165 + (01:33:12, 8 December 2024)
- ML20204C158 + (01:33:13, 8 December 2024)
- ML20204C153 + (01:33:14, 8 December 2024)
- ML20204C156 + (01:33:14, 8 December 2024)
- ML20204C151 + (01:33:15, 8 December 2024)
- ML20204C148 + (01:33:16, 8 December 2024)
- ML20204C145 + (01:33:17, 8 December 2024)
- 05000323/LER-1986-027, :on 861213,time Limit of Tech Spec 4.11.2.1.2, Table 4.11-2,Item 4 (Continuous Particulate Sample),Exceeded for Plant Vent Particulate Sample.Caused by Personnel Error. Personnel Counseled & Tailboard Meeting Held + (01:33:19, 8 December 2024)
- 05000440/LER-1987-008, :on 870218,div 1,class 1E 125 Volt Dc Battery Failed to Meet Allowable Electrolyte Temp of 72 F.Caused by Personnel Error & Faulty Thermostat.Procedure Reviewed & Thermostat Replaced + (01:33:23, 8 December 2024)
- ML20204C138 + (01:33:24, 8 December 2024)
- ML20204C132 + (01:33:25, 8 December 2024)
- ML20204C130 + (01:33:26, 8 December 2024)
- 05000263/LER-1987-006, :on 870216,reactor Scram Occurred.Caused by Two Electrical Disturbances Propagating Through Div 1 Sys Due to Failure of Output Feedback Control Transformer.Power Supplies & Instrumentation Examined + (01:33:28, 8 December 2024)
- ML20204C123 + (01:33:32, 8 December 2024)
- B12473, Submits Addl Info in Support of 870206 Application for Amend to License DPR-65,revising Tech Specs Re Operability of CRD Mechanisms.High Power Reactor Trip Required Only Under Listed Conditions + (01:33:33, 8 December 2024)
- ML20204C114 + (01:33:33, 8 December 2024)
- ML20204C108 + (01:33:34, 8 December 2024)
- ML20204C107 + (01:33:37, 8 December 2024)
- ML20204C102 + (01:33:38, 8 December 2024)
- ML20204C100 + (01:33:38, 8 December 2024)
- ML20204C096 + (01:33:39, 8 December 2024)
- ML20204C095 + (01:33:40, 8 December 2024)
- ML20204C085 + (01:33:41, 8 December 2024)
- ML20204C083 + (01:33:42, 8 December 2024)
- ML20204C079 + (01:33:43, 8 December 2024)
- ML20204C078 + (01:33:44, 8 December 2024)
- ML20204C073 + (01:33:45, 8 December 2024)
- ML20204C075 + (01:33:45, 8 December 2024)
- ML20204C071 + (01:33:47, 8 December 2024)
- ML20204C067 + (01:33:48, 8 December 2024)
- ML20204C060 + (01:33:49, 8 December 2024)
- ML20204C059 + (01:33:49, 8 December 2024)
- 05000373/LER-1987-009-01, :on 870217,while Removing Jumpers Installed Per LIS-VR-03,Group IV Isolation Occurred.Caused by Instrument Maint Procedure Inadequacy.Procedure Being Deleted & Replacement Surveillance Being Generated + (01:33:51, 8 December 2024)
- ML20204C056 + (01:33:52, 8 December 2024)
- ML20204C053 + (01:33:56, 8 December 2024)
- ML20204C052 + (01:33:58, 8 December 2024)
- ML20204C048 + (01:33:58, 8 December 2024)
- ML20204C043 + (01:33:59, 8 December 2024)
- ML20204C040 + (01:34:00, 8 December 2024)
- ML20204C041 + (01:34:00, 8 December 2024)
- ML20204C037 + (01:34:01, 8 December 2024)
- A06372, Responds to NRC Re Violations Noted in Insp Rept 50-336/86-23.Corrective Actions:Procedure MP 2720C6 for Periodic Maint on Electrical Switchgear Revised & Drawing Package Issued Re Panel C26 + (01:34:02, 8 December 2024)
- ML20204C032 + (01:34:03, 8 December 2024)
- ML20204C028 + (01:34:03, 8 December 2024)
- B12465, Forwards Addl Request for Relief from Performing Inservice Insp for First 10-yr Insp Interval,Specifically Inservice Surface Exam on Inaccessible Portions of Pressurizer Support skirt-to-shell Weld.Fee Paid + (01:34:05, 8 December 2024)
- ML20204C026 + (01:34:05, 8 December 2024)
- ML20204C022 + (01:34:06, 8 December 2024)