Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17326A027 + (20:26:23, 7 January 2025)
- ML17326A025 + (20:26:24, 7 January 2025)
- ML17326A024 + (20:26:24, 7 January 2025)
- PNO-III-99-033, on 990625,American Electric Power Co Announced Schedule for Restarting DC Cook Nuclear Power Station.Unit 2 Lead Unit Is Scheduled for Restart in Apr 2000 & Unit 1 Is Scheduled for Restart in Sept 2000 + (20:26:30, 7 January 2025)
- IR 05000315/1999012 + (20:26:33, 7 January 2025)
- ML17326A019 + (20:26:35, 7 January 2025)
- IR 05000315/1999014 + (20:26:38, 7 January 2025)
- ML17326A016 + (20:26:42, 7 January 2025)
- 05000315/LER-1999-014, :on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified + (20:26:49, 7 January 2025)
- ML17326A014 + (20:26:54, 7 January 2025)
- ML17326A011 + (20:27:06, 7 January 2025)
- ML17326A008 + (20:27:14, 7 January 2025)
- ML17326A007 + (20:27:17, 7 January 2025)
- ML17326A006 + (20:27:18, 7 January 2025)
- ML17326A003 + (20:27:18, 7 January 2025)
- ML17326A000 + (20:27:19, 7 January 2025)
- ML17325B800 + (20:27:20, 7 January 2025)
- ML17325B799 + (20:27:21, 7 January 2025)
- ML17325B796 + (20:27:22, 7 January 2025)
- IR 05000255/1987001 + (20:27:46, 7 January 2025)
- ML17325B793 + (20:27:47, 7 January 2025)
- ML17325B790 + (20:27:49, 7 January 2025)
- 0CAN078705, Responds to Violations Noted in Insp Repts 50-313/87-15 & 50-368/87-15.Corrective Actions:Bolts Cleaned,Nuts Tightened & Torqued & Operability Assessment Performed for Seismic Support.Repairs Completed 870507 + (20:27:53, 7 January 2025)
- ML17325B781 + (20:27:58, 7 January 2025)
- ML17325B765 + (20:27:59, 7 January 2025)
- ML17325B762 + (20:28:00, 7 January 2025)
- ML17325B742 + (20:28:01, 7 January 2025)
- ML17325B740 + (20:28:02, 7 January 2025)
- IR 05000315/1985014 + (20:28:03, 7 January 2025)
- ML17325B737 + (20:28:05, 7 January 2025)
- ML17325B736 + (20:28:06, 7 January 2025)
- ML17325B733 + (20:28:08, 7 January 2025)
- ML17325B709 + (20:28:08, 7 January 2025)
- ML17325B708 + (20:28:10, 7 January 2025)
- ML17325B694 + (20:28:14, 7 January 2025)
- ML17325B690 + (20:28:15, 7 January 2025)
- ML17325B681 + (20:28:16, 7 January 2025)
- ML17325B680 + (20:28:17, 7 January 2025)
- 1CAN098402, Application for Amend to License DPR-51,changing Tech Specs to Upgrade Emergency Feedwater Sys to Comply W/Requirements of NUREG-0737,Item II.E.1.2 + (20:28:37, 7 January 2025)
- ML17325B672 + (20:28:42, 7 January 2025)
- ML17325B670 + (20:28:43, 7 January 2025)
- ML17325B667 + (20:28:44, 7 January 2025)
- GO2-17-175, Response to Request for Additional Information Related to License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System + (20:28:45, 7 January 2025)
- ML17325B653 + (20:28:47, 7 January 2025)
- ML17325B650 + (20:28:48, 7 January 2025)
- ML17325B644 + (20:28:49, 7 January 2025)
- ML17325B643 + (20:28:50, 7 January 2025)
- 05000315/LER-1999-013, :on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed + (20:28:52, 7 January 2025)
- IR 05000315/1999006 + (20:28:54, 7 January 2025)
- ML17325B637 + (20:28:56, 7 January 2025)
- ML17325B635 + (20:28:56, 7 January 2025)