Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1980-010-03, /03L-0:on 800514,during Normal Operation,Process Radiation Monitors R-11 & R-12 Were Out of Svc for Approx 16-h.Caused by Failure of Air Sampling Blower Due to Normal Wear.Blower Replaced & Monitor Returned to Svc + (17:54:03, 7 January 2025)
- 05000250/LER-1980-009, Forwards LER 80-009/03L-0 + (17:54:05, 7 January 2025)
- 05000250/LER-1980-010, Forwards LER 80-010/03L-0 + (17:54:07, 7 January 2025)
- 05000251/LER-1980-008-01, /01T-0:on 800523,review of Radiographs Per IE Bulletin 79-13 Revealed Indications of Cracking in Feedwater Nozzle to Pipe Weld on Steam Generator 4 C Reducers.Cause Not Stated.Fittings Containing Defects Are Being Replaced + (17:54:09, 7 January 2025)
- 05000251/LER-1980-008, Forwards LER 80-008/01T-0 + (17:54:10, 7 January 2025)
- 05000250/LER-1980-011-01, /01T-0:on 800527,util Was Notified by NSSS Vendor That Nonconservative Error Had Been Discovered in Computer Inputs Used in Feb 1979 10CFR50.46 App K LOCA Analysis. Caused by Personnel Error + (17:54:12, 7 January 2025)
- 05000250/LER-1980-011, Forwards LER 80-011/01T-0 + (17:54:14, 7 January 2025)
- L-80-186, Forwards Info Re Addl TMI-related Requirements Per .Includes Shift Manning,Revising Scope & Criteria of Licensing Exams,Procedures for Feedback of Operating Experience to Plant Staff & PWR Vendor Rept + (17:54:15, 7 January 2025)
- ML17339B126 + (17:54:15, 7 January 2025)
- IR 05000250/1980015 + (17:54:18, 7 January 2025)
- ML17339B123 + (17:54:19, 7 January 2025)
- L-80-156, Responds to NRC Re Deviation Noted in IE Insp Repts 50-250/80-15 & 50-251/80-13.Corrective Actions:Mod Initiated to Install Audible & Visual Alarm for Loss of Voltage to Fire Pump + (17:54:20, 7 January 2025)
- ML17339B119 + (17:54:22, 7 January 2025)
- ML17339B120 + (17:54:22, 7 January 2025)
- ML17339B118 + (17:54:23, 7 January 2025)
- 05000251/LER-1980-003-03, While Testing 4C Steam Generator Feedwater Control Valve,Change in Steam Generator Level Lifted Low Setpoint Valve.Valve Did Not Fully Reseat. Caused by Binding Between Lifting Gear & Release Nut + (17:54:24, 7 January 2025)
- 05000251/LER-1980-003, Forwards Updated LER 80-003/03L-0 + (17:54:29, 7 January 2025)
- IR 05000250/1980010 + (17:54:31, 7 January 2025)
- ML17339B113 + (17:54:33, 7 January 2025)
- ML17339B112 + (17:54:34, 7 January 2025)
- L-80-141, Confirms,Per Conversation W/R Vogt-Lowell,that Response to IE Insp Repts 50-250/80-10 & 50-251/80-10 Will Be Submitted by 800509 + (17:54:35, 7 January 2025)
- ML17339B111 + (17:54:35, 7 January 2025)
- L-80-149, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-10 & 50-251/80-10.Corrective Actions: Preventative Maint to Be Performed on Critical Portions of Plant Communications Sys + (17:54:37, 7 January 2025)
- ML17339B107 + (17:54:39, 7 January 2025)
- IR 05000250/1980008 + (17:54:41, 7 January 2025)
- ML17339B104 + (17:54:42, 7 January 2025)
- ML17339B103 + (17:54:43, 7 January 2025)
- L-80-155, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-08 & 50-251/80-08.Corrective Actions: Personnel Counseled in Correct Procedural Compliance. Notation Made on Calibr Tickler Card + (17:54:44, 7 January 2025)
- ML17339B100 + (17:54:46, 7 January 2025)
- L-80-174, Forwards Safe Shutdown Evaluations for Auxiliary Bldg Hallway & Cable Spreading Room in Response to NRC 791029 Request for Fire Protection Info.Reactivity Control Sys Assures Safe Subcritical Core Conditions After Reactor Trip + (17:54:47, 7 January 2025)
- L-80-172, Notifies That Revised Emergency Plan Will Be Submitted by 800615,in Response to NRC + (17:54:48, 7 January 2025)
- L-80-158, Corrects & Supplements to NRC Re Proposed Amends to OL Permitting Steam Generator Repairs.Util Has Approved Various Plant Improvements,Including Installation of Condensate Polishing Demineralizers + (17:54:50, 7 January 2025)
- ML17339B095 + (17:54:52, 7 January 2025)
- 05000250/LER-1980-007-03, /03L-0:on 800424,during Planning & Implementation of Surveillance Per Tech Spec 4.15.4.a.1,six Electrical Penetration Fire Barriers Found Nonfunctional.Caused by Incomplete Installation.Barriers Repaired + (17:54:53, 7 January 2025)
- 05000250/LER-1980-007, Forwards LER 80-007/03L-0 + (17:54:55, 7 January 2025)
- IR 05000250/1980014 + (17:54:57, 7 January 2025)
- ML17339B089 + (17:54:58, 7 January 2025)
- ML17339B088 + (17:54:59, 7 January 2025)
- ML17339B087 + (17:54:59, 7 January 2025)
- L-80-171, Application to Amend App a of Licenses DPR-31 & DPR-41, Changing Tech Specs,Pages 3.2-2 & 3.2-4,to Reflect Results of Revised ECCS Analysis of Power Distribution Limits for 25% Steam Generator Tube Plugging.Revised Tech Specs Encl + (17:55:00, 7 January 2025)
- L-80-170, Forwards Results of Steam Generator Insps Showing Approx 22.4% Tube Plugging.Requests Permission to Resume Operation on 800612 + (17:55:02, 7 January 2025)
- NUREG-0651, Ack Receipt of 800402 & 0229 Ltrs.Discusses Criteria Used in Granting or Denying Amend requests.NUREG-0651, Evaluation of Steam Generator Tube Rupture Events, Encl. W/O Encl + (17:55:04, 7 January 2025)
- ML17339B078 + (17:55:07, 7 January 2025)
- L-80-100, Responds to NRC 791219 & s Re Violations Noted in IE Insp Repts 50-250/79-35,50-251/79-35,50-335/79-33 & 50-389/79-22.Corrective Actions:Qa Procedures Will Be Revised Re Implementation of 10CFR21 + (17:55:08, 7 January 2025)
- L-80-135, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/79-35,50-251/79-35,50-335/79-33 & 50-389/79-22. Corrective Actions:Qa Procedures Will Be Revised W/Full Compliance Achieved by 800731 + (17:55:09, 7 January 2025)
- ML17339B070 + (17:55:16, 7 January 2025)
- ML17339B067 + (17:55:22, 7 January 2025)
- ML17339B066 + (17:55:22, 7 January 2025)
- L-80-148, Forwards Response to IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/Continued Feedwater Addition. No Further Action Anticipated for Return to Power Response + (17:55:24, 7 January 2025)
- ML17339B060 + (17:55:27, 7 January 2025)
- ML17339B058 + (17:55:28, 7 January 2025)