~g REoy
~o~i
0O
IIO
'+n
~O
++*++
In Reply Refer To:
RII:RVL
50"250/80"10
50"251/80-10
UNITEDSTATES
NUCLEAR REGULATORY COMMlSSlON
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
APR 1 4 l980
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
This refers to the inspection
conducted by R. Vogt-Lowell of this office on
February 1-29,
1980 of activities authorized by NRC License Nos.
DPR-31 and
DPR-41 for the Turkey Point facility, and to the discussion of our findings held
with H. E. Yaeger at the conclusion of the inspection.
, ~
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements
are listed in the Notice of Violation enclosed
here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal
Regulations.
Section 2.20l requires you to submit to this office, within 20
days of your receipt of this notice,
a written statement
or explanation in reply
including:
(l) corrective steps
which have been taken by you and the results
achieved;
(2) corrective steps which will be taken to avoid further noncompli-
ance;
and (3) the date
when full compliance will be achieved.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission
and have safety significance.
This item is identified in the Noti.ce of Deviation enclosed herewith as Appendix B.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
takent corrective actions which will be taken to avoid further deviations,
and
the'date
corrective actions
were or will be completed.
In accordance with Section 2.790 of the NRC's "Rules oPKactice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written applicatibn within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement of the reasons
on the basis of which
t
it is claimed that the informati.on is proprietary,
and should be prepared
so
Florida Power and Light Company
>~A 1 4]980
that proprietary information identified in the application is
separate
part of the document.
If we do not hear from you in
the specified period, the report will be placed in the Public
Should you have any questions
concerning this letter,
we will
them with you.
contained in a
this regard'within
Document
Room.
P
be glad to discuss
Sincerely,
g.c.
R.
C. I wis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-250/80-10
and 50-251/80-10
cc w/encl:
H. E. Yaeger, Plant Manager
P. 0. Box 013100
Miami, FL
33101
f