APPENDIX A NOTICE QF VIOLATION Florida Power and Light Company Turkey Point Unit 3 License No. DPR-31 Based on the NRC inspection February 1"29, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in correspondence to you dated December 31, 1974.
As required by Section 6.8.1 of the Technical Specifications, written procedures and administrative policies that meet or exceed the requirements and recommendations of Sections 5.1 and 5.3 of ANSI N18.7-1972 and Appendix A of USNRC Regulatory Guide 1.33 shall be implemented Contrary to the above, the following two examples represent a failure to implement existing procedures:
(1)
On February 4, 1980 at ll:41 p.m., Unit 3 failure to follow the procedural steps of "Reactor Protection System-Periodic Test" of the reactor trip bypass breakers prior trip breakers.
was tripped due to the Operating Procedure 1004.2, which required the closing to the opening of the reactor (2)
On February 26, 1980, operations personnel were unable the Pressurizer Relief Tank (PRT) level was maintained specified by step 8.2.5 of Operating Procedure 1300.1, Relief Tank" on account of this reduction of PRT level in the absence and unawareness of the existence of the procedure.
to confirm that at the limit "Pressurizer being conducted aforementioned This is an infraction.