ML17339B070
| ML17339B070 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/27/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-80-158, NUDOCS 8006030053 | |
| Download: ML17339B070 (5) | |
Text
REGULATORY O'ORMATION DISTRIBUTION 'SYW (RIBS)
ACCESSION NBR:8006030053 DOC ~ DATE: 80/05/27 NOTARIZED<
NO re FACIL,:50 250 Turkey Point Planti Unit 3i Florida Power and Light C
50"251 Tur key Point Plantp Unit Qi Flor ida Power and Light C
0500A51 AUTH BYNAME AUTHOR AFFILIATION UHRIGs R ~ E ~
,FIor ida Power 8 Light Co, RECIP ~ NAME
'ECIPIENT AFFILIATION EISENHUT<D,G.
Division of Licensing
SUBJECT:
Corrects 8 supplements 800318 ltr re steam generator repai,re Monitoring repts submitted annually by 800331>>
Improvements designed to enhance secondary water chemistry control being implemented.
DISTRIBUTION CODE:
A001S COPIES RECEIVED:LTR ENCL SIZE:
0 TITLE: General Distr ibution for after Issuance of Operating Pic RECIPIENT ID CODE/NAME ACTION.
05 BC ~pBW i INTERNAL:
12 ILE 17 ENGR BR 19 PLANT SYS BR
?1 EFLT TRT SYS OELD EXTERNAL'. 03 LPDR 23 ACRS COPIES LTTR ENCL-
- 116, 1
RECIPIENT ID CODE/NAME 02 NRC PDR 15 CORE PERF~
BR 18 REAC SFTY BR 20 EEB EPB DOR STS GROUP LEADR 04 NSIC COPIES LTTR ENCL
~
JUN 41989
l tl Il t
I tt tl
'I l
t'l /
l
(ll/y c
FLORIDA POWER & LIGHTCOMPANY May 27, 1980 L-80-158 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut Acting Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Eisenhut:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Steam Generator Re air The purpose of this letter is to correct and supplement my letter dated March 18, 1980 to Mr. A. Schwencer in response to Mr. Schwencer's letter to me dated November 19, 1979.
In Attachment 1 of my letter of March 18,
- 1980, FPL responded to a number of NRC Staff questions requesting information about the full flow conden-sate polishing demineralizer system for Turkey Point Units 3 and 4.
Those responses indicated that the effluent from the demineralizer will be high quality supernatant liquid and will be consistent with the terms and conditions of the existing NPDES permit for Turkey Point.
In our response to guestion 9, in Attachment 1, FPL incorrectly stated that monitoring reports are submitted annually to the NRC on January 31st.
The reports are in fact submitted annually by March 31st.
In that connection FPL has approved various plant improvements, including the installation of condensate polishing demineralizers, which are designed to improve secondary water chemistry control for our nuclear plants.
These improvements are currently being implemented in the Company's operating nuclear power plants at St.
Lucie and Turkey Point, consistent with procurement lead times and planned unit outages.
These improvements are also being incorporated into the design of the Company's nuclear power plant which is presently under construction at St. Lucie.
In Attachment 2 to my letter of March 18,
- 1980, FPL provided the documentation for its determination that the installation and operation of the condensate 'polishing demineralizers does not involve an unreviewed (oo'()
g6080 083 PEOPLE... SERVING PEOPLE
/ )l~.i',
I' f
Office of Nuclear Reactor Regulation Page Two safety question pursuant to 10 CFR 50.59(a)
(2).
Should you have any further questions, please call me.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/GDW/ah cc:
J.
P. O'Reilly, Region II Harold F. Reis, Esquire