ML17339B123
| ML17339B123 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/25/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17339B121 | List: |
| References | |
| NUDOCS 8006200219 | |
| Download: ML17339B123 (4) | |
See also: IR 05000250/1980015
Text
gp,R REOy
O
Cy
n
gg
+~
gO
++*++
I
In Reply Refer To:
RII:RVL
50-250/80-15
50-251/80-13
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
APR 8 8880
Florida'Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
This refers
to the inspection
conducted
by R. Vogt-Iowell of this office on
March
1 through 31,
1980 of activities authorized
by NRC Operating License Nos.
and
DPR-41 for the Turkey Point facility, and to the discussion of our
findings held with J.
Hays at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection it was
found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix A.
Please
provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken,
corrective actions
which will be taken to avoid further deviations,
and
the date corrective actions were or will be completed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold 'such
information from public disclosure.
Any such application must
include
a full statement of the reasons
on the basis of which it is claimed that
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained in a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report willbe placed in the Public Document. Room.
'4
~P
s oooo o0tIC
'"pl
5'4
I,
E
>
/
Florida Power and Light Company
gag g 51980
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
R.
C. Lewis, Acting hief
Reactor Operations
and Nuclear
Support Branch
Enclosures:
l.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-250/80-15
and 50-251/80-13
cc w/encl:
H. E. Yaeger, Plant Manager
P. 0. Box 013100
Miami, FL
33101
0=
I.
d
g ~