Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A598 + (17:45:20, 7 January 2025)
- 05000250/LER-1980-027-01, /01T-0:on 801212,motor Operated Valve in Sample Line from Steam Generator 3A Found Closed,Precluding Generator Monitoring.Caused by Valve Operator Inadvertently Closing Valve During Maint + (17:45:22, 7 January 2025)
- 05000250/LER-1980-026-01, /01T-0:on 801211,125-volt Dc Battery 4B Out of Svc for Approx 25-h.Caused by Servicing for Annual Discharge Test.Battery Returned to Full Charge + (17:45:27, 7 January 2025)
- 05000250/LER-1980-027, Forwards LER 80-027/01T-0 + (17:45:28, 7 January 2025)
- 05000250/LER-1980-026, Forwards LER 80-026/01T-0 + (17:45:30, 7 January 2025)
- 05000250/LER-1980-025-01, /01T-0:on 801203,AE Advised That Insp Per IE Bulletin 79-14 Revealed Potential Deficiency in Support of Accumulator Nozzles 3A & 3B During Seismic Event.Caused by Max Stress Exceeding Acceptance Criteria + (17:45:32, 7 January 2025)
- 05000250/LER-1980-025, Forwards LER 80-025/01T-0 + (17:45:33, 7 January 2025)
- ML17340A588 + (17:45:35, 7 January 2025)
- ML17340A587 + (17:45:36, 7 January 2025)
- IR 05000250/1980029 + (17:45:37, 7 January 2025)
- ML17340A582 + (17:45:38, 7 January 2025)
- ML17340A571 + (17:45:40, 7 January 2025)
- ML17340A573 + (17:45:40, 7 January 2025)
- ML17340A570 + (17:45:41, 7 January 2025)
- ML17340A569 + (17:45:41, 7 January 2025)
- IR 05000250/1980030 + (17:45:43, 7 January 2025)
- ML17340A566 + (17:45:44, 7 January 2025)
- ML17340A559 + (17:45:44, 7 January 2025)
- L-80-340, Application to Amend Licenses DPR-31 & DPR-41,moving One Sample Location from Onsite Location T79 to Onsite Location T72,due to High Potential for Oil Contamination at Old Location + (17:45:45, 7 January 2025)
- L-80-427, Forwards Proposed Amend to App a of Licenses DPR-31 & DPR-41,to Provide for Redundancy in Decay Heat Removal Sys for All Modes of Reactor Operation,In Response to NRC 800611 Request + (17:45:47, 7 January 2025)
- ML17340A555 + (17:45:47, 7 January 2025)
- ML17340A552 + (17:45:49, 7 January 2025)
- 05000250/LER-1980-022-03, /03L-0:on 801103,control Rod M-8 (in Control Bank D) Dropped During Power Operation.Cause Unknown.Rod Retrieved & Unit Returned to Full Power Per Approved Procedures + (17:45:51, 7 January 2025)
- 05000251/LER-1980-014-01, /01T-0:on 801126,insp Per IE Bulletin 79-14 Revealed Deficiency in Portions of Accumulator & RHR Sys Piping Inside Containment.Calculated Max Stress Exceeded Criteria.Mod Will Be Made Before Unit Returns to Svc + (17:45:53, 7 January 2025)
- 05000250/LER-1980-022, Forwards LER 80-022/03L-0 + (17:45:56, 7 January 2025)
- 05000251/LER-1980-014, Forwards LER 80-014/01T-0 + (17:45:57, 7 January 2025)
- L-80-425, Forwards Security Plan Info Re Protected Area Boundary at Facilities.Info Withheld (Ref 10CFR2.790) + (17:45:58, 7 January 2025)
- L-80-420, Advises That Response to Items Re Fire Protection Will Be Submitted by 810130 + (17:46:00, 7 January 2025)
- 05000250/LER-1980-023-03, /03L-0:on 801108,surveillance Check of Refueling Water Storage Tank Level Was Not Completed within Required Time Interval.Caused by Personnel Error Resulting in Missed Entry on Check List.Personnel Have Been Reinstructed + (17:46:02, 7 January 2025)
- 05000250/LER-1980-023, Forwards LER 80-023/03L-0 + (17:46:04, 7 January 2025)
- 05000250/LER-1980-021-03, /03L-0:on 801101,seismograph Found Inoperable Following Initial Successful Calibr Check.Caused by Batteries Discharged by Electrical Problem in Seismograph. Assembly Returned to Manufacturer for Expedited Repair + (17:46:05, 7 January 2025)
- L-80-419, Forwards Response to Re NUREG-0737 Implementation Status of post-TMI Requirements + (17:46:06, 7 January 2025)
- 05000250/LER-1980-021, Forwards LER 80-021/03L-0 + (17:46:09, 7 January 2025)
- ML17340A531 + (17:46:10, 7 January 2025)
- ML17340A530 + (17:46:11, 7 January 2025)
- ML17340A525 + (17:46:11, 7 January 2025)
- ML17340A523 + (17:46:12, 7 January 2025)
- L-80-417, Application to Amend Licenses DPR-31 & DPR 41 Authorizing Proposed Changes to Tech Specs Per TMI Lessons Learned + (17:46:13, 7 January 2025)
- ML17340A520 + (17:46:15, 7 January 2025)
- ML17340A517 + (17:46:16, 7 January 2025)
- ML17340A516 + (17:46:17, 7 January 2025)
- ML17340A515 + (17:46:18, 7 January 2025)
- L-80-410, Forwards Revision 3 to QA Manual + (17:46:19, 7 January 2025)
- L-80-411, Forwards Addl Info Re Distribution Sys Voltages,In Response to NRC .Since Safety Injection Signal Initiates Automatic Fast Transfer from Auxiliary Transformer to Startup Transformer,Only Connection Via Startup Analyzed + (17:46:21, 7 January 2025)
- ML17340A511 + (17:46:23, 7 January 2025)
- ML17340A510 + (17:46:24, 7 January 2025)
- L-80-412, Forwards Steam Generator Insp Results from Current Outage. Results Show No New Phenomena & Verify General Denting Pattern within Predictable Limits Consistent W/Previous Insp.Requests Permission to Return to Full Power Operation + (17:46:25, 7 January 2025)
- ML17340A505 + (17:46:27, 7 January 2025)
- ML17340A503 + (17:46:28, 7 January 2025)
- ML17340A501 + (17:46:29, 7 January 2025)
- ML17340A498 + (17:46:30, 7 January 2025)