Text

0ECEMBER 8

Docket Nos. 50-250 and 50-251 Dr. Robert E.: Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Flor ida 33152

Dear Or-Uhrig:

Distribution

'fJP Docket Fil nd 50-25j ',-

NRC PDRs

(

Local PDR TERA HSIC NRR Reading ORBl Reading T.

Novak, Yarga E. Reeves N. Grotenhuis J.

Roe J.

Heltemes C. Parrish S. Goldberg I8E (3)

C*'~C.i'>+

CtO

SUBJECT:

CONFIRMATIOH OF CON,')ITMENT TO STAFF'S OCTOBER 23, 1979 INTERItt POSITION ON CONTAINMENT PURGING 'AND VENTIHG C

Me have completed our review of'your submittals for your facility wh)ch provided your commitments to our October 23, 1979 "Interim Position on Containment Purging and Venting Pending Resolution of Isolation Valve Operability."

He find your commitments to the Interim Position accept-able and are to remain, in effect pending completion of our long-term review.

You may receive additional staff guidance or questions as our long-ter1a review continues.

At the conclusion of our long-term review, we will provide you icith our Safety Evaluation and request Technical Specification changes if required.

A response to this confirmatory letter is not required.

Sincerely,

~Original signed. by g Se A. Varga Steven A. Varga, Chief Operating Reactors Branch Pl Division of Licensing cc:

See next page 4

IIX2880 3 l5 il OFFICE)

SURNAME DATE$

.-.DL;ORBI........ Dj.;0%3.........'DL:ORB6.

,.MGrotanhui s... EAReeves....,.'..SAYarga;

..'ll/. /80.jb...1'.1.//80....,...]1/,. /80.

NRC FORM 318 (9.76) NRCM 0240 OU.S. GOVERNMENT. PRINTING OFFICE: 1979.289.369

(

C 4

r-li It

~S REQy

~4 0

A, 0

lg~

.gO

, UNITED STATES NUCLEAR.REGULATORY COMMISSION WASHINGTOM, O. C. 20555 De ember 8, 1980 Docket Nos.

50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami-,.Florida 33152 I

Dear Dr. Uhrig:

SUBJECT:

CONFIRMATION OF COMMITMENT TO STAFF'S OCTOBER 23, 1979 INTERIM

.POSITION ON CONTAINMENT PURGING AND VENTING We have completed our.review of your submittals for your facility which provided your commitments to our October 23, 1979 "Interim Position on Containment Purging and Venting Pending Resolution of Isolation Valve Operability."

We find your commitments to the Interim Position accept-able and are to remain in effect pending completion of our long-term review.

You may receive additional staff guidance or questions as our long-term review continues.

At the conclusion of our long-term review, we wi.ll provide you with our Safety Evaluation and request Technical Specification changes if required.

A response to this confirmatory letter is not required.

Sincerely, Operating Reactors Bra ch Fl Division of Licensin cc:

See next page

i N

Robert E. Uhri,g Flor,ida Power and',,ight Company December 8, 1980 cc:.

Mr. Robert Lowenstein, Esquire Lowenstein,

Newman, Reis and Axelrad 1025'onnecticut. Avenue, N.'W.

Suite 1214 Washington, D-C.

20036 r,, ~

Environmental and Urban Affairs Library Florida International University

'!hi,ami, Florida 33199 Mr. Norman A. Coll, Esquire

Steel, Hector and 'Davis 1400 Southeast First National Bank Buildina Miami, Florida 331'31 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.

Box 013100 t~iiami, Florida 33101 ter.. Jack Shreve Office of the Public Counsel Room 4, Holland. Building Ta1 1 ahassee, F'1 ori da 32304 Admi nistrator