ML17340A598

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-250/80-34 on 801113-14.No Noncompliance Noted
ML17340A598
Person / Time
Site: Turkey Point 
Issue date: 12/02/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340A599 List:
References
NUDOCS 8101140108
Download: ML17340A598 (4)


See also: IR 05000250/1980034

Text

~8 REQIt,

c"

~

wpO

~t

~c

t

ClO

ItA

I

Ct

+y

qP

In Reply Refer To:

RI

BRC

0-250/80-34

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SuITE 3100

ATLANTA,GEORGIA 30303

OEtl -2 t980

ciRg

<t'C3

A

C7

v

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice

President'.

0. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the inspection

conducted

by B. R. Crowley of this office on

November 13-14,

1980 of activities authorized

by NRC Operating License No. DPR-

31 for the Turkey Point facility, and to the discussion

of our findings held

with J. K. Hays at the conclusion 'of the inspection.

Areas

examined

during the inspection

and

our findings are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

t

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We

have

examined

actions

you

have

taken with regard

to previously reported

unresolved items.

The status of these items is discussed in the enclosed report.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this,office to withhol'd such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained 'in a

separate

part of the document. If we do not hear: from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murp y, Chief

Reactor Construction

and Engineering

Support Branch

Enclosure:

(See

Page

2)

l 4

3

r:

L

i

Florida Power and Light Company

Enclosure:

Inspection Report

No. 50-250/80-34

cc w/encl:

H. E.. Yaeger, Plant Manager

r