Forwards IE Insp Repts 50-250/80-29 & 50-251/80-28 on 801021-24.No Noncompliance Noted
ML17340A582
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/28/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340A583 List:
References
NUDOCS 8101100829
Download: ML17340A582 (4)


See also: IR 05000250/1980029

Text

gP,R RECI

P

~!I E

o~'Cp

~O

++**+

In Reply Refer To:

RII:J

0~50/80-29

50-251/80-2

NOY 28SO

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. O. Box 529100

Miami, FL

33152

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I I

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

r

~t

7

C/l

Gentlemen:

This refers

to the inspection

conducted

by J. J. Ienahan

of this office on

October 21-24,

1980 of activities

authorized

by

NRC Operating

License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility, and to the discussion of our

findings held with H. E. Yeager at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item willbe examined during subsequent

inspections.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

Title l0,

Code of Federal

Regulations,

a

copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room, If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that, you make

a written application within 20 days

,to this office to withhold such information from public disclosure.

Any such

application

must include

a full statement

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and

should

be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

~

~

C. E. Murphy, Chief

Reactor Construction 6 Engineering

Support Branch

Enclosure:

(See

Page

2)

!lJ

I

Florida Power and Light Company

%0V 28 Ipse

e

Enclosure:

Inspection Report

Nos. 50-250/80-29

and 50-251/80-28

cc w/encl:

H. E. Yaeger, Plant Manager