1 gp,S RKC(
+
UNITED STATES NUCLEAR REGULATORY COMMlSStON WASHINGTON, D. C. 20555 Docket Nos.
50-250 and 50-251 November 28, 1980 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152
Dear Dr. Uhrig:
The Comission has issued the enclosed Amendment No.
61 to Facility Operating License No.
DPR-31 and Amendment No.
52 to Facility Operating License No.
DPR-41 for the Turkey Point Plant Unit, Nos.
3 and 4,,respectively.
The amendments consist of changes to the Facility Operating Licenses in response to your filing transmitted by letter dated June 19, 1980 (L-80-193).
The amendments modify License Nos.
DPR-31 and DPR-41 to include a requirement to maintain a Safeguards Contingency Plan to be fully implemented, in accord-ance with 10 CFR 73.40(b), within 30 days of this approval by the Comission.
>te have completed our review and evaluation of your Safeguards Contingency Plan and have concluded that the plan for your facility, when fully imple-mented, will provide the protection needed to meet the general performance requirements of 10 CFR 50.54(p) and 73.40(b) and the objectives of the specific requirements of 10 CFR 73-55(h) and Appendix C to 10 CFR 73.
Me, therefore, further conclude that your Safeguards Contingency Plan is accept-abl e.
Changes which would not decrease the effectiveness of your approved Safeguards Contingency Plan may be made without approval by the Commission pursuant to the authority of 10 CFR 50.54(p).
A report containing a description of each change shall be furnished to the Director, Office of Nuclear Reactor Regulation, U. S. Nuclear Regulatory ComIission, Washington, D. C. 20555, with a copy to the appropriate NRC Regional Office within two months after the change is made.
Records of changes made without Commission approval shall be maintained for a period of two years from the date of the change.
These amendments apply to the Safeguards Contingency Plan and.therefore do not authorize a change in effluent types or total amounts nor an increase in power level, and will not result in any significant environmental impact.
Having made this determination, we have further concluded that these amend-ments involve an action which is insignificant from the standpoint of environmental impact and pursuant.to 10 CFR 51.5(d)(4) that an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of these amendments.
~ Dr. Robert E. Uhrig Florida Power and Light Company November 28, 1980 Since these amendments apply to the Safeguards Contingency Plan, they do not involve significant new safety information of a type not considered by a previous Commission safety review of the facility.
They'o not involve a significant increase in the probability or consequences of an accident, do not involve a significant decrease in a safety margin, and therefore, do not involve a significant hazards consideration.
'We have also concluded that there is reasonable assurance that the health and safety of the public will not be endangered by this action and that the issuance of these amend-ments will not be inimical to the common defense and security or to the health and safety of the public.
We will continue to withhold your Safeguards Contingency Plan and related materials from public disclosure in accordance with the provisions of 10 CFR 2.790{d).
A copy of the Notice of Issuance is also enclosed.
S i nce rely, l LQL Steven g,
ef Operating Reactors branch
<1 0ivisi on of Li cens i ng
Enclosures:
1.
Amendment No.
61 to DPR-31 2.
Amendment No.
52 to DPR-41 3.
Notice of Issuance cc:
w/enclosures See next page
Robert E. Uhrig Florida Power and Light Company November 28, 1980 cc:
Mr-Robert Lowenstein, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut
- Avenue, N.W.
Suite 1214 Washington, D.
C.
20036 Environmental and Urban Affairs Library Flori da International Uni vers ity Miami, Fl orida 33199 Mr. Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P, 0.
Box 013100 Miami,. Fl or ida 33101 Honorable Dewey Knight County Manager of Metropolitan Dade County Miami, Florida 33130 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 32304 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 971277
.guail Heights Station Miami, Florida 33197 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)
U. S. Environmental Protection Agency Washington, D. C.
20460 U. S. Environmental Protection Agency Region IV Office ATTN:
EIS COORDINATOR 345 Courtland Street, N.W.
Atlanta, Georgi a 30308 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301
tpfl RKCO O~
f.~
I
~ o 4'~*<<+
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POHER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO 3
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No-61 License No.
DPR-31 1.
The Nuclear Regulatory CoraIIission (the Commission) has found that:
A.
B.
C.
D.
The filing by Florida Power and Light Company (the licensee) dated June 19, 1980,. complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I;
The facility will operate in conformity with the filing, th'e provisions of the Act, and the rules and regu'lations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii).that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No.
DPR-31 is hereby amended to add a
nevi paragraph 3.H to read as follows:
3.H Safe uards Contin enc Plan The licensee shall fully implement and maintain in effect all provisions of the Comaission-approved Safeguards Contingency
- Plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p).
The approved Contingency Plan consists of documents withheld from public disclosure pursuant to 10 CFR 2.790(d) and identified as "Turkey Point Plant Safeguards Contingency Plan" dated June 17,
'l980 and submitted pursuant to 10 CFR 73.40.
The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b), within 30 days of this approval by the Commission.
3..
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGUI ATORY COMMISSION e en'.~Yarg,Chi f Operating Reactor 8
nch 81 Division of Licens'ate of Issuance:
November 28, 1980
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
61 TO FACILITY OPERATING LICENSE NO.
DPR-31 DOCKET NO. 50-250 Replace the following pages of Facility Operating License No.
DPR-31 with, the attached pages as indicated.
The changed area in the license is indicated by a marginal line.
Remove Pa es Insert Pa es
G.
Fire Protection The licensee may proceed with and is required to provide a
schedule for and to complete the modifications identified in Paragraphs 3-1.1 through 3.1.19 of the NRC's Fire Protection Safety Evaluation, dated March 21; 1979 for the facility.
These modifications are to be completed prior to December 1980.
If any modifications cannot be completed on schedule the licensee shall submit a report 'explaining the circumstances together with a revised schedule.
In addition, the licensee shall submit the additional information identified in Sections 3.1 and 3.2 of the related Safety Evaluation in accordance with the schedule contained herein.
In the event these dates for submittal cannot be met, the licensee shall submit a report, explaining the circumstances, together with a revised schedule.
The licensee is required to develop and implement the administrative controls which are consistent with the licensee's letters of August 28 and November 7, 1978 within three months from the date of this amendment.
H.
Safe uards Contin enc Plan The licensee shall fully implement and maintai n in effect all provisions of the Commission-approved Safeguards Contingency Plan, including amendments and'changes made pursuant to the authority of 10 CFR 50.54(p).
The approved Contingency Plan consists of documents withheld from public disclosure pursuant to 10 CFR 2.790(d) and identified as "Turkey Point Plant Safeguards Contingency Plan" dated June 17, 1980 and. submitted pursuant to 10 CFR 73.40.
The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b), within 30 days of this approval.
4.
FPL shall proceed with implementation of the recommendations set forth in paragraphs 7b and c of the "Summary and Conclusions" section of the "Final Environmental Statement Related to Operation of Turkey Point Plant, Florida Power and Light Company, Docket Nos.
50-250 and 50-251,"
issued July 1972 by the AEC Directorate of Licensing.
No later than thirty (30) days from the date of issuance of this license, FPL shall submit to the AEC, for review and approval, its plan for the imple-mentation of such recommendations.
Amendment No.
61 5.
This license is effective as of the date of issuance, and shall expire at midnight April 27,,2007.
FOR THE ATOMIC ENERGY COMMISSION Original Signed by D. J. Skovholt for A. Giambusso, Deputy Director for Reactor Projects
=
Directorate of Licensing
Attachment:
Appendix A - Technical Specifications Date of Issuance; July 19, 1972 Amendment No.
61
~pii Rf0(
+4 0
c" 4r>
gy p%~
+*a++
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COYiPANY DOCKET NO.
50-251 TURKEY POINT PLANT UNIT NO.
4 AMENDYiENT TO FACILITY OPERATING LICENSE
~ Amendment No. 52 License No.
DPR-41 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
C.
The filing by Florida Power and Light Company (the licensee) dated June 19, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I;
The facility will operate in conformity with the filing, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) -that such activities will be conducted in compliance with the Commission's regulations; D-
. The issuance of this amendment will not be inimical to the common defense and security or to=the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No.
DPR-41 is hereby amended to add a
new paragraph 3.G to read as follows:
3.G Safe uards Contin enc Plan The licensee shall fully implement and maintain in effect all provisions of the Commission-approved Safeguards Contingency
- Plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p).
The approved Contingency Plan consists of documents withheld from public disclosure pursuant to 10 CFR 2.790(d) and identified. as "Turkey Point Plant Safeguards Contingency Plan" dated June 17, 1980 and submitted pursuant to 10 CFR 73.40.
The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b), within 30 days of this approval by the Commission.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION even A.
- arga, Chief
'Operating Reactors Br
~1 Division of'Licensing Date of Issuance:
November 28, 1980
ATTACHMENT TO. LICENSE AMENDMENT AMENDMENT NO. 52 TO FACILITY OPERATING LICENSE NO.
DPR-41 DOCKET NO.
50-251 Replace the following pages of Facility Operating License No.
DPR-41 with the attached pages as indicated.
The changed area in the license is indicated by a marginal line.
Remove Pa es Insert Pa es
E.
The licensee shall maintain in effect and fully implement all provisions of the Commission-approved physical security plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p).
The approved security plan documents, withheld from public disclosure pursuant to 10 CFR 2.790(d),
collectively titled "Turkey Point Plant Unit Nos.
3 and 4
Physical Security Plan", dated,October 18,
- 1978, as supplemented February 20, 1979".
F.
Fire Protection The licensee may proceed with and is required to provide a schedule for and to complete the modifications identified in Paragraphs
- 3. 1. 1 through 3. 1-19 of the NRC's Fire Protection Safety Evaluation, dated Hay 21, 1979 for the facility.
These modifications are to be completed pri or to December 1980.
If any modifications cannot be completed on schedule the licensee shall submit a report explaining the circumstances together with a revised schedule.
In addition, the licensee shall submit the additional information identified in Sections
- 3. 1 and 3.2 of the related Safety Evaluation in accordance with the schedule contained therein.
In the event these dates for submittal cannot be met, the licensee shall submit a report, explaining the circumstances, together with a revised schedule.,
The licensee is required to develop and implement the administrative controls which are consistent with the licensee's letters of August 20 and November 7, 1978 within three months from the date of this amendment.
G.
Safe uards Contin enc Plan The licensee. shall fully implement and maintain in effect all provisions of the Commission-approved Safeguards Contingency Plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p).
The approved Contingency Plan consists of documents withheld from public disclosure pursuant to 10 CFR 2.790(d) and identified as "Turkey Point Plant Safeguards Contingency Plan" dated June 17, 1980 and submitted pursuant to 10 CFR 73.40-The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b), within 30 days of this approval by the Commission.
Amendment No.
52
4.
This license is effective as of the date of issuance, and shall expire at midnight April 27, 2007.
FOR THE ATOMIC ENERGY COMMISSION Attachments:
Appendix A - Technical Specifications Appendix B - Environmental Technical Soecifications Date. of Issuance:
April 10, 1973'riginal Signed By A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing Amendment No.
52