Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17341B528 + (17:17:43, 7 January 2025)
- ML17341B526 + (17:17:44, 7 January 2025)
- L-82-540, Informs That Util Will Utilize Westinghouse Optimized Fuel Assemblies During Fall 1983 Refueling + (17:17:45, 7 January 2025)
- ML17341B523 + (17:17:47, 7 January 2025)
- L-82-522, Forwards Turkey Point Unit 3 Containment Structure Post- Tensioning Sys:Tenth-Yr Surveillance & Turkey Point Unit 4 Containment Structure Post-Tensioning Sys:Tenth-Yr Surveillance. W/O Rept for Unit 4 + (17:17:48, 7 January 2025)
- ML17341B520 + (17:17:50, 7 January 2025)
- L-82-523, Forwards Groundwater Monitoring Program Summary Rept, Jul 1981-June 1982 + (17:17:51, 7 January 2025)
- ML17341B516 + (17:17:53, 7 January 2025)
- L-82-518, Responds to Generic Ltr 82-22 Re Congressional Request for Info Concerning Steam Generator Tube Integrity.Util Does Not Plan on Submitting Further Info or Completing Questionnaire, Since Previously Submitted Repts Contain Requested Info + (17:17:54, 7 January 2025)
- ML17341B510 + (17:17:56, 7 January 2025)
- L-82-514, Forwards Inservice Insp Relief Requests 6 & 7,originally Transmitted 790918 & Clarified W/Addl Info,In Response to NRC 820316 & 0614 Requests + (17:17:57, 7 January 2025)
- L-82-512, Informs of Intention to Install Seismically Mounted Debris Screens for Containment Purge Supply & Exhaust Valves at Next Refueling Outage for Unit 3 & Next Refueling Outage Following Steam Generator Repair Outage for Unit 4 + (17:18:05, 7 January 2025)
- L-82-509, Forwards Info Re Adequacy of Station Electric Distribution Voltages,In Response to 821022 Telcon Request.No Single Failure Can Affect Both Circuits Simultaneously or Consequentially Such That Both Required Circuits Lost + (17:18:07, 7 January 2025)
- ML17341B504 + (17:18:10, 7 January 2025)
- ML17341B502 + (17:18:14, 7 January 2025)
- L-82-447, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 20101 Re Emergency Coordinator duties,20104 Re Emergency Roster & 20112 Re Communications Network + (17:18:15, 7 January 2025)
- ML17341B497 + (17:18:17, 7 January 2025)
- ML17341B496 + (17:18:21, 7 January 2025)
- L-82-483, Application to Amend Licenses DPR-31 & DPR-41,modifying Tech Specs Re Flowrate of Auxiliary Feedwater Sys from 600 Gpm to 373 Gpm for Model 44F Steam Generators + (17:18:24, 7 January 2025)
- L-82-501, Forwards Encl Inadvertently Omitted from 821110 Response Re App R Fire Protection Submittal + (17:18:26, 7 January 2025)
- L-82-500, Forwards Supplemental Info,10CFR50,App R,Fire Hazards Analysis, in Response to Questions Posed by NRC at 821027 Meeting + (17:18:28, 7 January 2025)
- ML17341B488 + (17:18:30, 7 January 2025)
- ML17341B486 + (17:18:37, 7 January 2025)
- ML17341B485 + (17:18:39, 7 January 2025)
- ML17341B484 + (17:18:43, 7 January 2025)
- L-82-497, Submits Tech Spec Exemptions for Steam Generator Repair Outage.Unit Defueled Until Repairs Complete + (17:18:46, 7 January 2025)
- L-82-495, Responds to NRC Requesting Addl Info Re 780809 Application to Amend Tech Specs to Add Valves 863A & 863B to ECCS Valve List.Change Will Facilitate Surveillance & Maint of Valves + (17:18:48, 7 January 2025)
- ML17341B479 + (17:18:55, 7 January 2025)
- L-82-482, Application to Amend Licenses DPR-31 & DPR-41.Amend Correctly Identifies Tendon Surveyed During First,Third Fifth & tenth-yr Surveillance.Safety Evaluation Encl + (17:18:56, 7 January 2025)
- ML17341B471 + (17:18:58, 7 January 2025)
- ML17341B470 + (17:18:59, 7 January 2025)
- ML17341B466 + (17:19:03, 7 January 2025)
- ML17341B468 + (17:19:03, 7 January 2025)
- ML17341B462 + (17:19:05, 7 January 2025)
- ML17341B461 + (17:19:06, 7 January 2025)
- ML17341B458 + (17:19:10, 7 January 2025)
- ML17341B457 + (17:19:11, 7 January 2025)
- ML17341B456 + (17:19:12, 7 January 2025)
- ML17341B455 + (17:19:14, 7 January 2025)
- ML17341B452 + (17:19:14, 7 January 2025)
- L-82-462, Forwards Fee for Payment of Proposed License Amend Re Degraded Grid Voltage + (17:19:15, 7 January 2025)
- L-82-460, Forwards Class I & III Fees for Proposed License Amend Re Radiological Effluent Tech Specs + (17:19:17, 7 January 2025)
- L-82-461, Forwards Check in Payment of Proposed License Amend Turbine Runback Sys, Representing Class I & Class III Amend + (17:19:22, 7 January 2025)
- ML17341B447 + (17:19:27, 7 January 2025)
- L-82-456, Forwards Revised Pump & Valve Inservice Test Program for Unit 3,applicable for 821214 to 921214.Revised Inservice Test Program for Unit 4 Will Be Submitted by 830307 + (17:19:28, 7 January 2025)
- ML17341B444 + (17:19:30, 7 January 2025)
- ML17341B442 + (17:19:35, 7 January 2025)
- L-82-452, Forwards Revision 1 to 10CFR50 App R Fire Protection Review. Revision Corrects Typographical Errors in 820701 Submittal + (17:19:39, 7 January 2025)
- ML17341B440 + (17:19:39, 7 January 2025)
- L-82-451, Forwards Util Containing Payment of License Amend Fee Re Redundancy in RHR Sys Requested in NRC + (17:19:41, 7 January 2025)
- L-82-445, Advises That Procedures/Plans Submitted for Unit 3 for Steam Generator Repair Project Apply to Unit 4 & Need Not Be Resubmitted + (17:19:43, 7 January 2025)