ML17341B526

From kanterella
Jump to navigation Jump to search
Forwards Safety & Technical Evaluations for Environ Qualification of safety-related Electrical Equipment. Reaffirmation of Justification for Continued Operation & Info Re Categories I.B,Ii.A & Ii.B Requested
ML17341B526
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/13/1982
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341B527 List:
References
NUDOCS 8212290534
Download: ML17341B526 (5)


Text

~ )j

. ~ 1 v

Docket Hos.

50-250 an

-251 co

e. c c Fcvc 9,~.

1JOCS Id:a.

We,Z.(Z,~ C,g~

Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light.Company Post Office Box 529100 Miami, Florida 33152

Dear Dr. Uhrig:

DISTRIBUTION w '.losure 1

Doc et File NRC PDR

'.~/ <<~~

Local PDR C~/ >

> gg.

ORB 1 File D. Eisenhut E. L. Jordan OELD D. McDonald C. Parrish NSIC J.

M. Taylor ACRS (10)

J.

Heltemes

. C. i WlglT1111Zl/

g, Ct'VO

SUBJECT:

SAFETY EVALUATION FOR ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT RE:

Turkey Point Plant, Units 3. and 4 This letter transmits the Safety Evaluation for the Environmental Qualification of Safety-Related Electrical Equipment at your facilities.

This evaluation is based on your response to our previous Safety Evaluation, dated hlay 21, 1981, and subsequent submittals dated August 27, 1981, September 14, 1981, February 9,

1982, and March 24, 1982.

The Safety Evaluation presents the results of the Environmental Qualification Review for safety-related electrical equipment, exposed to a harsh environment, in accordance with NRC requirements.

lie request that you provide your plans for qualification or replacement of the equipment in NRC categories I.B, II.A and IIBB.(presented in the Technical Evaluation Reports) and.the schedule for 'accomplishing your proposed corrective actions to us within ninety (90) days of the receipt of this letter.

,As indicated in the conclusion section of the Safety Evaluation, we request that yoti reaffirm the justification for continued operation and within thirty (30) days of receipt of this letter, submit information for items in NRC categories I.B, II.A and II.B (presented in the enclosed Technical Evaluation Report) for which justification for continued operation was not previously submitted to the 4RC.

1le suggest that the clarification set forth in item 8 of Generic Letter No. 82-09, "Clarification Questions and Answers on Environmental Qualification Requirements,"

should be considered in you )ustification for continued operation.

The Technical Evaluation Reports contain certain identified information which you have previously claimed to be proprietary.

Me request that you inform us as indicated in the proprietary review section of the Safety Evaluation whether any portions of the identified pages still require proprietary protection.

=-As stated in the Safety Evaluation, the staff is continuing to review your

. environmental qualification program and will be available, at your option, to discuss the fin'dings in the-enclosed SE and TERs.

Your submittal dated September 24, 1982, has not been included in the staff's review to date.

OFFICES SURNAME/

~ ~ ~ ~ LI0C 41')

)

0 ~ ~

~ ~ ~ ~ ooo

~ ~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ eo N$ ASCAd-Cop

~ R 0 ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ 0 ~ ~ ~ ~

P NRC FORM 318 (10.80) NRCM 0240 8212290534 S2i2i3 DATEy -.

PDR ADOCK 05000250 PDR

~

0 ~ I~

1 s~tAL RECORD COPY UBGPG: 1&BI~960

Dr. Robert E.

Uhr ig

-200

~<1

~ u 10OP.

guestions regarding this safety evaluation, the findings and actions required should be directed through the HRC Project Manager for Turkey Point Plant, Units 3 and 4.

This letter affects fewer than ten respondents; therefore, ONB clearance is not required under P.L.96-511.

Sincerely, eriS~nhl S~Sned bV-

g. p..VarS>

Steven A. Varga, CHief Operating Reactors Branch tto.

1 Division of Licensing

Enclosures:

1.

Safety Evaluation 2.

Technical Evaluation Reports cc >I/enclosure 1:

See next page OFFICES SURNAME/

Io DATEj ORB'1

"[Pic q"

~I~ ~ ~ ~ ~

~ \\ ~ 0 ~

~.].R(Y.B2......

0 ~

~I~

~I~I

~I~

'a

~I~I~I ~ ~ OHIO ~ 00 ~I ~I~ ~I ~

~ ~ ~I ~I ~ ~ ~ 00 ~I~ ~ ~ ~ ~ ~I ~ ~ ~ ~

~I~I~ ~ ~ ~ ~ ~ ~ ~I~I~I~I~I~ ~I

~I~I~I ~ ~I~I~ ~ ~I~ ~ ~I ~I ~ ~ ~

~ ~

~ ~

~ ~

hVraootoo

~ ~I~ ~ ~ ~ ~I ~ ~I~ 0 ~I ~ ~ ~ ~ ~ ~I~

~ ~I~I~I~ ~ ~I~Ottt ~ ~I~ ~I~ ~

~ 0 ~ ~ ~ 0 ~I~\\ ~ ~ 0 ~ 0 ~I~ 0 ~I~\\ ~

~ 0 ~ OttO ~ ~ ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ OHIO

~ 00 ~ 0 ~ ~ ~ ~ 0 ~ 00 ~ 0 ~ 0 ~ 0 ~ 00 ~ ~

~I~ ~ ~ ~ ~ 0 ~ ~ ~ ~I~I ~I~I~ttt ~

~

~ 0 ~I~I~ ~ 0 ~ 0 ~I~ 00 ~\\ ~ ~I~

~ 0 ~ ~ 0 ~ ~ 0 ~ \\ ~ 0 ~ I BIFID

~ 0 ~ 0

~I ~ ~Ittt~I ~I~I~I~I~I~I~ ~

~ ~ ~ ~I~I~ ~ ~I~ 00 ~I~ ~ ~I~ ~I~

~I~I~I~ ~ 00 ~ ~I~I~ ~I~ ~ ~ ~I~

RRC FORM 318 u0.80) NRCM 0240 OFFlClAL RECORD COPY USGPO: '1SS1~SSO

Robert E. Uhrig Florida Power and Light Compan'y CC:

Harold F. Reis, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut

Avenue, N.M.

Suite 1214 Washington, D.

C.

20036 James P. O'Reilly Regional Administrator - Region I1 U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303 I(

Norman A. Coll, Esquire

Steel, Hector and Davis.

1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0; Box 013100 Miami, Florida 33101

, "Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator

'~~ Department of Environmental Reg'ul ation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee,'lorida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030

~

~