Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-87-392, Forwards Comments on NRC Salp.Plant Operations,Radiological Controls,Maint,Security & Safeguards,Outages,Training & Qualification Effectiveness & Engineering Support Addressed + (16:58:46, 7 January 2025)
- ML17342A922 + (16:58:48, 7 January 2025)
- ML17342A921 + (16:58:50, 7 January 2025)
- ML17342A920 + (16:58:51, 7 January 2025)
- ML17342A918 + (16:58:52, 7 January 2025)
- ML17342A917 + (16:58:53, 7 January 2025)
- ML17342A916 + (16:58:54, 7 January 2025)
- L-87-387, Forwards Select Sys Assessment Progress Summary for Aug 1987 + (16:59:01, 7 January 2025)
- L-87-386, Forwards Response to NRC 870818 Request for Addl Info Re Util Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings + (16:59:06, 7 January 2025)
- ML17342A911 + (16:59:11, 7 January 2025)
- L-87-380, Forwards Response to Generic Ltr 87-12.Util Requested Westinghouse Owners Group to Evaluate Time Response for Loss of RHR W/Estimates of Potential Core Damage & Radioactive Releases.Info Will Be Provided When Available + (16:59:12, 7 January 2025)
- ML17342A907 + (16:59:18, 7 January 2025)
- ML17342A906 + (16:59:20, 7 January 2025)
- ML17342A904 + (16:59:22, 7 January 2025)
- IR 05000250/1987032 + (16:59:24, 7 January 2025)
- L-87-373, Forwards Response to NRC Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. All Piping Inspected for Wall Thinning Designed & Fabricated in Accordance W/Ansi B31.1 + (16:59:25, 7 January 2025)
- ML17342A897 + (16:59:30, 7 January 2025)
- ML17342A895 + (16:59:32, 7 January 2025)
- ML17342A894 + (16:59:33, 7 January 2025)
- L-87-372, Special Rept:On 860930 & 1001,schedular Exemptions for Safe Shutdown Mods Expired Due to Large Number of Mods Being Performed.Plant Continues to Implement Compensatory Measures as Applicable.Rept Will Be Updated on 30-day Basis + (16:59:34, 7 January 2025)
- L-87-371, Responds to Violations Noted in Insp Repts 50-250/87-33 & 50-251/87-33.Corrective Actions:Reducer & Branch Line to Isolation Valves & Steam Trap Socolet Replaced & Procedure ONOP-12308.2 Re Power Range Nuclear Instrumentation Updated + (16:59:37, 7 January 2025)
- ML17342A891 + (16:59:42, 7 January 2025)
- 05000250/LER-1987-022, :on 870731,operator Demonstrated Known Spurious & Spiking Problem in Nuclear Instrumentation Sys Intermediate Range Channels,By Opening Drawer for Sys. Caused by Faulty Locking mechanism.W/870831 1tr + (16:59:46, 7 January 2025)
- L-87-361, Semiannual Radioactive Effluent Release Rept Jan-June 1987 + (16:59:48, 7 January 2025)
- 05000251/LER-1987-021-01, :on 870729,process Radiation Monitor Spiked High Actuating Containment Vent & Control Room Ventilation Isolation Logic.Caused by Work Being Performed on Condenser Air Ejector Radiation Monitor.Drawer Reset + (16:59:52, 7 January 2025)
- ML17342A886 + (16:59:54, 7 January 2025)
- L-87-363, Advises That at Time of Next Blackness Testing & Surveillance of Boraflex Max Fuel Enrichment Will Be Less than 4.1%.Util Will Not Store Fuel W/Enrichment Greater than 4.1% Prior to Surveillance + (16:59:55, 7 January 2025)
- ML17342A884 + (16:59:55, 7 January 2025)
- L-87-355, Responds to NRC 870609 Request for Addl Info Re Use of Boraflex in Spent Fuel Storage Racks.Results of Blackness Testing of Boraflex Panels Did Not Indicate Existence of Gaps,Voids or Other Spatial Distribution Anomalies + (16:59:58, 7 January 2025)
- 05000251/LER-1987-020-01, :on 870728,discovered That Steam Generator 4A Feedwater Flow Control Valve Actuator Stem Not Properly Engaged W/Control Valve Stem.Caused by Improperly Matched Coupler Halves.Set Screw Inserted Into Block + (17:00:02, 7 January 2025)
- L-87-357, Responds to Violations Noted in Insp Repts 50-250/87-32 & 50-251/87-32.Corrective Actions:Steps Taken to Assure That Operators in Compliance Prior to Assuming Shift Duties & Operators Will Be Scheduled to Rept to Training Bldg + (17:00:04, 7 January 2025)
- NUREG/CR-4982, Board Notification 87-013:forwards Final NUREG/CR-4982, Severe Accidents in Spent Fuel Pools in Support of Generic Issue 82, Per Commitment of 870327 Board Notification 87-005.W/o Encl + (17:00:07, 7 January 2025)
- 05000251/LER-1987-014, :on 870711,water Dripping from Auxiliary Feedwater(Afw) Steam Line Discovered & on 870717,AFW Train 1 Declared Inoperable.Cause of Leak Unknown.Affected Piping & Fitting Replaced + (17:00:13, 7 January 2025)
- L-87-346, Forwards Jul 1987 Summary Progress Rept of Select Sys Assessment + (17:00:15, 7 January 2025)
- ML17342A874 + (17:00:18, 7 January 2025)
- ML17342A873 + (17:00:20, 7 January 2025)
- ML17342A872 + (17:00:21, 7 January 2025)
- L-87-350, Responds to NRC Re Violations Noted in Insp Repts 50-250/87-14 & 50-251/87-16.Corrective Actions:Containment Leaks Will Be Inspected & Documented for Evaluation & Safety Review Enhancements Performed.Civil Penalty Payment Encl + (17:00:22, 7 January 2025)
- L-87-336, Advises That Westinghouse Has Informed Util of Input Error Where Three high-head Safety Injection Pumps Assumed in Large Break LOCA Analysis.Licensee Evaluating Design Changes to Mitigate Increases in Peak Clad Temps + (17:00:24, 7 January 2025)
- L-87-341, Responds to Violations Noted in Insp Repts 50-250/87-27 & 50-251/87-27.Corrective Actions:Surveillance Procedures Which Address Tech Spec Required Surveillances Reviewed & No Other Similar Cases Found.Test Schedule Changed + (17:00:28, 7 January 2025)
- L-87-340, Supplemental Special Rept:Updates Fire Protection Sys Impairments Requiring NRC Notification for Which No Details Available at Time of 870807 Rept + (17:00:30, 7 January 2025)
- 05000251/LER-1987-015-01, :on 870715,technicians Failed to Deactivate Inoperable Containment Isolation Valve within 4 H as Required by Tech Specs.Caused by Personnel Error.Procedure Completion Responsibility Centralized + (17:00:35, 7 January 2025)
- 05000251/LER-1987-016-01, :on 870715,automatic Actuation of Intake Cooling Water Pump Occurred.Caused by Ground on Pump Motor. Pump Replaced & Satisfactorily Tested + (17:00:38, 7 January 2025)
- 05000251/LER-1987-012, :on 870705,component Cooling Water (CCW) Pump Auto Started During Engineered Safeguards Integrated Test Due to Low Header Pressure Upon Increased CCW Flow. Integrated Test Revised + (17:00:41, 7 January 2025)
- 05000251/LER-1987-017-01, :on 870715,inadvertent Isolation of Auxiliary Feedwater Nitrogen Backup Sys Occurred.Caused by Personnel Error (Not Following Procedures).Sys Realigned to Proper Configuration Using Procedure 4-OP-065.2 + (17:00:44, 7 January 2025)
- 05000251/LER-1987-014-01, :on 870711,dripping from Auxiliary Feedwater Steam Line Discovered.On 870714,leak Identified as Pinhole on Reducer.Cause Unknown.Fitting & Portion of Adjacent Piping Removed for Analysis + (17:00:55, 7 January 2025)
- IR 05000250/1987024 + (17:00:57, 7 January 2025)
- ML17342A855 + (17:01:01, 7 January 2025)
- ML17342A854 + (17:01:03, 7 January 2025)
- ML17342A853 + (17:01:04, 7 January 2025)
- ML17342A851 + (17:01:06, 7 January 2025)