Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 87092'BOO'P4
-
DOC. DATE: 87/O'P/24
NOTARIZED:
NO
DOCKET
FACIL: 50-250 Turkey Point Plant.
Unit 3i Florida Power
and Light
C
05000250
50-251
Turkey Point Planti
Unit 4I Florida Power
and Light
C
05000251
AUTH. NAME
AUTHOR AFFILIATION
RACEr J. N.
Region
24 Office of Director
RECIP. NAME
RECIPIENT AFFILIATION
WOODY'. O.
Florida Power
5 Light Co.
SUBJECT:
Forwar ds partially withheld Insp Repts
50-250/87-38
h
50-251/87-38
on 870824-28. Violations noted. Violations under
consideration
for escalated
enforcement
action. Issues will
be discussed
during 871009 enforcement
conference.
DISTRIBUTION CODE:
IE04D
COPIES
RECEIVED: LTR 2 ENCL J
SIZE:
TITLE: Safeguards
Inspection
Rpt/NOV Response
(50 DKT)-Publiclg Available
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
LA
McDONALDID
COPIES
LTTR ENCL
1
0
1
RECIPIENT
ID CODE/NAME
PD2-2
COPIES
LTTR ENCL
1
INTERNAL: AEOD/DOA
N
DRIS/SIB
REG FILE
02
1,
0
1
1
NRR/DR IS/SGB
'RR/PMAS/ILRB
RGN2
FILE
01
1
1
1
0
1
1
EXTERNAL:
LPDR
1
1
1
1
NRC
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
12
ENCL
Cl
SAFEGUARDS INFORMATION
Eppes
(gg
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Mr. C. 0.
Woody
Group Vice President
'uclear
Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-250/87-38
AND 50-251/87-38
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
Mr. D. Thompson
on
August 24-28,
1987.
The inspection
included
a review of
activities authorized for your Turkey Point facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews
wi'th personnel,
and
observation
of
activities in progress.
The violations described
in the enclosed
inspection report are currently under
consideration
for escalated
enforcement
action.
Accordingly,
no Notice of
Violation is
being
issued
at this
time
and
no
response
to this letter is
required.
Please
be
advised
that
the
number
and characterization
of the
violations
may change
as
a result of further
NRC review.
These
issues will be
discussed
during the Enforcement
Conference
which is scheduled
for October 9,
1987.
In accordance
with 10 CFR 2.790(d)
and
safeguards
activities and
security measures
are
exempt
from public disclosure;
therefore,
the enclosure
to this letter, with the exception
of the report cover
page which presents
a
nonexempt
summary, will not be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
8709290094
870924
ADQCK 05000250
J
~ Nelson Grace
Regional Administrator
ENOLOSUM CONTAINS
SAFECUARVS INFORHATI0%
AFEGUAROS IgFORMATIOg
~~~,; .;,';;
SAFEGUARDS tNFORMATION
SEP 24 f987
Florida Power and Light Company
Enclosure:
NRC Inspection
Report
(Safeguards
Information)
cc w/encl:
J.
S.
Odom, Vice President
Turkey Point Nuclear Plant
C. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
QA Superintendent
J. Arias, Jr.
Regulatory
and Compliance
Supervisor
bcc w/encl:
NRR/DRIS/SB
bcc w/Inspection
Summary:
NRC Resident
Inspector
Document Control Desk,
016
'State of Florida
0
R IIg
CPerny: tj
9/pl'/87
RII
ilson
9/~'~/87
RII
DTh
pson
9/;~/87
D c uire
9/2-/87
W line
9Q~/87
RII
RI
'%P 9
DVer relli
Reyes
G en ins
9/n f87
9/~/97
9'/97
SAFE'uUARDS INFORMAT!Q,',r
RI
JS
hr
9 +87
ENCLOSURE COÃTAINs
SAFEGV~S Smoau
T>
N ON SEPamtrox
T:.I ~;
RII
"A<E IS
DECONTa~o'nst
9/7 987
i