L-87-387, Forwards Select Sys Assessment Progress Summary for Aug 1987

From kanterella
Jump to navigation Jump to search
Forwards Select Sys Assessment Progress Summary for Aug 1987
ML17342A915
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/21/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-387, NUDOCS 8709250295
Download: ML17342A915 (6)


Text

REGULATORY FORMATION DISTRIBUTION SY

=M <RIDS)

~ I ACCESSION NBR: S709250295 DOC. DATE: 87/09/21 NOTARIZED:

NO FACIL: 50-250 Turkey Point Planti Unit 3I Florida Poeer and Light C 50-251 Turkey Point Planti Unit 4I Florida Power and Light C AUTH. NAME AUTHOR AFFILIATION NOODYI C. O.

Florida Poeer 8c Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document ContYol Branch (Document Control Desk>

SUBJECT:

ForuJards select sos assessment progress summary for Aug 1987.

DISTRIBUTION CODE:

  • OOID COPIES RECEIVED: LTR J ENCL g SIZE: 3 TITLE:

OR Submittal:

Qeneral Distribution DOCKET 0 05000250 05000251 NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA McDONALDz D COPIES LTTR ENCL 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5

5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB NRR/

AS/ILRB I

01 EXTERNAL:

EQSQ BRUSKE> S NRC PDR 1

0 1

1 1

1 1

1 1

1 1

NRR/DEST/ADS NRR/DEST/MTB NRR/DOEA/TSB OQC/HDS2 RES/DE/EIB LPDR NSIC 1

1 1

1 1

0 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 18

f+4 1I

P. O. Bo "000, JUNO BEACH, FL 33408-0420

+i)wi SEPTEMBER 2 i 1987 L-87-387 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Select S stem Assessment Pro ress Summar Attached please find the August l987 progress summary of the Select System Assessment.

If you have any questions regarding this information, please contact us.

Very truly yours,

.O. Wo y

Group Vice President Nuclear Energy COW/RG/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8709250295 87092 PDR ADQCK 050 R

P R

RG3/008/ I (gal'li an FPL Group company

I WK I

4 I

~

~

ill Ijl W

I 4

I vJ WRIER I'

I W

I II gl W

I 4

I I

I(

WI ~

4W W ~

IW4 I.

9 I

~

~

-I

'I I

4 II '

jW

-4 I

~ 4 e l

SELECT SYSTEM REVIEW AUGUST 1987 PROGRESS Safet En ineerin Grou (SEG) Review The SEG has commenced its closeout review of Unit 3 Select Systems.

The closeout report is expected to be completed on time, within sixty days following the end of the current Unit 3 outage.

Confi ration Mana ement Efforts to identify and update affected drawings resulting from the implementation of select system modifications (reference L-86-527) has commenced.

This effort is expected to be completed on time, within one-hundred and twenty days following the end of the current Unit 3 outage.

Other Si ificant Pro ress Implemented Component Cooling Water (CCW) heat exchanger cathodic protection electrical modifications Added instrument taps on CCW heat exchanger outlet Closed approximately thirty nonconformance reports (NCR's) on CCW (details available on request)

Revised CCW procedure 3/4-0SP-30.5 Reviewed INFO SOER 84-7 re:

Pressure locking and thermal binding of gate valves Revised Emergency Containment Coolers (ECC) procedure 3/4 EOP-ECA-0.2 Repaired ECC bypass control valve condulets Calibrated local ECC pressure indicators Developed DC switchgear criteria for inspection, testing and servicing