ML17342A873
| ML17342A873 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/20/1987 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8708270224 | |
| Download: ML17342A873 (2) | |
See also: IR 05000250/1987033
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8708270224
DOC. DATE: 87/08/20
NOTARIZED:
NO
DOCKET 0
ACIL: 50-250 Turkey Point PlantI
Unit 3I Florida Power
and Light C
05000250
50-251
Turkey Point
Plant'nit 4I Florida Power
and Light C
05000251
AUTH. NAME
AUTHOR AFFILIATION
REYESI L. A.
Region
2I Office of Director
REC IP. NAME
RECIPIENT AFFILIATION
MOODYI C. O.
Florida Power
& Light Co.
SUBJECT:
Informs of error re nitrogen hottle alignments
in Paragraph
10 to Insp Repts
50-250/87-33
8c 50-251/87-33. Error does not
affect rept findings.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTRj ENCL ZO SIZE:
TITLE: General
(50 Dkt)-Insp, Rept/Notice of Violation Response
NOTES:
REC IP IENT
ID CODE/NAME
PD2-2
INTERNAL: *EOD
MOR ISSEAUI D
NRR/DREP/EPB
NRR/DRIS DIR
EBE
ANI J
REG F
FILE
01
TERNAL:
LPDR
COPIES
LTTR ENCL
11'
1
1
REC IP IENT
ID CODE/NAME
McDONALDID
DEDRO
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ILRB
OGC/HDS2
DEPY GI
NRC
COPIES
LTTR ENCL
1
1
2
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
Docket Nos.
50-250 and 50-251
License
Nos.
Fl~ida Power and Light Company
~TN:
Mr.
C.= 0.
Woody
Group Vice President
Nuclear Energy Department
P.
0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
CORRECTION
TO REPORT
NO. 50-250/87"33
AND 50-251/87-33
An error
has
been
found in paragraph
10 (pages
18 and
19) of the subject
report.
The
Turbine Operator's
log readings
taken
on July 15,
1987,
were
initiated at 5:00 p.m.
as required
by procedure.
However,
due to the length of
the logging activity, the auxiliary feedwater nitrogen bottle readings
were not
obtained
until
approximately
7:30
p.m.
The
discrepant
nitrogen bottle-
alignments
were identified at approximately
7:30
p.m.
on July 15,
1987.
The
Turbine Operator
who identified the
misalignment expeditiously
brought the
issue to the attention of his supervisors.
The Turbine Operator identified the
discrepancy
while taking his
5: 00 p.m.
log readings,
not his
9: 00 p. m.
log
readings.
This error
does
not affect
any of the findings of the report.
We
regret
any inconvenience it may have caused
you.
Sincerely,
(Original signed
by V. Brownlee)
Luis A. Reyes,
Director
Division of Reactor Projects
cc:~
S.
Odom, Vice President
Turkey Point Nuclear Plant
~ J.
Baker, Plant Manager
Turkey Point Nuclear Plant
~ W. Bladow, Plant
gA Superintendent
~J
Arias; Jr.,
Regulatory
and Compliance
Supervisor
bcc:
PKC Resident
Inspector
Document Control
Desk
State of Florida
RII,
HC ristens
n:vyg
87Omzome
870mo
ADOCK 05000250
Q
RII
RII
VBrow
ee
IH