Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A353 + (16:43:32, 7 January 2025)
- L-88-383, Special Rept:On 880826,nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days, in Accordance W/Tech Spec 3.14.5.b.Addl Corrective Actions Initiated & Compensatory Measures Implemented as Applicable + (16:43:33, 7 January 2025)
- L-88-384, Responds to Violations Noted in Insp Repts 50-250/88-11 & 50-251/88-11.Corrective Actions:Chemistry Dept Training Program Revised to Include Addl Instruction on Procedure Usage + (16:43:35, 7 January 2025)
- L-88-367, Semiannual Radioactive Effluent Release Rept,Jan-June 1988 + (16:43:41, 7 January 2025)
- L-88-365, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-250/88-16 & 50-251/88-16.Corrective Actions:Draft of Ltr of Instruction for Security Plan Changes Prepared for Review & Comment + (16:43:46, 7 January 2025)
- ML17345A347 + (16:43:49, 7 January 2025)
- IR 05000250/1988019 + (16:44:03, 7 January 2025)
- ML17345A344 + (16:44:06, 7 January 2025)
- L-88-350, Forwards Results of NRC Confirmatory Measurements Program Samples,Per 880421 Request + (16:44:07, 7 January 2025)
- L-88-371, Forwards Summary of Ref Matl Supplied to Region II for Operator Exams,Per Request + (16:44:10, 7 January 2025)
- PNO-II-88-050A, on 880816,spent Fuel Pit Cooling Sys Pump Failed Resulting in Unplanned Spilling of Some 3,100 Gallons of Spent Fuel Pit Water at Plant.Backup Pump Installed.Util Continuing Work to Decontaminate HX Room + (16:44:15, 7 January 2025)
- L-88-359, Forwards Summary Rept of Integrated Schedule for Aug 1988, Reflecting Info as of 880819,including New Outage Completion Date for Unit 4,Cycle 12.Next 6-month Rept Will Be Issued Following Nov 1988 Schedule + (16:44:16, 7 January 2025)
- L-88-339, Forwards mgt-on-shift Weekly Summary Rept for Wk Starting 880729.Plant Supervisor Nuclear Shift Repts Also Submitted + (16:44:19, 7 January 2025)
- PNO-II-88-050, on 880816,approx 3,100 Gallons of Slightly Radioactive Water Released from Spent Fuel Pit by Vent Valve on Failed Pump.Cause Under Investigation.Hourly Sampling Underway.Sandbags Placed Around Spill Areas + (16:44:22, 7 January 2025)
- ML17345A336 + (16:44:23, 7 January 2025)
- ML17345A335 + (16:44:25, 7 January 2025)
- TAC:68954 + (16:44:26, 7 January 2025)
- ML17345A334 + (16:44:29, 7 January 2025)
- ML17345A333 + (16:44:30, 7 January 2025)
- TAC:65038 + (16:44:31, 7 January 2025)
- L-88-338, Discusses Schedule for Submittal of Proof & Review Tech Specs.Comments Expected by 880923 + (16:44:35, 7 January 2025)
- IR 05000250/1988017 + (16:44:40, 7 January 2025)
- ML17345A328 + (16:44:42, 7 January 2025)
- 05000251/LER-1988-006-01, :on 880716,containment Ventilation & Control Room Ventilation Sys Isolation Occurred.Caused by Very Conservative Setpoint for R-11 Actuation.Unit Removed from Operation & Temporary Repair Effected + (16:44:44, 7 January 2025)
- ML17345A325 + (16:44:45, 7 January 2025)
- ML17345A324 + (16:44:46, 7 January 2025)
- L-88-351, Forwards Monthly Operating Repts for Jul 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (16:44:47, 7 January 2025)
- L-88-340, Forwards Jul 1988 Progress Summary of Select Sys Assessment Re Design Basis Reconstitution,Safety Engineering Group, Walkdowns & Other Significant Progress + (16:44:49, 7 January 2025)
- 05000250/LER-1988-014, :on 880714,RCS Leakage Surveillance Not Performed within Required Interval Due to Personnel Error. Note Placed in Night Book Stressing Need to Meet 18-30 H Tech Specs Requirements + (16:44:53, 7 January 2025)
- ML17345A315 + (16:44:54, 7 January 2025)
- ML17345A314 + (16:44:56, 7 January 2025)
- ML17345A313 + (16:44:57, 7 January 2025)
- ML17345A311 + (16:44:58, 7 January 2025)
- ML17345A310 + (16:44:59, 7 January 2025)
- ML17345A309 + (16:45:00, 7 January 2025)
- ML17345A308 + (16:45:01, 7 January 2025)
- L-88-331, Special rept:18-month Surveillance Identified Fire Barriers & Penetrations W/Observable Deterioration Since Last Surveillance.Caused by Stated Work Re Field Repts & Equipment Malfunction.Compensatory Measures Continuing + (16:45:03, 7 January 2025)
- ML17345A306 + (16:45:03, 7 January 2025)
- L-88-336, Special Rept:On 880701,one Surveillance Tendon of Horizontal Tendon Group Found to Have Measured lift-off Force Below Predicted value.Lift-off Forces in Tendons 13H49,13H50 & 13H51 Have Been Restored to Predicted Lower Values + (16:45:05, 7 January 2025)
- L-88-335, Special Rept:On 880721,discovered That Ultimate Strength of Vertical Tendom Wire Below Min Specified Value of 240,000 Psi by Approx 1%.Plant Entered Action Statement Requiring Restoration of Containment Vessel to Required Level + (16:45:08, 7 January 2025)
- ML17345A300 + (16:45:10, 7 January 2025)
- L-88-316, Informs That Util in Process of Upgrading Emergency Response Data Acquisition & Display Sys (Erdads).Erdads Computers Used to Collect & Display SPDS & Safety Assessment Sys Info + (16:45:11, 7 January 2025)
- ML17345A298 + (16:45:19, 7 January 2025)
- L-88-321, Responds to Violations Noted in Inps Repts 50-250/88-01 & 50-251/88-01.Corrective Actions:Training Brief Issued to Promulgate Acceptable Method for Averaging Meteorological Data + (16:45:20, 7 January 2025)
- L-88-299, Forwards Summary of mgt-on-shift Repts for 880704-08,per NRC 871019 Order.Change Discussed & Concurred W/By Region II Staff + (16:45:23, 7 January 2025)
- ML17345A295 + (16:45:27, 7 January 2025)
- L-88-306, Discusses Performance Enhancement Program Project 4 Task 11.20 Re Upgraded RHR Valve 887.Design & Procurement of Upgraded Valve Has to Be Revised as Result of Analysis + (16:45:28, 7 January 2025)
- L-88-315, Forwards Integrated Schedule Monthly Summary for Jul 1988, Including New Outage Completion Date for Unit 4 - Cycle 12 + (16:45:30, 7 January 2025)
- ML17345A291 + (16:45:33, 7 January 2025)
- NRC-17-0082, Price-Anderson Act Guarantee of Payment of Deferred Premiums + (16:45:34, 7 January 2025)
- ML17345A289 + (16:45:37, 7 January 2025)