Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-221, Confirms Commitment to Advise of Any Final Changes to NPDES Permit & Any Permit Violations + (16:26:10, 7 January 2025)
- L-83-224, Forwards Dp Hodel Certifying That Util Is Actively & in Good Faith Negotiating W/Doe for Nuclear Waste Disposal Contract Per Requirement of Nuclear Waste Policy Act of 1982 + (16:26:11, 7 January 2025)
- L-83-226, Responds to 830331 Request for Relief from Operability Dates for NUREG-0737, Items II.F.1.2, Air Ejector Effluent Monitor & II.F.1.6, Containment Hydrogen Monitor. Completion for Both Items Expected by 840515 + (16:26:13, 7 January 2025)
- L-83-223, Commits to Test All Affected Equipment & Perform Surveillances Required by Tech Specs,Per ,During Steam Generator Repair Outage Prior to Fuel Reload + (16:26:15, 7 January 2025)
- L-83-225, Forwards Revised Fuel Protection Review, Including Request for Exemptions from App R + (16:26:17, 7 January 2025)
- ML17345B039 + (16:26:19, 7 January 2025)
- ML17345B037 + (16:26:21, 7 January 2025)
- L-83-194, Ack Receipt of Re Blocking of Steam Line High Differential Pressure Safety Injection Signal During Cooldown.Response Will Be Provided by 830419 + (16:26:22, 7 January 2025)
- ML17345B035 + (16:26:22, 7 January 2025)
- L-83-208, Requests Relief from Commitment Dates in 830314 Order Re Resolution of TMI Items II.F.1.2, Air Ejector Effluent Monitor, & II.F.1.6, Containment Hydrogen Monitors. Request Based on Unsuccessful Preoperational Testing + (16:26:25, 7 January 2025)
- L-83-188, Confirms Agreement Re Conformance W/Schedule Required by Final Rule 10CFR50.49,in Response to NRC 821213 Request Concerning Environ Qualification of safety-related Electrical Equipment + (16:26:27, 7 January 2025)
- L-83-179, Forwards Corrected Pages from Util Re Adequacy of Station Electric Distribution Sys Voltages Covering ESF Setpoints + (16:26:29, 7 January 2025)
- L-83-180, Forwards Info Presented at 830126 Meeting Re Plans & Schedules to Resolve Pressurized Thermal Shock at Facilities,In Response to NRC 830201 Request.Util Plans to Focus Effort on Flux Reduction to Reactor Vessel Inner Wall + (16:26:31, 7 January 2025)
- ML17345B027 + (16:26:33, 7 January 2025)
- ML17345B026 + (16:26:34, 7 January 2025)
- ML17345B025 + (16:26:35, 7 January 2025)
- ML17345B024 + (16:26:36, 7 January 2025)
- L-83-162, Informs That Projected Operability Dates for Air Ejector Effluent Radiation Monitors of 830321 & 0915 Will Not Be Met.Progress Rept on Moisture Accumulation Problem Expected by 830601 + (16:26:38, 7 January 2025)
- ML17345B022 + (16:26:38, 7 January 2025)
- L-83-155, Forwards Corrected Page 3 to 830315 Submittal, Control of Heavy Loads, Technical Evaluation Rept + (16:26:49, 7 January 2025)
- ML17345B016 + (16:26:55, 7 January 2025)
- ML17345B014 + (16:26:56, 7 January 2025)
- ML17345B013 + (16:26:57, 7 January 2025)
- ML17345B011 + (16:26:58, 7 January 2025)
- L-83-146, Forwards Evaluation of Acceptability of Reactor Vessel Head Lift Rig,Reactor Vessel Internals Lift Rig,Load Cell,Load Cell Linkage & Reactor Coolant Pump Motor Lift Sling to Requirements of NUREG-0612, in Response to + (16:27:00, 7 January 2025)
- ML17345B006 + (16:27:02, 7 January 2025)
- ML17345B004 + (16:27:03, 7 January 2025)
- ML17345B005 + (16:27:03, 7 January 2025)
- ML17345B003 + (16:27:04, 7 January 2025)
- ML17345B002 + (16:27:05, 7 January 2025)
- ML17345B001 + (16:27:06, 7 January 2025)
- ML17345B000 + (16:27:06, 7 January 2025)
- ML17345A999 + (16:27:07, 7 January 2025)
- ML17345A998 + (16:27:10, 7 January 2025)
- ML17345A997 + (16:27:11, 7 January 2025)
- ML17345A996 + (16:27:13, 7 January 2025)
- ML17345A995 + (16:27:15, 7 January 2025)
- ML17345A994 + (16:27:16, 7 January 2025)
- L-83-135, Forwards Responses to Generic Ltr 82-28 Re Inadequate Core Cooling Instrumentation Sys for Facilities.W/Nine Oversize Drawings.Aperture Cards Are Available in PDR + (16:27:17, 7 January 2025)
- L-83-131, Advises of Withdrawal of Request for Exemption from Certain Requirements of 10CFR73.21,per .Facilities in Compliance W/Applicable Sections + (16:27:21, 7 January 2025)
- ML17345A990 + (16:27:24, 7 January 2025)
- L-83-136, Forwards Steam Generator Repair Program,Radiological Progress Rept 2 for 821203-830202 + (16:27:26, 7 January 2025)
- ML17345A989 + (16:27:26, 7 January 2025)
- L-83-126, Forwards Owners Data Repts for Inservice Insp (Form NIS-1) & Repairs/Replacement (Form NIS-2),per Provisions of ASME Code + (16:27:31, 7 January 2025)
- ML17345A984 + (16:27:31, 7 January 2025)
- ML17345A982 + (16:27:38, 7 January 2025)
- ML17345A981 + (16:27:40, 7 January 2025)
- L-83-120, Forwards Rev 1 to Containment Isolation/Purge Valve Analysis:48-Inch Ria W/Bettis Actuator & Rev 1 to Containment Isolation/Purge Valve Analysis:54-Inch Ria Valve W/Pratt 2 Plate Cylinder Operator + (16:27:42, 7 January 2025)
- ML17345A978 + (16:27:45, 7 January 2025)
- ML17345A976 + (16:27:46, 7 January 2025)
- L-83-121, Advises That 821117 Commitment to Install Debris Screens Withdrawn Pending Resolution of large-diameter Pratt Butterfly Valve Operability Concerns + (16:27:47, 7 January 2025)
- L-83-112, Forwards Justification for Continued Plant Operation W/Category Ii.B Electrical Equipment.Justifications for Equipment in Categories Ib & Iia to Be Completed by 830331 + (16:27:51, 7 January 2025)