. r Docket Nos. 50-250 and 50-251 S8 2g qg83 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company P. 0.
Box 14000 Juno Beach,,Florida 33408
Dear Dr. Uhrig:
0 INTRIBUTi Docket File NRC PDR Local PDR ORB 1 File D. Eisenhut OELD E. L. Jordan D. McDonald C. Parrrish NSIC J.
M. Taylor ACRS (10)
J.
Hel.temes FRC g ypotnlg
SUBJECT:
ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL
.EQUIPMENT - JUSTIFICATION FOR CONTINUED OPERATION FOR UNQUALIFIED EQUIPMENT AT TURKEY POINT UNITS 3 AND 4 By letter dated December 13, 1982, we provided our Safety Evaluation, including the Technical Evaluation Report (TER), for the Environmental Qualification of Safety-Related Electrical Equipment for Turkey Point Units 3 and 4.
We requested that you either reaffirm or provide justifi-cation for continued operation for those items identified in the TER as Categor ies I.B, II.A and II.B within thirty (30) days of receipt of the Safety Evaluation.
Your letter dated February 1, 1983, responded to our request indicating, with the exception of three Category II;A items, that your previous sub-mittals provided the necessary justification and was in accord with Appendix D of the TER.
However, as discussed with your staff, the conclusions in Appendix D were applicable while the staff and its contractor were performing the evaluation and may require a reassessment based on the final conclusions and categorization of the specific items.
Based on these dis-
- cussions, you have reassessed the Category II.B items and provided justifi-cation for continued operation in your letter dated March 1, 1983.
You further indicated that the items in the remaining categories are being reviewed and are expecting to complete the effort by March 31, 1983.
This schedule is acceptable to the staff.
We have reviewed the information provided for the Category II.B items in accordance with 10 CFR 60.49(i) which identifies the necessary elements to be considered for ensuring that a plant can be safely operated.pending qual-ification.or replacement of unqualified or questionable items.
Based on our review, we have co@eluded that;the justification for continued operation provides reasonable assurance that Turkey Point, Units 3 and 4, can be oppfated in a safe manner pending additional testing, replacement or other corrective actions. in accordance with the schedule provided in 10 CFR 50o49(g).
/.
'[he cenclosed Safety Evaluation provides the. details and basis for our coqcjlusion.
83040606i9 830329..
PDR ADOCK 05000250 Ol op PDR SURNAME/
~
~ ~ o ~
~ ~
~ oo ~ o ~ ~ o
~ ~ ~
,i DATE) o ~ ~ ~ ~ ~ ~ ~
oo
~
~
~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ ~ o ~
~
~
~ ~ ~ ~ ~ o ~
~ ~ ~
NRC FORM 818 (10-80) NRCM 0240 OFFICIAL RECORD COPY USG PO: 1981~060
~ ~
~ ~
~ '
S<
R
~ < ~
I '
S
<1 "s'a
~ <
ff
~
'll 5
ss
~ "R t ~ R,
~ A 1
4 R
~ <
~
~
I
~ RR
~ As R
~ R ~
~ S,i "
~
II
.s R
F F
II eked I
~ R II:RFS L fl
) ~i R ff ay ffs F 'F
<FF 'R S
Dr. Robert E. Uhrig Ng 28 ]ga Me have indicated to your staff that 10 CFR 50.49, "Environmental gualification of Electrical Equipment Important to Safety for Nuclear Power Plants,"
was issued on Janaury 21. 1983, subsequent to the issuing of the Safety Evaluation for Turkey Point Units 3 and 4.
A letter providing clarification and the impact the rule has on the electrical equipment qualification effort will be provided within a week.
This letter affects fewer than ten respondents; therefore, Of/B clearance is not required under P.L.96-511.
Sincerely, Q.+
Enclosure:
As stated cc w/enclosure:
See next page Steven A. Varga, Chief Operating Reactors Branch No.
1 Division of Licensing OFFICES SURNAMEi OATEI R5', 'd7ree
~ o ~
~ o ~ ~ o
~ ~ ~
~
3/
/83
~ ~ ~
~ o ~ e e ~ ~ o ~
~
~
~ ~ ~ ~ ~
0
~ ~ ~ ~ ~ ~ ~ ~
ZO
~ e ~
3
/83
~ ~ ~ \\ ~
~ o ~ ~ ~
~
~ o ~ oo ~ ~ ~ ~
EgB
-'VNo'o' 3/
/03
'OR:
GL as
~ ~ e ~ e ~
~ e ~ e ee ~\\ ~
/8
.....J.................
ORB SVarga
~ e ~ ~ ~ ~ o ~ ~
~ooooooo 3/
~ ~ oooo ooooo /eel)Oooo T
u4
~
~
~
~ o ~
~ o ~ ~ Oo oo ~
~ eo ~ o ~ ~ o ~
~ o ~ e ~ o ~ o ~
~ eeeofeoeooeoeooeooooo
~ e NRC FORM 318 (10-80) NRCM 0240 C)F ICIAL RECORD COPY USGP01 'l981~9fe0
0
~
~
(p
~
W
~
Robert E. Uhrig Florida Power and Light Company cc:
Harold F. Reis, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut
- Avenue, N.W.
Suite 1214 Washington, D. C.
20036 Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 j
Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.
Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department'f Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory, Commission Post Office Box 1207 Homestead, Florida 33030 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303
~ ~