h AA r
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 7590-01 In the Matter of FLORIDA POWER AND LIGHT COMPANY (Turkey Point Plant Units 3
8 4)
-)")
)
Docket Nos.
50-250 and 50-251 EXEMPTION The Florida Power and Light Company (the licensee) is the holder of Facility Operating License Nos.
DPR-31 and DPR-41 (the licenses) which authorizes operation of the Turkey Point Plant Units.3 and 4 located in Dade County, Florida, at steady state reactor core power lrevels not in I
excess of 2200 megawatts thermal (rated power).
These licenses
- provide, among other things, that they are subject to all rules, regulations and Orders of the Commission now or hereafter sn effect.
Section 50.71(e)(4) of 10 CFR Part 50 requires the licensees of nuclear power reactors to submit an annual revision to the Updated Final Safety Analysis Report*(UFSAR) which shall reflect all changes up to a maximum of six months prior to the date of. filing.
By letter dated February 2, 1983, Florida Power and Light Company (FP8L).
requested an Exemption from the requirements of 50.71(e)(4) for Turkey Point Plant Units, 3 and 4 for four months for the following reasons.
The current schedule for the annual update of July 22, 1983, would not include major modifications currently being implemented.
These major modifications include the steam generator replacement for Unit 4, Auxiliary Feedwater modifications h
ssooovos9i oooM+
1
A v
~ Jr 4
7590-01
'2-4 and modifications required as the result of the Three Mile Island Action Plan (NUREG-0737).
'The extension would facilitate the incorporation of the modifications identified above and accurately reflect the* existing
'I design.
Further, the licensee's technical support staff necessary for providing inputs to the FSAR are heavily engaged in the current modifi-cations.
'As a result, the licensee is requesting a four month schedular exemption for the current annual revision of the UFSAR.
The staff'as evaluated the licensee's request for a four month extension to the regulation that requires an annual revision to the UFSAR.
Me believe that the extension of time is warranted to permit incorporation of the major modifications and changes to accurately reflect the existing
~ design.
The staff has determined that good cause has been shown to support the exemption and, therefore, a four month exemption from the date of com-pliance is acceptable for this annual revision currently scheduled for July 22, 1983.
III.
Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12, the exemption requested by the licensee's letter of February 2, 1983, is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest.
Therefore, the Commission hereby approves the following exemption from compliance with the July 22, 1983 date for submitting the current annual revision to the UFSAR:
4~
4 I Jg
~\\
7590-01 The current annual revision of the UFSAR which reflects 'all changes up to a maximum of six months prior to the date of filing, shall be filed by November 22, 1983.
The next revision shall be filed no later than July 22, 1984, so that subsequent revisions will be in compliance with Section 50.71(e) of 10 CFR Part 50.
The NRC staff has determined that the granting of. this exemption will. not result in any 51.5(d)(4) an environmental this action.
significant environmental impact and that pursuant to 10 CFR environmental impact statement or negative declaration and impact appraisal need not be prepared in connection with Dated at Bethesda, Maryland this 16th day of March 1983 FOR THE NUCLEAR REGULATORY COMMISSION Robert A. Purple, Acting Director=
Division of Licensing Office of. Nuclear Reactor Regulation