ML17345B011

From kanterella
Jump to navigation Jump to search
Amends 93 & 87 to Licenses DPR-31 & DPR-41,respectively, Deleting App B ETS Re Nonradiological Water quality-related Requirements
ML17345B011
Person / Time
Site: Turkey Point  
(DPR-31-A-093, DPR-31-A-93, DPR-41-A-087, DPR-41-A-87)
Issue date: 03/11/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17345B012 List:
References
NUDOCS 8303230401
Download: ML17345B011 (17)


Text

'

Ir

~

~

yR RtgO

+~

Ot

~i UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO.

3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

93 License No.

DPR-31 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Florida Power and Light Company (the licensee) dated February 10, 1983, as supplemented by letter dated February 16, 1983, complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.. The facility will operate. in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E,

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

$ 8303230g0g 8303'~

PDR ADQCK 05000250 q P PDR I

It

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.

DPR-31 is hereby amended to read as follows:

(B)

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

93, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effecti ve as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

March ll, 1983 E

h' teven A.

Varga Operating Reactors B

nch gl Division of Licensing

gag RK00 vp O~

Cy A

Oo 0

r+

o'p**W UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO.

50-251 TURKEY POINT PLANT UNIT NO.

4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 87 License No.

DPR-41 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.,

C.

D.

The application for amendment by Florida Power and Light Company (the licensee) dated February 10, 1983, as supplemented by letter dated February 16, 1983,'omplies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate. in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied, 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License Ho.

DPR-41 is hereby amended to read as follows:

(B)

Technical S ecifications The Technical Specifications conta i ned in Ap~endi ces A and B, as revised through Amendment No. B~, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This

~license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COltNISSION 5L even g,

le Operating Reactors Br ch "1

Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

March ll, 1983

. ~

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO.

-3 TO FACILITY OPERATING LICENSE NO..

DPR-31'MENDMENT NO.

8" TO FACILITY OPERATING LICENSE 'NO.

DPR-41 DOCKET NOS.

50-250 AND 50-251 Revise Appendix A as follows:

Remove Pa es 3-1 3-2 4-1 4-2 4-3 Appendix 'B Table" of Contents Insert Pa es 3-1 3

2 4-1 4-2 4-3 Appendix 8 Table of Contents

THIS PAGE INTENTIONALLY LEFT BL'ANK Ont.t '3 Amendment No; 93 Unit 4 Amendment No.

87 3-1

THIS PAGE INTENTIONALLY LEFT 8LANK Gnat 3<:Amendment No.

93

'nit 4 Amendment No, 87 3-2

TMIS PAGE INTENTIONALLY LEFT BLANK Unit 3 Amendment No, 93

'nit 4 Amendment No, 87 4-l

THIS PAGE INTENTIONALLY LEFT BLANK 1

Unit 3 Amendment No.

93 Unit 4 Amendment No. 87 4-2

a

4.1.1.2 Groundwa er Pro ram bed ecti ve The purpose of this program is to evaluate the extent of salt water intrusion between the cooling canal system and the ground 'ster west of the canal system.

Specification This program shall involve monitoring of ~elis and surface pcints fc r temp rature, v ater level and conductivity (salinity).

The South Florida 1'ater 11anagement District (SFMI10) and the L~.S.G.S.

shall Cetermine the adequacy of the schedule and the con'tinued need fo'r this monitoring program.

Report'no lve u'rerients Su,,pries of the reports prepa red above sha 1 1 be submitted as part of the Annual Environmental e'loni toring Peport (Section 5.4.1).

4.2 4.2.1 Bases The long-tern effects of operating a salt water cooling system on the adjacent groundwater is useful.

l1onitoring the extent of salt water intrusion will provide Cata on this interaction.

Terres tria 1 E nvirohment Reveoetation of the Coolin Canal Banks

~0b 'ecti ves v

The purpose of this study is to assess the floristic species that colonize the mud spoil banks and their growth rates, created by constructing the cooling canals.

S ecification 4.2.1.1 This program shall analyze soils of the berms for pH, cloride content and selected nutrients.

Soil samples shall be taken at points

( 1) 'ust above the canal water level, (2) half-way-between the water and the top of the soil

bank, and (3)

.rom 4-3 Amendment No.

93 Amendment No. 87

pl

Section 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 le8 2.0 2.1 2.2 2.2.1 2.2.2 DEFINITIONS National Power Emergency Regional Emergency Reactor Emergency Cooling System and Condenser Cooling Water System Licensed Facilities Frequency Definitions Closed Mode of Operations Open Mode of Operations ENVIRONMENTAL PROTECTION LIMITS

~Gnera e

Closed Mode Chemical Concentrations Additional or Revised Limitations

~Pa e

1-1 1-1 1<<1 1-1 1-1 1-1 1-1 1-2 1-2 2-1 2-1 2-1 2-1 2-2 3.0 3.1 3.1.1 3.1.2 3.1.3 4.0 4.1 4.1.1 4.1.1.1 4.1.1.2 4.2 4.2.1 4.2.2 MONITORING REQUIREMENTS (Deleted)

~Cose~No e ~oel eted ~

Temperature of Cooling Water (Deleted)

Chemical Concentrations in Cooling Water Monitoring Unit Operability (.".ele ed) s SURVEILLANCE AND SPECIAL STUDY PROGRAMS Aquatic Environment

."e eted Closed Mode (Deleted)

Aquatic Biota Program (Deleted}

Groundwater Program Terrestrial Environment Revegetation of Cooling Canal Banks'ong-Term Monitoring (Deleted) 3-1 3-1 3-1 3-1 3-2 4-1 4-1 4-1 4-1 4-3 4-3 4 3 4 4 5.0 5.1 5.2 5.3 5.4 5.4.1 5.4.

2'.4.2.1 5.4.2.2 5.5 5.6 ADMINISTRATIVE CONTROL Action to be Taken if a Protection Limi't is Exceeded Operating Procedures Plant Reporting Requirements Reports Non-Routine Reports Prompt Reports Thrity-Day Reports Changes Records Retention 5-1 5-2 5-2 5-2 5-2.

5-2

'-3

~

5-3 5-3

'5-4 5-5 Unit Unit No.

3 No.

4 Amendment No. 93 Amendment Nd. 87

II