0 0
UNITEDSTATES NUCLEAR REGULATORY COMMISSlON WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
94 License No.
DPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
C.
D.
E.
The application for amendment by Florida Power and Light Company (the licensee) dated February 16, 1982, as supplemented by letters dated August 12, and December 30, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8303290i17 8303i8 PDR ADOCK 05000250 P
PDR 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-31 is hereby amended to read as follows:
(B)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
g4
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of ?he date of its issuance.
FOR TNE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
March 18, 1983 en r
Operating Reactor 'anch 81 Division of Licen g
I
SI 8 AEONS
+4 0
P Cy flO 0
0 Op
+n eo
<<>>*+>>
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO.
4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 88 License No.
DPR-41 l.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated February 16, 1982, as supplemented by letters dated August 12, and December 30, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the colon
'defense and security or to the health and safety of the public; and E.
The issuance. of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the 'attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-41 is hereby amended to read as follows:
(8)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.
88, are hereby incorporated in the license.
The licensee shall op'crate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FO THE NUC'AR REGULATORY COtNISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
March 18, 1983 Operating Reactors B
ch ~l Division of Licensing
ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO.
94 TO FACILITY OPERATING LICENSE NO.
DPR-31 AMENDMENT NO.
88 TO FACILITY OPERATING LICENSE NO.
DPR-41 DOCKET NOS. 50-250 AND 50-251 Revise Appendix A as fo11ows:
Remove Pa es 6-10 Figure 6.2-1 6.2-2 Insert Pa es 6'-10 Figure 6.2-1 6.2-2
1
, 1. 'hairman:
Vice President, Advanced Systems and Technology 2.
Member:
Chief Engineer, Power Plant Engineering 3.
Menber:
Vice President, Nuclear. Energy 4.
Member:
- Manager, Nuclear Energy 5.
Member.:
Oi rector of Nuclear Affairs 6.
Member:
- Manager, Nuclear Fuel 7.
Member:
Power Plant Engineering Principal Engineer 8.
Member:
power Plant Engineering Senior project Manager 6.5.2.3 ALTERNATES Alternate members shall be appointed in writing by the CHRB Chairman to serve on a temporary basis;
- however, no more than two alternates
~shall participate in.CNRB activities at any one time.
6.5.2.4 CONSULTANTS Consultants shall be utilized as'determined by the CHRB to provide expert advice to the CNRB.
6.5.2.5 MEETING 'FREQUENCY The CHRB shall meet at least once per calendar quarter during the initial year of facility operation following fuel loading and.at least once per six months thereafter.
- 6. S. 2.6
~UORUI<
A quorum of the CHRB shall consist of the Chairman or designated acting Chairman and four (4) members including alternates.
Ho more Amendments 94 5 88 6-10
EXECUTIVE
~
4 ~
VICE PRESIOENT VICE PRESIDENT NUCLEAR ENBIIGY DEPhltTHEHT VICE PRESIDENT ADVANCED SYSTEHS TECIINOLOGY..
VICE PIIESIDEII'f ENGIWEEltING PltOJECT HGT 6 coNsrRvcrIoN HAHAGER NUCLEAR ENERGY OEPARTHENT CHRD ASSISTAHT HANAGER NUCLEAlt ENERGY
'.Phlt SITE HANAGER PTP DIRECTOlt NUCLEAR AFFAIRS PLANT HANAGER PSL PLANT HANAGElt NucLEAR-prp HANAGER QUALITY ASSURAHCL'LANT HANAGEll FOSSIL PTP HANAGER NUCLEAR LXCEHSIHG HAN4GER NUCLEAR ENERGY SERVICES IUCLEhlt ENERGY I.RVICES STAF
'UPERINTENDENT QA-PSL PROJECT FIGURE G.2-1 OFFSITE ORGANIZATION FOR FACILITY HANAGEHENT hND TECIINXCAL SUPPORT Amendments 94 5 88 D
4 l4
NUCLEAR ENERGY SERVICES SThFF
!i lfTt< t L<Y ICS nl'~ I'R TO Floi. o ~
1 I
l.
1 l
.1 NUCr.EhR ENERGY SERVICES S'1'hFF PIRE PROTKCTIÃl AoitIiIISTRn~TOR ncrER TO rxo. 6.1-1 OP Rh IOVS SUPERI.'<.ESDKNT NUCLEAR' rossxL
'LhihT QUALITY CONTRO>>
su?EnvISOR SITE:;WGER Phhtl<<NAVAGKR hJCL~LR TEC!tiV'CAL DEPARTNEÃT su?Knvxson PLANT s KCUR'Y SUP'vaSOR NUCLKlin SAFETY CORP! ITTZE
~!AIN ~VAVC~
SUPERZNTEhorv mzLEhn l.
!IEALTN Pti'YS ICS supEavxson RADIA1'roil 1'l!OfLCTloil
)~0 CNE!LISTRY su? Knvxsoit OPERATIONS supKnvxson 1
HUCI.FAR PLhttT supEnvxson REACTOR supKnvxson F
TRAINING SUPERVISOR SNIFT TKC.'L!ICAL hovrson INSTRURKNT 4
covTnot<
supL'nvrsolt ASSISTA!tT SUPERIilTK<%)KHT NECIWIICAL l!AI!!TKtlhHCE litucLFAR ASSIS<Ah<
SUP Ei!INTK!Q)E.'<T ELKCTllIChlr I4hIIITC!thNCE
. tlJCLEhtt ttucLrwn Ith1'CII KNGINEFn; tlUCl Ehil Co:i ittot<
CK<i.TER 0? 4 <>>%Toit 1.
SENIOR OPERATOR LICENSE 2.
OPERATOR I.ICENSE LICENSED PERSONNEL ON Sl!IFT AS SllOWN IN TABLE 6.2-1 PLANT ORGAN]ttATION CllAR'I'ICURE 6.2-2.
UVl.lCEHSED orEnhTons Amendments.
94 5 88 1