Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17347A674 + (15:38:07, 7 January 2025)
- ML17347A673 + (15:38:08, 7 January 2025)
- ML17347A670 + (15:38:10, 7 January 2025)
- ML17347A669 + (15:38:11, 7 January 2025)
- L-87-539, Forwards Response to NRC 871202 Comments on Util 871118 Submittal of Independent Mgt Appraisal Program Plan.Revised Program Plan Also Encl + (15:38:13, 7 January 2025)
- ML17347A666 + (15:38:16, 7 January 2025)
- ML17347A664 + (15:38:17, 7 January 2025)
- ML17347A662 + (15:38:20, 7 January 2025)
- ML17347A661 + (15:38:21, 7 January 2025)
- L-87-581, Forwards 1987 Inservice Insp Summary Rept & Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval + (15:38:24, 7 January 2025)
- L-87-511, Responds to Violations Noted in Insp Repts 50-250/87-43 & 50-251/87-43.Corrective Actions:Procedure O-ONOP-048 Will Be Enhanced to Assure That Heat Tracing Thermostats Adjusted Only by Electrical Maint Personnel + (15:38:30, 7 January 2025)
- L-87-516, Forwards Nov 1987 Select Sys Assessment Progress Summary + (15:38:33, 7 January 2025)
- ML17347A656 + (15:38:43, 7 January 2025)
- ML17347A654 + (15:38:45, 7 January 2025)
- ML17347A653 + (15:38:47, 7 January 2025)
- L-87-504, Advises That Internal Util Rept Re Issues Surrounding Manipulation of Controls by Unlicensed Individual Available for Inspection by NRC on Request,Per Telcon + (15:38:48, 7 January 2025)
- L-87-499, Forwards JPE-PTPO-87-350, Outside Containment Limitorque Wire Rept, as Committed to in Util .Rept Concludes That Limitorque Operators Would Have Performed Designed Safety Function + (15:38:55, 7 January 2025)
- 05000251/LER-1987-025-02, :on 871012,containment & Control Room Ventilation Isolation Occurred.Cause by High Levels of Rb-88 in Containment Following Unit Shutdown.Particle Grab Sample Taken & Leak Rate Calculation Performed + (15:39:01, 7 January 2025)
- ML17347A647 + (15:39:03, 7 January 2025)
- L-87-500, Forwards Partial Florida Power & Light Co Turkey Point Plant Unit 3 Cycle XI Startup Rept, to Cover Testing Performed Up to 30% Power & to Document first-time Use of Hafnium Vessel Flux Depression Assemblies + (15:39:05, 7 January 2025)
- ML17347A644 + (15:39:08, 7 January 2025)
- L-87-495, Forwards Summary of Mgt on Shift Repts for Wk Starting 871123.Procedure O-ADM-019, Mgt on Shift Encl + (15:39:10, 7 January 2025)
- ML17347A642 + (15:39:13, 7 January 2025)
- L-87-501, Special rept:non-functional Fire Barrier Penetrations Not Returned to Functional Status within 7 Days.Impairments Caused by Number of Mods Being Performed & Equipment Malfunction.Implementation of Plant Mods Continuing + (15:39:14, 7 January 2025)
- ML17347A640 + (15:39:18, 7 January 2025)
- ML17347A639 + (15:39:19, 7 January 2025)
- ML17347A638 + (15:39:22, 7 January 2025)
- ML17347A637 + (15:39:24, 7 January 2025)
- TAC:65721 + (15:39:28, 7 January 2025)
- ML17347A634 + (15:39:31, 7 January 2025)
- ML17347A625 + (15:39:33, 7 January 2025)
- L-87-489, Responds to Violations Noted in Insp Repts 50-250/87-39 & 50-251/87-39.Corrective Actions:Fuse Insp Expanded to Include Nuclear Instrumentation,Qualified Safety Parameter Display & post-accident Sampling Sys for Both Units + (15:39:34, 7 January 2025)
- 05000250/LER-1987-030, :on 871027,determined That Existing Min Recirculation Design Configuration for RHR Sys Potentially Inadequate.Recirculation Flow Path for RHR Pumps Original Design of Plant.Mods Developed + (15:39:40, 7 January 2025)
- L-87-488, Forwards mgt-on-shift Weekly Rept for 871116-23,per NRC 871019 Order + (15:39:43, 7 January 2025)
- L-87-486, Remits Payment for NRC 871105 Order Imposing Civil Penalty, Per Enforcement Action 87-098 + (15:39:47, 7 January 2025)
- L-87-476, Forwards Response to NRC Questions Raised in 870922 Telcon Re Util ATWS Submittal.Issues Discussed Include Conceptual Design,Isolators,Uninterruptible Power Supply & Frequency of end-to-end Testing + (15:39:53, 7 January 2025)
- L-87-479, Responds to NRC 871019 Notice of Violation & Forwards Payment for Proposed Civil Penalty from Listed Insp Repts. Addl long-term Corrective Actions Will Be Provided in Response to Order + (15:39:56, 7 January 2025)
- L-87-480, Forwards Summary of mgt-on-shift Repts Weekly Rept for Wk of 871109-16,per Commission 871019 Order + (15:40:00, 7 January 2025)
- L-87-461, Forwards Summary of mgt-on-shift Repts,Per NRC 871029 Order + (15:40:03, 7 January 2025)
- L-87-466, Responds to Violations Noted in Insp Repts 50-250/87-41 & 50-251/87-41.Corrective Actions:Startup Dept Organized to Be Responsible for Sys Acceptance Walkdowns & Testing + (15:40:08, 7 January 2025)
- 05000251/LER-1987-025-01, :on 871012,containment Vent & Control Room Ventilation Isolation Actuated.Caused by High Levels of Rb-88 in Containment Following Unit Shutdown.Containment Activity Level Returned to Normal + (15:40:11, 7 January 2025)
- ML17347A602 + (15:40:16, 7 January 2025)
- L-87-293, Forwards Response to NRC 870508 Draft Safety Evaluation & Draft Revs to Procedures Generation Package + (15:40:17, 7 January 2025)
- IR 05000250/1987027 + (15:40:25, 7 January 2025)
- ML17347A599 + (15:40:28, 7 January 2025)
- ML17347A597 + (15:40:30, 7 January 2025)
- ML17347A593 + (15:40:31, 7 January 2025)
- 05000250/LER-1987-017, :on 870528,29 & 0603,normal & Emergency Boration Flow Paths Lost.Caused by Damaged in-board Mechanical Seal on Boric Acid Transfer Pumps 4B.Mechanical Seal Inspected & Repaired + (15:40:32, 7 January 2025)
- ML17347A590 + (15:40:41, 7 January 2025)
- ML17347A587 + (15:40:42, 7 January 2025)
- 05000250/LER-1987-016, :on 870526,while in Mode 6,partial Actuation of Train a Safeguards Equipment Occurred.Caused by Sticking Safety Injection Block Switch.Switch Inspected,Cleaned & Returned to Svc + (15:40:44, 7 January 2025)