Notice of Violation from Insp on 870518-0622.Violation Noted:Failure to Implement Tech Spec Requirement Re Surveillance Testing
ML17347A599
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/17/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To:
Shared Package
ML17347A598 List:
References
50-250-87-27, 50-251-87-27, NUDOCS 8707240348
Download: ML17347A599 (1)


Text

0

~

ENCLOSURE 1

NOTICE OF VIOLATION Florida Power and Light Company Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 License Nos.

DPR-31 and DPR-41

~During the Nuclear Regulatory Commission (NRC),inspection conducted on May 18-June 22,

1987, a violation of NRC requirements was identified.

The violation involved the failure to implement a

Technical Specification requirement regarding surveillance testing.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C

(1986), the violation is listed below:

Technical Specification (TS) 4. 1, Table 4.1-1, Sheet 4,

Channel Description Item 38.b, requires a monthly channel functional surveillance test be performed for the Unit 3 spent fuel exhaust monitor.

Contrary to the

above, on" May 14,
1987, the licensee discovered that the monthly TS required surveillance test of the Unit 3 spent fuel pit exhaust monitors had not been performed in the month of April.

The surveillance was last performed on March 11, 1987 and was required by T.S. to be performed by April 18, 1987.

This is is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:

(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results

achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is

shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION ORlalNAL Sll--NSO aV DAVtD Ah. VERP.ELLI David M. Verre 1 li, Chief Reactor Projects Branch 1

Division of Reactor Projects Dated at Atlanta, Georgia this 17thday of July 1987 8707240348 870717 PDR ADOCK 05000250 G