REGULA Y INFORMATION DISTRIBUTION YSTEM (RIDB)
ACCESSION NBR: 8712100236 DQC. DATE: 87/12/04 NOTARIZED:
NQ FACIL: 50-250 Tur keg Point Planti Unit 3i Florida Power and Light C
50 251 Turkey Point Planti Unit 4i Florida Power and Light C
AUTH. NAME AUTHOR AFFILIATION GRACEi J. N.
Region 2i Qfc of the Director REC IP. NAME REC IP IENT AFFILIATION WOODY'. O.
Florida Power
~ Light Co.
DOCKET 05000250 05000251
SUBJECT:
Forward'iweekly status rept on plant. Rept discusses recent oper ating events 5 performance trends.
DISTRIBUTION CODF:
IE01D COPIES RECEIVED: LTR J ENCL
(
SIZE:
TITLE: General (50 Dl t) Insp Rept/Notice of Violation Response NOTES:
REC lP IENT ID CODF/NAME PD2-2 PD CQP IES LTTR ENCL 1
1 RECIPIENT ID CODE/NAME McDONALDiD CQP IES LTTR ENCL 2
2 INTERNAL:
AEOD NRR MORIBBEAUiD NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRD OGC/HDB2 RES DEPY Gi DEDRO NRR/DLPG/PEI3 NRR/DREP/EP8 NRR/DRIB DIR 0
HERMANN J RFG FIL ILE 01 1
1 1
1 1
1 1
1 1
1 1
EXTERNAL:
1 TOTAL NUMBER QF COPIES REQUIRED:
LTTR 21 ENCL 21
Docket Nos.
50-250, 50-251 License Nos.
DPR-31, DRP-41 Florida Power and Light Company ATTN:
Mr. C. 0.
Woody Group Vice President Nuclear Energy Department P. 0.
Box 1400 Juno
- Beach, FL 33408 DEC 0 4 1987 Gentlemen:
SUBJECT:
BIWEEKLY STATUS REPORT ON TURKEY POINT The purpose of this letter is to forward the NRC's Biweekly Status Report on your Turkey Point facility.
The enclosure discusses recent operating events and performance trends.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Enclosure:
Turkey Point Status Report cc w/encl:
J.
Odom, Vice President Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, Florida 33102 C. J. Baker, Plant Manager Turkey Point Nuclear Plant P. 0.
Box 029100 Miami, Florida 33102 Harold F. Reis, Esq.
Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Norman A. Coll, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 J.
Nelson Grace Regional Administrator U. S. Environmental Protection Agency Region IV Reaional Radiation Representative 345 Courtland Street, N.W.
Atlanta, Georgia 30308 87i2i0023h 87i204 PDR ADOCK 05000250 R
Florida Power and Light Company Attorney General Department of Legal Affairs The Capitol Building Tallahassee, Florida 32301 Allan Schubert, Public Health Physicist Manager Office of Radiation Control Radiological Health Services Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida Twin Towers 2600 Blair Stone Road Tallahassee, Florida 32301 State Planning and Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Sergio Pereira County Manager of Metropolitan Dade County Miami, Florida 33130 Intergovernmental Coordination and Review Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Martin H. Hodder, Esq.
1131 N.E. 86th Street Miami, Flor ida 33130 bcc w/encl:
J. Taylor, DEDRO J.
Lieberman, Director, Enforcement T.
E. Murley, Director, NRR S.
A. Varga, Director, DRP-I, II, NRR Document Control Desk DEC 0 4
$987 RI I CC ristensen:tm 11/3~/87 ilson 11/Pg/87 RII~
WHehl 11/P /87 RI RI I Ernst Reyes 115 o/87
ENCLOSURE TURKEY POINT STATUS REPORT (November 10 - 24, 1987)-
1.
Plant Status Units
- 3. and 4 are currently in Mode 5, conducting a maintenance outage.
2.
Facilit 0 erations Summar Unit 3 remains down (from the last report) due to conducting modifications to the unit's Residual Heat Removal (RHR) pump mini-flow recirculation lines.
The unit is presently scheduled for restart on December 15, 1987.
Unit 4 also remains down due to the RHR pumps mini-flow recirculation line modification.
Additionally, the licensee continues maintenance on other Unit 4 plant equipment; component cooling water pump surge line
- repair, intake cooling water pump electrical correction box repair, PORV block valve repair and other system valves that have minor leakage.
The unit is presently scheduled for restart on December 4,
1987.
The licensee has taken the conservative approach in delaying unit 3 restart until unit 4 is on line.
M f FPL continues the Management-on-Shift Program.
The second week's report identified no major problem areas, although the Region still expressed some concern over the lack of details in several of the "daily" shift reports.
FPL has selected the contractor for the independent management review team.
The contractor is ENERCON Services, Inc.
Additionally, their review plan was submitted to the NRC for review and approval on November 18,
- 1987, as required by Order.
, 4.
NRC Staff Activities Durin The Period The Region reviewed the independent management review plan submitted November 18 and presented its comments at the Management Meeting that was conducted on November 24, 1987, at the Turkey Point facility.
Overall the plan appeared comprehensive and the Region had several comments.
The Management Meeting was well attended by FPL upper management, including R.
E. Talion, FPL's President and Chief Operating Officer.
Commissioner Rogers conducted a site visit on November 23, 1987.
The Deputy Regional Administrator and Director of Reactor Projects accompanied him on his visits.
The Unit 4 and 3 startup will be closely monitored by the resident inspectors.