L-87-516, Forwards Nov 1987 Select Sys Assessment Progress Summary

From kanterella
Jump to navigation Jump to search
Forwards Nov 1987 Select Sys Assessment Progress Summary
ML17347A657
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/14/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-87-516, NUDOCS 8712170191
Download: ML17347A657 (4)


Text

ACCELERATED DI RIBUTION DEMONST> TION SYSTEM t

REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR: 8712170191 DOC. DATE: 87/12/14 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION WOODY,C.O.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000250 05000251

SUBJECT:

Forwards Nov 1987 progress summary of select sys assessment.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR + ENCL

SIZE:

TITLE: OR Submittal: General Distribution NOTES RECIPIENT ID CODE/NAME PD2-2 LA McDONALD,D INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RS B NRR PMAS/ILRB EG F 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

0 1

1 1

0 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDS2 RES/DE/EIB NRC PDR COPIES LTTR ENCL 5

5 1

1 1

1 1

1 1

0 1

1 1

1 j

A TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 17

P. O.

Y 14000, JUNO BEACH, FL 33408.0420 gal& "Ag, KFMgFg 1 4 1987 L-87-516 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Select S stem Assessment Pro ress Summar Attached please find the November 1987 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, C.

O.

ody Executive Vice President COW/SDF/gp Attachment cc:

Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant SDF/010.SS pO 87i2i70i9i 87i2i4 PDR

  • DOCK 05000250

.P.,-,9 CD an FPL Group company

~s i r

4 1

SELECT SYSTEM REVIEW NOVEMBER 1987 PROGRESS DESIGN BASIS RECONSTITUTION A vendor was selected and released to work on performance of a

risk based assessment of historic Plant Change/Modifications.

Reconstituted design basis documents are expected to be issued for trial use in December.

SAFETY ENGINEERING GROUP SEG REVIEW The SEG Unit 3 closeout report was issued on schedule on November ll, 1987.

The System Engineers are reviewing the report and will have corrective actions initiated where necessary by mid-January.

CONFIGURATION MANAGEMENT Revisions to the affected drawings resulting from implementation of Select System modifications during the Unit 3 Refueling Outage are scheduled for completion by January 11I 1988.

OTHER SIGNIFICANT PROGRESS 0

Closed various nonconformance reports (NCRs) on the Intake Cooling Water (ICW)

System (details available on request.

Revised procedure 3/4-0SP-49.1 to include bistable tag and status suffix for Reactor Protection System.

Labelled protection racks and associated equipment.

0 Confirmed corrections to FSAR for Reactor Protection System.

Updated various Reactor Protection System related procedures and the system descriptions.

0 Analyzed failure of DC busses during maintenance and the effects of cross connecting with a battery out of service.

Confirmed corrections to FSAR for Vital Power System.

SDF/010.SS