Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-88-334, Forwards Application for Renewal of NPDES Permit for Facility Submitted to EPA on 880728 + (15:31:44, 7 January 2025)
- L-88-328, Submits Brief Description of Changes Made to Plant Security Organization,Per NRC Request + (15:31:47, 7 January 2025)
- ML17347A834 + (15:31:51, 7 January 2025)
- 05000250/LER-1988-013, :on 880707,discovered That Monthly Channel Functional Test Surveillance Procedure Did Not Check Sys Alarm.Caused by Personnel Error.Surveillance Procedure Corrected & Personnel Counseled + (15:31:53, 7 January 2025)
- ML17347A831 + (15:31:56, 7 January 2025)
- IR 05000250/1988011 + (15:31:57, 7 January 2025)
- L-88-325, Forwards Mgt on-shift Weekly Rept + (15:31:59, 7 January 2025)
- L-88-310, Forwards Summary of mgt-on-shift Repts for Wk Starting 880708 & Plant supervisor-nuclear Shift Repts,Per Commission 871019 Order + (15:32:08, 7 January 2025)
- ML17347A826 + (15:32:14, 7 January 2025)
- ML17347A824 + (15:32:15, 7 January 2025)
- L-88-312, Responds to Suppls 1 & 2 to NRC Bulletin 87-002 Re Fastener Testing to Conform W/Applicable Matl Specs.Primary,Secondary & non-safety Suppliers List Encl + (15:32:17, 7 January 2025)
- L-88-308, Forwards Select Sys Assessment Progress Summary for June 1988,per NRC 860812 Order + (15:32:25, 7 January 2025)
- L-88-290, Discusses Upgrading of Plant Process Radiation Monitoring Sys to Comply W/Reg Guide 1.97 + (15:32:30, 7 January 2025)
- ML17347A818 + (15:32:35, 7 January 2025)
- ML17347A816 + (15:32:36, 7 January 2025)
- L-88-273, Forwards mgt-on-shift Weekly Repts for Wk of 880613 + (15:32:38, 7 January 2025)
- ML17347A813 + (15:32:46, 7 January 2025)
- ML17347A811 + (15:32:48, 7 January 2025)
- 05000250/LER-1988-011, :on 880529,discovered That Diesel Oil Storage Tank Isolation Valve 70-003 Locked Closed.Caused by Personnel Error.Technician Disciplined & Info Bulletin Re Work Controls & Procedural Compliance Issued + (15:32:53, 7 January 2025)
- L-88-281, Informs That Util Will Provide Next 6-month Integrated Schedule Rept Following Nov 1988 Rept + (15:32:55, 7 January 2025)
- ML17347A808 + (15:32:58, 7 January 2025)
- L-88-262, Forwards Summary of mgt-on-shift Weekly Repts & Plant supervisor-nuclear Shift Repts + (15:32:59, 7 January 2025)
- L-88-272, Responds to NRC Re Violations Noted in Insp Repts 50-250/87-47 & 50-251/87-47.Corrective Actions:Procedures Will Be Revised or New Procedure Will Be Generated to Address Handling of Response to NRC Violations + (15:33:02, 7 January 2025)
- ML17347A800 + (15:33:05, 7 January 2025)
- L-88-248, Forwards Mgt on Shift (MOS) Weekly Rept for Wk of 880523 Per NRC 871019 Order.Plant Supervisor Nuclear MOS Repts Also Encl + (15:33:07, 7 January 2025)
- ML17347A798 + (15:33:10, 7 January 2025)
- ML17347A797 + (15:33:15, 7 January 2025)
- TAC:67537 + (15:33:16, 7 January 2025)
- ML17347A795 + (15:33:18, 7 January 2025)
- ML17347A794 + (15:33:23, 7 January 2025)
- 05000250/LER-1988-010, :on 880528,containment Ventilation & Control Room Ventilation Isolation Occurred While Containment Radiation Monitor Setpoint Being Checked.Drawer for Monitor R-11 Initiated Signals.Drawer Replaced + (15:33:27, 7 January 2025)
- 05000250/LER-1988-009, :on 880527,determined That Tech Spec Surveillances for Station Battery Pilot Cell Rotation Not Properly Implemented in 1987.Caused by Personnel Error & Procedure Inadequacy.Training Bulletin Issued + (15:33:30, 7 January 2025)
- 05000250/LER-1987-007-01, :on 870128,diesel Fuel Storage Tank Sample Did Not Meet Tech Spec Surveillance Requirements.Caused by Not Using Sampling Techniques in Accordance W/Std ASTM Sampling Procedures.Procedure Revised + (15:33:36, 7 January 2025)
- L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control + (15:33:38, 7 January 2025)
- IR 05000250/1988002 + (15:34:01, 7 January 2025)
- ML17347A785 + (15:34:06, 7 January 2025)
- L-88-269, Forwards Emergency Power Sys Enhancement Rept, Per 880527 Proposed Schedule.Rept Provides Preliminary Info Re Proposed Electrical Power Enhancements Which Will Be Installed at Facility + (15:34:08, 7 January 2025)
- L-88-254, Forwards Summary of mgt-on-shift(MOS) Weekly Repts for 880530-0606,per NRC 871019 order.PS-N MOS Repts Also Included + (15:34:13, 7 January 2025)
- Press Release-17-050, NRC Executive Receives Presidential Rank Award + (15:34:17, 7 January 2025)
- L-88-264, Forwards May 1988 Progress Summary of Select Sys Assessment, Per 860812 NRC Order + (15:34:19, 7 January 2025)
- L-88-256, Forwards Rev 11 to Fpltqar 1-76A, Topical QA Rept & marked-up Rev 10.Revs Are Organizational Changes + (15:34:23, 7 January 2025)
- 05000266/LER-1917-003, Regarding Degraded Condition + (15:34:30, 7 January 2025)
- L-88-217, Forwards Summary of mgt-on-shift Repts for Wk Beginning 880502 + (15:34:32, 7 January 2025)
- 05000266/LER-1917-002, Regarding Operation or Condition Prohibited by Technical Specifications + (15:34:39, 7 January 2025)
- L-88-202, Forwards Summary of mgt-on-shift Weekly Rept,Per NRC 871019 Order + (15:34:45, 7 January 2025)
- ML17347A766 + (15:35:16, 7 January 2025)
- L-88-195, Forwards Summaries of mgt-on-shift (MOS) Repts & Plant supervisor-nuclear MOS Repts for Wk Starting 880418 + (15:35:18, 7 January 2025)
- PNO-II-88-029, on 880427,plant Shut Down Due to Increased RCS Leakage to 3.1 Gpm.Caused by Leaking Pressurizer Spray Valve.Resident Inspectors Will Conduct Routine Followup & State of Fl Will Be Informed + (15:35:47, 7 January 2025)
- L-88-196, Part 21 Rept Re Component Cooling Water Sys Containment Isolation Function.Addl Evaluation of Issue in Progress as Part of Util Design Basis Effort.Ltr Sent as Formal Followup to Feb 1988 Discussion + (15:35:49, 7 January 2025)
- ML17347A750 + (15:36:03, 7 January 2025)
- ML17347A742 + (15:36:05, 7 January 2025)