ML17347A742

From kanterella
Jump to navigation Jump to search
Advises That Liquid Sample Spiked W/Radionuclides Will Be Sent to Facility for Radiochemical Analyses as Part of NRC Confirmatory Measurements Program.Analyses Requested No Later That 60 Days from Receipt of Samples
ML17347A742
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/21/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8805040256
Download: ML17347A742 (4)


Text

lorida Power and Light Company

~

~

~

ATTN:

Hr.

W. F.

Conway Acting Group Vice President Nuclear Energy Department P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

DOCKET NOS. 50-250 AND 50-251 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the Turkey Point facility for radiochemical analyses.

These samples are to be analyzed for tritium, iron-55, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples.

If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples.

The spiked

samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory, within approximately 30 days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples.

Results should be sent to:

U. S. Nuclear Regulatory Commission, Attn:

Hr. J.

B. Kahle.

Our evaluation of your results will be discussed with your staff and transmitted in a letter.

Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Nr. Kahle by telephone at (404) 331-6968.

Sincerely, Douglas H. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc:

J.

S.

Odom, Vice.President Turkey Point Nuclear Plant

. J. Baker, Plant Hanager Turkey Point Nuclear Plant W. Bladow, Plant gA Superintendent

. Arias, Jr., Regulatory and Compliance Supervisor

. Neils, Chemistry Supervisor ssosooozss ssooai PDR ADOCK 05000250 P

FDR

Florida Power and Light Company bcc G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor

Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk State of Florida RI I SA6amovitz 4//F/88

/ y/88 I

R rlenj k 4/ A/88