Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17347B429 + (15:20:31, 7 January 2025)
- ML17347B428 + (15:20:31, 7 January 2025)
- L-89-391, Application for Amend to License DPR-41,deleting License Condition 3.J, IAEA Safeguards + (15:20:32, 7 January 2025)
- ML17347B424 + (15:20:34, 7 January 2025)
- ML17347B426 + (15:20:34, 7 January 2025)
- L-89-412, Forwards Monthly Operating Rept for Oct 1989 for Turkey Point,Units 3 & 4 & Corrected Operating Data Rept for Sept 1989 for Turkey Point,Unit 3 + (15:20:35, 7 January 2025)
- ML17347B422 + (15:20:39, 7 January 2025)
- L-89-404, Special Rept:Provides List of Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days, Per Tech Spec 3.14.5.b.Caused by Performance of Fire Protection Surveillance.Compensatory Measures Implemented + (15:20:40, 7 January 2025)
- 05000250/LER-1989-015, :on 891019,charging Pumps Declared Inoperable Due to Inability to Maintain Pressurizer Level w/45 Gpm Letdown Orifice in Svc.Caused by Inadequate Troubleshooting. Suction/Discharge Valves for Pump Overhauled + (15:20:46, 7 January 2025)
- 05000251/LER-1989-013-01, :on 891020,discovered That Quarterly Inservice Testing of Intake Cooling Water Isolation Valves to HXs Not Performed.Caused by Personnel Error.Valves Tested & Determined to Meet Function + (15:20:50, 7 January 2025)
- ML17347B417 + (15:20:52, 7 January 2025)
- 05000250/LER-1988-018, :on 880822,refueling Water Storage Tank Supply to ECCS Isolated from Both Trains of Eccs,Including RHR, Containment Spray & Hpsi.Caused by Procedure Inadequacy. Procedures Revised to Exclude Monthly Cycling + (15:20:58, 7 January 2025)
- ML17347B415 + (15:21:00, 7 January 2025)
- 05000250/LER-1988-015, :on 880729,valves in Flow Path Between Hydrogen Monitors & Containment Bldg Not Verified in Proper Position. Caused by Inadequate Administrative Controls.Procedures Revised to Verify Valve Position + (15:21:01, 7 January 2025)
- TAC:65032 + (15:21:02, 7 January 2025)
- L-89-394, Submits Addl Items Found Not to Meet Criteria of Position 7 of Suppl 1 to NRC Bulletin 88-010 Re Nonconforming Molded Case Circuit Breakers.Current Status of Four Breakers Not Meeting Criteria Discussed + (15:21:04, 7 January 2025)
- L-89-385, Forwards Annual Rept of Leaking Radioactive Sources for Nov 1988 - Oct 1989 + (15:21:06, 7 January 2025)
- L-89-378, Provides Sept 1989 Progress Summary of Select Sys Assessment + (15:21:07, 7 January 2025)
- L-89-396, Transmits Results of Analysis of Unknown Spike Samples Received on 890720 for Sr-89 & 90,per Util & NRC Confirmatory Measurements Program + (15:21:09, 7 January 2025)
- L-89-380, Forwards Integrated Schedule Monthly Summary Rept for Sept 1989.Integrated Schedule Based on Listed Refueling & Maint Outage Schedules + (15:21:11, 7 January 2025)
- ML17347B407 + (15:21:13, 7 January 2025)
- ML17347B406 + (15:21:14, 7 January 2025)
- ML17347B405 + (15:21:15, 7 January 2025)
- ML17347B403 + (15:21:17, 7 January 2025)
- L-89-329, Forwards Addl Info Re 890605 Proposed License Amend to Implement Revised Tech Specs,Including Proposed Changes to Fsar.Requests Mod of Requirements & Bases for Tech Specs 4.6.2.2.a + (15:21:18, 7 January 2025)
- L-89-375, Special Rept:Breached Fire Barriers & Other Fire Protection Sys Impairments Existing for More than 7 Days.Cause Not Stated.Fire Protection Impairments 2820 & 2821 Issued for Installation of Conduits + (15:21:19, 7 January 2025)
- ML17347B400 + (15:21:21, 7 January 2025)
- ML17347B399 + (15:21:22, 7 January 2025)
- IR 05000250/1989041 + (15:21:26, 7 January 2025)
- ML17347B396 + (15:21:27, 7 January 2025)
- ML17347B395 + (15:21:30, 7 January 2025)
- 05000251/LER-1989-012-01, :on 890927,one of Two wide-range Containment Water Level Indicators Found Deenergized.Caused by Personnel Error.Bump Covers Will Be Placed on Containment Level Receivers + (15:21:33, 7 January 2025)
- ML17347B391 + (15:21:35, 7 January 2025)
- IR 05000250/1989036 + (15:21:58, 7 January 2025)
- ML17347B388 + (15:22:00, 7 January 2025)
- IR 05000250/1989039 + (15:22:03, 7 January 2025)
- ML17347B385 + (15:22:11, 7 January 2025)
- TAC:73555 + (15:22:12, 7 January 2025)
- ML17347B383 + (15:22:13, 7 January 2025)
- L-89-372, Monthly Operating Repts for Sept 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (15:22:14, 7 January 2025)
- 05000251/LER-1985-002-01, :on 850129,malfunction Caused Emergency Diesel Generator a to Be Out of Svc So Vital Buses 3A & 4A Did Not Have Access to Onsite Emergency Power.Caused by Short in Panel Light Socket.Plant Change/Mod Initiated + (15:22:20, 7 January 2025)
- ML17347B380 + (15:22:22, 7 January 2025)
- 05000251/LER-1989-003, :on 890505,reactor Protection Sys Actuation Occurred While Performing Procedure 4-SMI-071.4.Caused by Lifted Leads in Turbine Stop Valves Position Sensing Circuitry.New Procedure Developed + (15:22:25, 7 January 2025)
- L-89-364, Special Rept Providing List of Nonfunctional Fire Barrier Penetrations Not Returned to Function Status within 7 Days. Plant Continues to Implement Compensatory Measures as Applicable + (15:22:26, 7 January 2025)
- IR 05000250/1989027 + (15:22:29, 7 January 2025)
- L-89-369, Advises That Util Will Conduct Emergency Plan Exercise on 891130.Exercise Will Involve Participation by Local Emergency Response Agencies & State Emergency Response Personnel & Will Be Evaluated by FEMA + (15:22:30, 7 January 2025)
- ML17347B374 + (15:22:33, 7 January 2025)
- L-89-342, Forwards Integrated Schedule Monthly Summary for Aug 1989, Reflecting Info as of Issuance Date of 890818 + (15:22:34, 7 January 2025)
- 05000251/LER-1989-010-01, :on 890906,nuclear Instrumentation Sys Rod Drop Signal Received Resulting in Turbine Runback.Caused by Inadequate Procedure Which Did Not Provide Guidance Re Rate of Reduction in Reactor Power.Tubes Plugged.W/Undtd Ltr + (15:22:36, 7 January 2025)
- L-89-352, Responds to NRC Re Generic Ltr 87-02, Verification of Sesimic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. Util Plans to Submit Suppl to Accepted App B Implementation Program,Per Request + (15:22:38, 7 January 2025)
- ML17347B370 + (15:22:38, 7 January 2025)