Forwards Insp Repts 50-250/89-39 & 50-251/89-39 on 890809-11.No Violations or Deviations Noted
ML17347B385
Person / Time
Site: Turkey Point  
Issue date: 10/23/1989
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347B386 List:
References
NUDOCS 8911010042
Download: ML17347B385 (6)


See also: IR 05000250/1989039

Text

Octobex 23,

1989

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31, .DPR-41

Florida Power and Light Company

ATTN:

Mr. C.-O.

Woody, Acting

Senior Vice President - Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-250/89.-39

AND 50-251/89-39

This refers

to the Nuclear Regulatory Commission

(NRC) inspection

conducted

by

T. McElhinney,

M. Morgan

and

A. Lopez

on August 9-11,

1989.

The inspection

included

a review of activities authorized for your Turkey Point facility.

At

the

conclusion

of the

inspection,

the findings

were

discussed

with those

members of your staff identified in the enclosed

Inspection

Report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the

inspection

consisted

of observations

of operating

crew

activities

and

performance

while

in

the

control

room

and

during

requalification training.

Within =the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

(OBIGINAL SIGNED BY T. A. PEE3I2%)

Enclosure:

NRC Inspection

Report

Thomas

A. Peebles,

Chief

Operations

Branch

Division of Reactor Safety

cc w/encl:

K. N. Harris, Vice President

Turkey Point Nuclear Plant

P.M.

Box 029100

8yiiOiO042 85'l028

~iami,

FL

33102

PDR

gQQCK

Q~iQOO$ 5O

9

PDC

(cc w/encl cont'd - see

page

2)

~ Cc I

0

Florida Power and Light Ccnpany

October 23,

1989

(cc w/encl cont'd)

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

L.

W. Bladow

Plant

gA Superintendent

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

E. Lyons, Acting Regulatory

and

Compliance Supervisor

Turkey, Point Nuclear Plant

P. 0.

Box 029100

'iami,

FL

33102

Harold F. Reis,

Esq.

Newman and Holtzinger, P.C.

1615

L Street,

NW

Washington,

D.

C.

20036

John T. But'Ier, Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

32304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallashssee,

FL

32399-0700

Jack Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

(cc w/encl cont'd - see

page

3).

0

Florida power and Light Com&ny

October 23,

1989

(cc w/encl cont'd)

Joaquin Avino

County Manager of Metropolitan

Dade County

111

NW 1st Street,

29th Floor

Miami, FL

33128

Intergovernmental

Coordination

and Review

Office of Planning

and Budget

Executive Office of the Governor

The Capitol Building

=-

Tallahassee,

FL

32301

State of Florida

bcc w/encl:

G.

E. Edison, Project Manager,

Project Directorate II-2,

Division of Reactor Projects,

NRR

tlSetnjment Control

Oesk

NRC Resident

Inspector

U. S. Nuclear Regulatory

Commission

P. 0.

Box 57-1185

Miami,

FL

33257-,1185

\\

C. Casto,

DRS

N. Morgan,

DRS

A. Lopez,

PNL

RII:

R

e

NMo

n

10/gl /89

RII:DRS

CCasto

10/

/89

RII:DRS

TAPeebles

10/

/89