ML17347B388
| ML17347B388 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/19/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B389 | List: |
| References | |
| NUDOCS 8911030118 | |
| Download: ML17347B388 (4) | |
See also: IR 05000250/1989036
Text
pg
g g 1989
Docket Nos. 50-250.
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Mr. J.
H. Goldberg
Executive Vice President - Nuclear
P. 0.
Box 14000
Juno
Beach.
FL
33408-0420
Gentlemen:
Subject:
NRC INSPECTION
REPORT
NOS. 50-250/89-36
AND 50-251/89-36
The
NRC Systematic
Assessment
of Licensee
Performance
(SALP) has
been
completed
for your Turkey Point Facility.
The facility was evaluated for the period
July l.
1988,
through July 31,
1989.
The results
of the evaluation
are
documented
in the enclosed
Interim SALP Report.
This report will be discussed
with you at
a public meeting to be held at the. Turkey Point'Site
on October 26.
1989. at 9:00 a.m.
Turkey Point's
performance
was
evaluated
in the functional
areas
of Plant
Operations,
Radiological
Controls,
Maintenance/Surveillance.
Emergency
Preparedness.
Security,
Engineering/Technical
Support
and
Safety
Assessment/equality
Verification.
Although the functional
areas
evaluated
during this
assessment
period
are
not identical
to those
in the
previous
period,
a close correlation
can
be
made
concerning
changes
in performance.
Turkey Point's
performance
has
improved substantially
in most areas
since the
last
assessment
period.
One area.
Security,
remains
a category 3; however.
improvements
have
been
noted in this area.
especially
toward the
end of the
assessment
period.
Recent
management
changes
and oversight
have
been effective
in achieving these
improvements.
The assessment
indicates that over the
SALP period Turkey Point's perfor-
mance
exceeded
the
performance
level
needed
to
meet
minimum regulatory
requirements.
Improvements
in performance
during the assessment
period are
a
continuation of trends
noted at the
end of the last period and is
a result of
extensive
management
changes.
emphasis
on accountability.
determined
approach
to finding root causes,
and
placement
of priorities
on plant safety
and
reliability.
We
recognize
your efforts
to
improve plant safety
and reliability as
demonstrated
by strong
management
oversight
and placement of Operations
in an
overall
responsible
role for directing all plant activities.
Your
improved
regulatory
and operational
performance
during this period are
a direct result
of these
initiatives
and the
implementation
of the
Independent
Management
Appraisal
recommendations.
- P g ] Q3Q 1 1
QQQP)c,(.)
g 891Ql9
F'.gp
ADGCK Q"
9
Vo
Florida Power and Light Company
OCT1g
88'ny
comments
you
have
concerning
our evaluation of the
performance
of your
Turkey Point facility should
be
submitted
to this office within 30
days
following the date of our meeting.
These
comments will be considered
in the
development of the Final
SALP report.
Should
you
have
any questions
concerning this letter.
we will be
glad to
discuss
them with you.
Sincerely.
l~ t>...
I
Enclosure:
Interim SALP Report - Turkey Point
cc w/encl:
K. N. Harris. Vice President
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami. FL
33102
Stewart
D. Ebneter
Regional Administrator
v. E. Cross,
Plant Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami. FL
33102
L. W. Bladow
Plant
gA Superintendent
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami, FL
33102
E. Lyons. Acting Regulatory
and
Compliance Supervisor
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami.
FL
33102
Harol d F.
Rei s,
Esq.
Newman
and Holtzinger,
P.C.
1615
L Street.
NW
D.
C.
20036
(cc w/encl cont'd - see
page 3)
Power
and Light Company
(cc w/encl cont'dl
John T. Butler. Esq.
Steel.
Hector and Davis
4000 Southeast
Financial
Center
Miami.
FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee.
FL
332304
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahssee,
FL
32399-0700
Jack
Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee.
FL
32304
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahassee.
FL
32301
Joaquin
Avino
County Manager of Metropolitan
Dade County
111
NW 1st Street.
29th Floor
Miami,
FL
33128
Intergovernmental
Coordination
and Review
Office of Planning
and Budget
Executive Office of the Governor
The Capitol Building
Tallahassee.
FL
32301
State of Florida
bcc w/encl:
(See
page 4)
Florida Power and Light Company
bcc w/encl:
G.
E. Edison.
Document Control
Desk
NRC Resident Inspector
U.S. Nuclear Regulatory
Commission
P. 0.
Box 57-1185
Miami. FL
33257-1185
RLM
RI~I ORP7
c-;.K::;~-
10/i: /89
10/4'= /89
I:0
RII:QRS
f/
ink le
KPerkins
10/
89 ., 10/-/89
RII'
D
"A
eyes
A ibs
10/4,'/89
10//1/89
0/ /8