L-89-378, Provides Sept 1989 Progress Summary of Select Sys Assessment
| ML17347B410 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/31/1989 |
| From: | Harris K FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-89-378, NUDOCS 8911150119 | |
| Download: ML17347B410 (5) | |
Text
ACCELERATED ISTRIBUTION DEMON TPA,TION SYSTEM Itt Qo REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8911150119 DOC.DATE: 89/10/31 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides Sept 1989 progress summary of select sys assessment.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL NRR/DEST/ADS 7E NRR/DEST/ICSB NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 5
5 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD REG FIL 01 NRC PDR NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
P.O. Box14000, Juno Beach, FL 33408-0420 L-89-378 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the September 1989 progress summary of the Select System Assessment.
Should there be any questions regarding this information, please contact us.
Very truly yours, K.
. Harris Vic President Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8911.1 05000250 g9103~
an FPL Group company
t
~
I 4
E
,ll t
SELECT SYSTEM REVIEW SEPTEMBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265)
Scheduled to be completed January 22, 1991 P&ID's (IS Mod 1098)
Scheduled to be completed December 29, 1989 CONFIGURATION MANAGEMENT
- Unit 4 Drawing Follow Up (IS Mod 8968)
Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)
MISCELLANEOUS ITEMS Unit 3
RHR 887 Valve Replacement (IS Mod 519)
Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)
Scheduled completion deferred, until the next Unit 4
Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)
Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P
& ID's (IS Mod 1042)
Scheduled for completion during next Unit 3 Refueling Outage P
& ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG
- Phase II Review scheduled for completion by October 15, 1989
- These actions were completed by the scheduled date.
<S t